Phoenix Group Plc · ADX:PHX

Phoenix — Q3 2026 Earnings Presentation

19 slides from Phoenix's earnings presentation, October 2026

  1. Slide 1: Q3 2026 Earnings Call

    AnlHC eee eeevcee evoee eeceees eeces

  2. Slide 2: Disclaimer

    DISCLAIMER The information contained in this presentation is for background purposes only and does not purport relating to Phoenix Group associated companies, whether written, oral or in a visual or electronic form, to be full or complete. No reliance may or should be placed by any person for any pu

  3. Slide 3: Presenters: Munaf Ali and Sheharyar Malhi

    Mr. Munaf Ali Mr. Sheharyar Malhi Board Member, Co-founder & CEO CFO Earnings call – Q3/2026 3

  4. Slide 4: Table of Content

    Business Performance 05 AI Demand Outlook 08 Hyperscaler Investment 09 Powered Land Advantage 10 Phoenix's Pivot to AI 11 Project Lyon 12 Operational Metrics 14 Balance Sheet Review 16 Table of PnL Review 17 Content Optimization Initiatives 18 Earnings call - Q3/2026 4

  5. Slide 5: Business Performance - Q3'26

    Business Performance - Q3'26 Onmine, Phoenix Group's new crypto mining sites in Texas, have been energized with a total capacity of 38 MW and are equipped with S21 liquid-cooled miners. As low power-cost sites, they are expected to deliver a net improvement in gross margin going forward. Project Lyo

  6. Slide 6: Business Performance - Q3'26

    Business Performance - Q3'26 MINING EFFICIENCY Mining efficiency improved further to 18.5 J/TH in Q3'26, compared to 18.8 J/TH in Q2'26, representing a 42% improvement since Q3'24, driven by continued fleet optimization and 18.5 J/TH operational enhancements. ▲ 1.6% QOQ REVENUE COST PER BTC Phoenix

  7. Slide 7: Phoenix Pivot

    AnlHC i por tfolio Company = Phoenix Pivot 7 eevee eeevcee eeoeee eeceees eecee ecee eecee

  8. Slide 8: AI Demand Outlook

    AI Demand Outlook AI drives data-centre demand ~3x to ~278 GW by 2030, outrunning supply by ~45 GW Global data-centre capacity, demand vs supply1 Supply Demand ~70% of 2030 demand comes from AI training and inference, ~278 GW up from ~44% in 2025 ~233 GW ~45 GW shortfall of supply against demand in

  9. Slide 9: Hyperscaler Investment

    Hyperscaler Investment Hyperscaler capex nearly doubled to ~$417B in 2025 and is expected to reach ~$1.6T by 2030 Hyperscaler annual capex, global (% growth p.a.) +86% Hyperscaler capex jump in 2025, from a +31% p.a. historical run-rate of ~$100–200B a year $1,600B $1,400B $1,200B $1,005B $788B ~75%

  10. Slide 10: Powered Land Advantage

    Powered Land Advantage Powered land is one of the scarcest assets in the AI build-out, and Phoenix starts with 450 MW of it Power comes first Grid capacity takes time Powered land is a head start AI campuses are built where power New connections and network Owners of land with power and is available

  11. Slide 11: Phoenix's Pivot to AI

    Phoenix's Pivot to AI Phoenix is poised to capture this demand, with a 1+ GW pipeline across Europe, the US and the GCC From pipeline to first project, MW F IRST PROJECT Pipeline and long-term ambition Lyon, France 1+ GW Powered-site opportunities across Europe, the US and the GCC that Phoenix aims

  12. Slide 12: Project Lyon: Advancing Through RIBA Stage 2

    Project Lyon: Advancing Through RIBA Stage 2 Project Lyon, Phoenix Group's first European AI-ready data centre development, RIBA Stage 2 | Appointed Consortium has advanced into RIBA Stage 2 (Concept Design), marking a key milestone in the project's development. Lead Designer With 18MW gross of plan

  13. Slide 13: Performance: Operational & Financial

    Performance OPERATIONAL & FINANCIAL 13

  14. Slide 14: Operational Metrics - Q3'26

    Operational Metrics - Q3'26 OVERALL BUSINESS HASHING SHARE IN THE NETWORK CURRENT POWER CONSUMPTION 1.11% BTC MINING PER DAY ~234.76MW MINING EFFICIENCY 3.50 POWER COST PER KWH² 22.25MW/EHs 0.0496 (c) JV INVESTMENTS MINING HOSTING HASH RATE HASH RATE HASH RATE 4.92EHs 1.61 EHs 4.02 EHs HASHING SHARE

  15. Slide 15: Operational Metrics - Q3'26: Revenue, Margins, Efficiency

    Operational Metrics - Q3'26 REVENUE & INCOME MARGINS EFFICIENCY GROSS REVENUE BLENDED GROSS MARGIN USD 17.37 MN 39% HASH RATE 10.6 EH/s SELF MINING SELF MINING USD 13.29 MN 44% GLOBAL HASH RATE CONTRIBUTION 1.1% HOSTING HOSTING USD 4.06 MN 21% Earnings call - Q2/2026 15 Sources: PHOENIX GROUP PLC In

  16. Slide 16: Balance Sheet Review - Q3' 2026

    Balance Sheet Review - Q3' 2026 TOTAL ASSETS TOTAL DIGITAL ASSETS TOTAL EQUITY (USD MN) (USD MN) (USD MN) YoY: -28.4% YoY: -31.8% YoY: -44.3% QoQ: -9% QoQ: -8% 750.1 QoQ: -7% 731.8 328.8 592.6 541.9 537.3 197.5 499 183.1 Q3:25 Q2:26 Q3:26 Q3:25 Q:26 Q3:26 Q3:25 Q2:26 Q3:26 • Total assets stood at $5

  17. Slide 17: PnL Review - Q3' 2026

    PnL Review - Q3' 2026 TOTAL REVENUE EBITDA (EXC; COMPREHENSIVE INCOME (USD MN) CITADEL)(USD MN) (USD MN) YoY: -46% YoY: -269.4% QoQ: 406.7% YoY: -0.4% 29.1 0.806 QoQ: -9% QoQ: 333% 19.0 -0.27 -1.36 -43.4 -9.98 -43.2 17.3 Q3:25 Q3:26 Q3:26 Q3:25 Q2:26 Q3:25 Q2:26 Q3:26 Q2:26 • Gross revenue stood at

  18. Slide 18: Optimization Initiatives Paying Off

    Optimization Initiatives Paying Off SELF MINING GROSS MARGIN MINING EFFICIENCY (J/TH) AVG POWER PRICE ($/KWH) 23.0 8 21.9 20.5 6 6 19.5 3 18.8 1 18.50 Self-Mining Gross Margin remained strong at 44% in Q3’26, marginally up compared to 43% in Q2’26 despite continued volatility and competitive conditi

  19. Slide 19: Investor relations

    Investor relations [email protected] Abu Dhabi, United Arab Emirates 3612, 34 Floor, Al Maqam Tower, Regus Adam +971 4 323 9120 Square, Al Maryah Island, Abu Dhabi, UAE @phoenixgroupuae Dubai, United Arab Emirates @phoenixgroupuae Office 2901, Floor 29, Boulevard Plaza Tower 2, Burj @thephoenix

Phoenix Group — Q3 2026 Earnings Presentation on 6ix