Equus Mining — Monash Gold — Pitch Deck (April 2026)
12 slides from Equus Mining's pitch deck, April 2026
Slide 1: Equity Raising
VI CT O R I A N G OL D E X P L OR AT I ON Equity Raising C ON S O L I D A T I O N STRA TEGY 300 million shares @ $0.005 — raising $1.5 million April 2026 · Placement
Slide 2: Strategy
STRATEGY 1 Kingston and Toolleen with drill-ready targets STRATEGIC GOAL 2 Advanced discussions underway regarding further strategic acquisitions Consolidate Victorian Gold Exploration 3 Open discussions underway with owners of ML within Kingston Project re potential transaction Assets 4 Seek ASX re
Slide 3: Capital Structure
CAPITAL STRUCTURE Security Shares on Issue Options Existing FPO Shares 253,074,993 — Shares to AIS for Kingston 25,180,956 — Shares to AIS for Toolleen 25,180,956 — Share Issue @ 0.5c/share 300,000,000 — Performance Options — 60,000,000 TOTAL 603,436,905 60,000,000 Capitalisation @ 0.5c/share $3.02
Slide 4: Monash Gold Projects — Victoria
MONASH GOLD PROJECTS — VICTORIA Monash Gold Limited has acquired three gold exploration properties from AIS Resources (AIS:TSX.V): Kingston 120 km² Ararat 47 km² Toolleen 26 km² Monash Gold Project Locations M O N AS H G O LD LI M I TED 4 / 12
Slide 5: Kingston Project
KINGSTON PROJECT The 120 sq km Kingston Gold Project (EL6318) is located 37 km north-west from Stawell, Victoria. The Old Kingston Mine produced ~3,000 oz Au from shallow underground workings at 7.3 g/t Au (1900–1903). The Kingston EL surrounds a 150m × 350m Mining Lease operated by Connor Coote Min
Slide 6: Kingston Project — Exploration History
KINGSTON PROJECT — EXPLORATION HISTORY Previous exploration and drilling (mostly on Connor Coote Mining Lease): Significant Drilling Results — Mining Lease 1931–1932 BHP — sunk a shallow prospecting shaft north of the Old Kingston Mine shaft. 1986–1989 WMC recognised the potential for high-grade min
Slide 7: Kingston Project — Drill-Ready Targets
KINGSTON PROJECT — DRILL-READY TARGETS Numerous drill-ready targets identified: 1. Drill testing of NE-trending quartz breccia corridor — known to extend >1,200m. 2. Drill testing beneath old mine workings along trend. 3. Drill testing soil anomalies in SE of tenement — strong NW-trending As, Cr and
Slide 8: Ararat Gold Project
ARARAT GOLD PROJECT The 47 sq km Ararat Gold Project (EL6318) is located 10 km north of Ararat / 20 km south-east of Stawell, Victoria. Greenfields exploration project — located 20 km from the 5 Moz Stawell Gold Mine. Proximity to crustal-scale regional structures and large intrusive bodies provides
Slide 9: Toolleen Project — EL 6001 (Pending Renewal)
TOOLLEEN PROJECT — EL 6001 (Pending Renewal) The 26 sq km Toolleen Gold Project (EL6001) is located 35 km east of Bendigo and only 12 km east of the ~9 Moz Fosterville Gold Mine, Victoria. Advanced exploration project with several drill-ready targets. Located within the Bendigo Zone of the Lachlan F
Slide 10: Toolleen Project — Drilling & Targets
TOOLLEEN PROJECT — DRILLING & TARGETS Historical reef and alluvial gold mining at Toolleen — small scale underground mining until 1957 within 60m of surface. Historic drilling focused on top 70m. Modern exploration: field mapping, ground penetrating radar and air core drilling. A 31-hole RC program
Slide 11: Toolleen Project — Consolidation Opportunity
TOOLLEEN PROJECT — CONSOLIDATION OPPORTUNITY Potential consolidation opportunities with neighbouring tenement holders. Toolleen Project Area — Castlemaine Basin Setting The Castlemaine Basin setting shows the Toolleen Project positioned in the highly prospective Bendigo Zone, adjacent to the Fosterv
Slide 12: Directors
DIRECTORS John Braham Ted Coupland Damien Koerber Chairman Non-Executive Director Non-Executive Director Director since 2018 Director since 2021 Director since 2019 30 years experience as a mining finance and investment Over 35 years of experience in mining, exploration and Geologist with 35 years o