Eastern Gas Corp Ltd · ASX:EGA

Eastern Gas — Investor Presentation (October 2026)

11 slides from Eastern Gas's investor presentation, Oct 27, 2026

  1. Slide 1: Appraising New East Coast Gas Supply

    rsonal use only APPRAISING APPRAISING NEW EAST COAST GAS SUPPLY NEW EAST COAST GAS SUPPLY Investor Presentation 27 October 2026

  2. Slide 2: Disclaimer

    Disclaimer Disclaimer Extent of Information This document has been prepared by Eastern Gas Corporation Ltd (“Company”). This Presentation, including the information contained in this disclaimer, does not constitute an offer, invitation or recommendation to subscribe for or purchase any security and

  3. Slide 3: Why Eastern Gas

    Why Eastern Gas Why Eastern Gas Strategic Gas Assets • Queensland gas assets with 100% rsonal use only ownership preserves full exposure to appraisal success • ~479 PJ* (2C) and ~970 PJ (3C)* certified gas resources \ • Located near established gas infrastructure • Focused on new East Coast gas supp

  4. Slide 4: Project Venus (ATP 2051) – Near-term Appraisal Focus

    Project Venus (ATP 2051) – Near-term Appraisal Focus Project Venus (ATP 2051) – Near-term Appraisal Focus Project Venus | ATP 2051 rsonal use only ✓ 130.3 PJ of 2C contingent gas resources provides material scale if commercial deliverability is demonstrated ✓ Walloon coal seam gas fairway ✓ Establis

  5. Slide 5: Venus-2H: Drilling Results

    Venus-2H: Drilling Results Geosteering Results Results announced 28 August 2026 Drilling measure Result rsonal use only Venus-1 intersection ~927m measured depth Total depth 1,450m measured depth Interpreted net coal 445m (cumulative) Continuous coal interval 148m (within total) Peak total gas readi

  6. Slide 6: Venus-2H Maximising Coal – Wellbore Contact

    Venus-2H Maximising Coal – Wellbore Contact Venus-2H Maximising Coal – Wellbore Contact Venus-1 provides the route rsonal use only to surface • Horizontal placement to test coal continuity and deliverability • Connection established by drilling • Venus-1 and Venus-2H form the integrated production-t

  7. Slide 7: Flow-testing Will Guide the Next Decisions

    Flow-testing Will Guide the Next Decisions Flow-testing Will Guide the Next Decisions Commission the System Measure Reservoir Response Evaluate the Project rsonal use only • Complete remaining well and surface • Monitor water rate and pressure • Integrate test results with the geological preparation

  8. Slide 8: Cooper Basin: Longer-term Upside Optionality

    Cooper Basin: Longer-term Upside Optionality 100% owned Project Windorah | ATP 927 rsonal use only Four historical wells flowed gas; commerciality remains to be established. Why Windorah Project? Commercial Approach • Established gas-producing basin • Evaluate partnering to share appraisal cost and

  9. Slide 9: Near-Term Supply Improved – Long Term Investment Remains Essential

    Near-Term Supply Improved – Long Term Investment Remains Essential Near-Term Supply Improved – Long Term Investment Remains Essential Near Term Balance Policy Status Investment Test rsonal use only • Near-term east coast supply • Consultation on the exposure-draft • Reservation can improve the adequ

  10. Slide 10: Experienced Board and Management

    Experienced Board and Management Experienced Board and Management Team with a proven track record of delivering oil and gas development projects Corporate Snapshot @ 26 October 2026 rsonal use only ASX Ticker EGA Shares on Issue 90m Share Price A$0.15 Market Cap $13.5M Performance Rights 9m Options

  11. Slide 11: Contact

    Contact Contact rsonal use only P +61 2 9955 4008 E [email protected] W www.easterngas.com.au David Spring P +61 497 000 177 E [email protected] 11