Slide 1: Connection & Compliance processes
Connection & Compliance processes Experts Group – Implementation NCs (session 1) Brussel, 25/01/2016 Ann Larsen
Slide 2: Agenda
Agenda 1 Network Codes requirements 2 Current versus Future 3 Procedure for type A Generators 4 Procedure for type B/C Generators 5 EON-ION-FON Procedure 6 Limited Operational Notification 2
Slide 3: Network Codes requirements
Network Codes requirements NC Categories of Grid Users Procedure NC Articles RfG Generators type A/B/C/D Scope of application Art. 3 RfG Generators type A/B/C/D Regulatory aspects Art. 7 Rfg Generators type A/B/C/D Generalities Art. 29 RfG Generators type A Installation Document Art.30 RfG Generator
Slide 4: Network Codes requirements
Network Codes requirements Rfg Art. 3 & DCC Art. 3/4 Application of the NCs to new users and for substantial modifications The definition of a substantial modification will be discussed later in the topic "Modernization of interconnection point". Rfg Art. 7 The topic "Compliance verification“ can in
Slide 5: Current versus Future connection process
Current versus Future connection process Current Process Main modifications of the NCs Publication of the operational notification procedure by the relevant system operator Connection Study Connection Contract EON = Energization Operational Notification Realization of the connection ION = Interim Op
Slide 6: Capacity reservation
Cia Capacity reservation Determined w reserve on permits
Slide 7: Process generators type A
Process generators type A New power generating module Relevant system operator Type A Complete the installation document Submit installation document • Installation document with at least (content specify by the NCs, Art. 30.2): • the location at which the connection is made • the date of the connec
Slide 8: Process generators type B/C
Process generators type B/C New power generating module (PGM) Relevant system operator Type B/C Complete the power generating module document (with a statement of compliance) Receive the PGMD per power generating module Issue a FON (Final Operational Notification) • Based on the RfG NC, Power genera
Slide 9: Operational notification procedure EON-ION-FON
Operational notification procedure EON-ION-FON Procedure applicable to: Compliance to demonstrate to: • Generators of type D • Demand facilities The relevant system operator • CDS • Distribution systems Energisation Operational Interim Operational Final Operational Notification (EON) Notification (I
Slide 10: Operational notification procedure - Requirements
Operational notification procedure - Requirements Energisation Operational Interim Operational Final Operational Notification (EON) Notification (ION) Notification (FON) - fulfilment TSO requirements - agreement on protection & control - Removal of all incompatibilities - Data and study review proce
Slide 11: Operational notification procedure – TSO Implementation
Operational notification procedure – TSO Implementation To be analyzed if it could be done simultaneously Letter Letter TSO issues the ION TSO issues the FON Letter Information TSO issues the EON update Grid users provides specified information EON ION FON Validity period LON max 24 months - Signifi
Slide 12: Limited operational notification (LON)
Limited operational notification (LON) Transmission connected demand facility TSO Distribution system connection Granted a FON Incident: ‐ temporary modification or loss of capability ‐ equipment failures leading to non‐compliance Inform TSO in the 24 hours (or a longer period if agreed) After 1 mon
Slide 13: Many thanks for your attention!
Many thanks for your attention! Ann Larsen ELIA SYSTEM OPERATOR Boulevard de l'Empereur 20 1000 Brussels +32 2 546 70 11 info@ elia.be www.elia.be An Elia Group company