Lilis Energy — Recovery Energy — Investor Presentation (June 2012)
20 slides from Lilis Energy's investor presentation, Jun 26, 2012
Slide 1: Corporate Overview
Corporate Overview Exchange / Symbol: NASDAQ: RECV Shares Issued / Out: 17.7 MM Company Headquarters: Denver, CO Net Leasehold: Approximately 125,000 Net Acres Average Working Interest: 90% Location / Counties: NE - Banner, Kimball, and Scotts Bluff WY - Carbon, Goshen, Laramie, and Platte CO - Adam
Slide 2: Executive Summary — DJ Basin Oil
Executive Summary — DJ Basin Oil @ Experienced Management Team + Over 80 years of experience in the DJ Basin @ Current Production and Opportunities + 35 operated wells with current production of approximately 300+ BOE/d* + 80+ lower-risk drilling locations identified; more in process + Expect to dri
Slide 3: Slide 3
Slide 4: Geologic Overview
Geologic Overview Multi-Horizon Prospective Formations Niobrara: Burgeoning new resource play seeing significant drilling activity in numerous areas. Hybrid shale/carbonate reservoir deposited in deep marine environment with areal variations in mineralogical content and tectonic overprint. Codell Sa
Slide 5: Conventional Production / Opportunities
CONVENTIONAL _ PRODUCTION / OPPORTUNITIES ~
Slide 6: Conventional Opportunities
Conventional Opportunities “J” Sandstone peremton, of “J” Sand Play Expansion of historical fluvial facies exploration into marine facies using current frac technology + Utilization of 3D seismic resulting in continuing new field discoveries on or near Recovery Energy leaschold in last few years Int
Slide 7: Conventional Opportunities Wykert Sandstone
Conventional Opportunities Wykert Sandstone @ Extension of Existing Wykert Production Along Trend. Eolian sandstone facies producing along stratigraphic pinch-out 3D seismic structure corrected for velocity in overlying anhydrite section of variable thickness @ Low Risk Drilling Targets 10+ infield
Slide 8: Slide 8
Slide 9: Conventional “J” Sand Economics
Conventional “J” Sand Economics @ Gross (8/8ths) Well on 40-Acre Spacing + WI-100%, NRI=80% Oil price constant $70/bb1 + OPEX=$4000/month, Severance Tax 6.6%, Advalorem Tax 6.8% + Three IP/EUR cases considered as noted below + Range of CWC CAPEX considered, from $700M to S900M + Wells can be drilled
Slide 10: Multi-Horizon Unconventional Opportunities Across the DJ Basin
MULTI-HORIZON UNCONVENTIONAL OPPORTUNITIES ACROSS THE DJ BASIN
Slide 11: Multi-Horizon Unconventional Prospective Formations
Multi-Horizon Unconventional Prospective Formations Niobrara: New resource play seeing significant drilling activity in numerous areas. Hybrid shale/carbonate reservoir deposited in deep marine environment with areal variations in reservoir properties and tectonic overprint, Recent data indicate sev
Slide 12: Life Cycle of a “Resource” Play
LIFE CYCLE OF A “RESOURCE” PLAY @ Discovery, immediately followed by Irrational Exuberance: “All the world’s a sweet spot...” @ Over-correction of the initial over-reaction, including public over- statements about the “spotty” nature of the play, and metrics required for success (“Needs to look like
Slide 13: Recent Hz Permits Shown with Recovery’s Acreage
"RECENT HZ PERMITS SHOWN WITH RECOVERY’S Recent Activity
Slide 14: Niobrara Tectonics and Fractured Reservoir
NIOBRARA TECTONICS AND FRACTURED RESERVOIR Optimization of Niobrara Production Must Account for Natural Fractures — Recovery Energy Maintains that Natural — Fracture Effects Cannot be Avoided, and Therefore Should be “Harnessed”
Slide 15: Slide 15
Slide 16: Herrington Farms and Similarity of Recovery Asset to Silo
Herrington Farms and Similarity of Recovery Asset to Same Geclagic Properties and Tectonic SERS, PLUS SHOWS iy Niob OTS during bittrip, 2010 ny my fo during drilling {GR shaded Wve < 150-98 4 Vere Eegaertion © Recovery Energy 2012 -reewajenergyacom
Slide 17: Herrington Farms and Similarity of Recovery Asset to Silo
——______ Herrington Farms and Similarity of Recovery Asset to Silo Same Geologic Properties and Tectonic Framework, PLUS SHOWS p = i Yor A
Slide 18: Conclusions/Hypotheses
Conclusions/Hypotheses Geologic Variability in Niobrara Oil Sub-plays @ Natural Fractures are the Single Most Critical Component of Successful Niobrara Oil Production for All Reservoir Types Including Proven Calcareous Mudstone Reservoirs, such as Silo, Wattenberg, and Hereford @ Attention to Natura
Slide 19: Conventional Development
Conventional Development (J) plus Unconventional | Investigation/Evaluation Hz Wells Permits by Operator Same, plus Active Pursuit of large 3D | Conventional Development in J and Permo-Penn, plus Unconventional Investigation and Evaluation ® ® Participation in Wattenberg | ® Development and Promotio
Slide 20: 2012 Drilling Program
2012 DRILLING PROGRAM @ 12-16 Well Conventional Drilling Program on 4 - 6 Prospect Areas + 2 wells drilled: Hanson 42-26 (J Sand-Pine Bluffs Arca), and Lukassen 44-7 (Wykert Sand-Wilke Area) Spudding 3 additional wells ~ Stateline area and Pine Bluffs area Review follow-up 3D seismic surveys to dire