Prosafe Se · OSL:PRS

Prosafe — Q4 2013 Earnings Presentation

42 slides from Prosafe's earnings presentation, Feb 10, 2014

  1. Slide 1: Q4 2013 results

    10 February 2014 Q4 2013 results

  2. Slide 2: Disclaimer

    Disclaimer All statements in this presentation other than statements of historical fact are forward-looking statements, which are subject to a number of risks, uncertainties, and assumptions that are difficult to predict and are based upon assumptions as to future events that may not prove accurate.

  3. Slide 3: Agenda

    Agenda Q4 2013 in brief Financial results Strategic repositioning Outlook 3

  4. Slide 4: Q4 2013 in brief

    Q4 2013 in brief Strong utilisation of 82 per cent High order intake in the quarter Three long-term contracts in Mexico Long-term contract extension in Brazil Contract for BP ETAP in UK Contract for Swiber in Indonesia Several shorter extensions for North Sea vessels Bond issue – NOK 700m, 5 years,

  5. Slide 5: Agenda

    Agenda Q4 2013 in brief Financial results Strategic repositioning Outlook 5

  6. Slide 6: Income statement

    Income statement (Unaudited figures in USD million) Q4 13 Q3 13 Q4 12 2013 2012 Operating revenues 134.8 159.4 113.1 523.5 510.4 Operating expenses (53.4) (50.8) (52.6) (216.9) (230.3) EBITDA 81.4 108.6 60.5 306.6 280.1 Depreciation (14.4) (18.2) (15.0) (61.5) (57.7) Operating profit 67.0 90.4 45.5

  7. Slide 7: Operating revenues

    Operating revenues (USD million) Q4 13 Q3 13 Q4 12 2013 2012 Charter income 120.4 146.0 94.0 469.2 423.9 Mob/demob income 3.7 0.0 0.0 9.1 2.0 Gain on sale of Safe Esbjerg 0.0 0.0 0.0 0.0 4.8 Other income 10.7 13.4 19.1 45.2 79.7 Total 134.8 159.4 113.1 523.5 510.4 7

  8. Slide 8: Balance sheet

    Balance sheet (Unaudited figures in USD million) 31.12.13 30.09.13 31.12.12 Goodwill 226.7 226.7 226.7 Vessels 946.9 926.2 896.3 New builds 248.9 152.5 135.6 Other non-current assets 4.9 16.5 21.9 Total non-current assets 1 427.4 1 321.9 1 280.5 Cash and deposits 113.4 118.0 103.6 Other current asse

  9. Slide 9: Key figures

    Key figures KEY FIGURES Q4 13 Q3 13 Q4 12 2013 2012 Operating margin 49.7 % 56.7 % 40.2 % 46.8 % 43.6 % Equity ratio 45.7 % 45.7 % 34.7 % 45.7 % 34.7 % Return on equity 33.0 % 49.9 % 34.6 % 31.7 % 48.4 % Net interest bearing debt (USD million) 666.2 613.7 706.8 666.2 706.8 Number of shares (1 000) 2

  10. Slide 10: Shareholders

    Shareholders SHAREHOLDERS AS AT 03.02.2014 No. of shares Ownership State Street Bank & Trust (nom) 32 323 779 13.7 % Folketrygdfondet 16 561 978 7.0 % State Street Bank & Trust (nom) 14 924 446 6.3 % Pareto 8 796 703 3.7 % Clearstream Banking (nom) 8 604 619 3.6 % FLPS 8 700 000 3.7 % JP Morgan Chas

  11. Slide 11: Steady growth in dividend

    Steady growth in dividend Declared an interim dividend equivalent to USD 0.16 per share The shares will trade ex- dividend on 14 February The dividend will be paid in the form of NOK 1 per share on 28 February 11

  12. Slide 12: Interest-bearing debt portfolio

    Interest-bearing debt portfolio Loan Commitment Maturity Margin USD 1100 million credit facility (2011-17) USD 791 million Q3 2017 187.5 bps USD 420 million credit facility (2012-17) USD 420 million Q4 2017 295 bps NOK 500 million bond (2011-16) NOK 500 million Q1 2016 350 bps NOK 500 million bond (

  13. Slide 13: Agenda

    Agenda Q4 2013 in brief Financial results Strategic repositioning Outlook 13

  14. Slide 14: Ambition – start of strategy process

    Ambition – start of strategy process Lowest Best cost vessels Best client service Best operations 14

  15. Slide 15: Strategic repositioning

    Strategic repositioning 2009 2016 North Sea fleet refit and life extensions NCS new builds Assets UK/RoW new builds Re-organisation People and processes Ways of working 15

  16. Slide 16: North Sea fleet – refit and life extension

    North Sea fleet – refit and life extension Objective Ensure availability of versatile vessels with safe, efficient and comfortable facilities Actions Refurbish vessels to achieve renewal of hull, machinery and facilities for another 20 years of operation 16

  17. Slide 17: Scandinavia SPS and life extension

    Scandinavia SPS and life extension Aim: operate in NCS or UK waters, with 12 point mooring for 20 years (2014-2034) Five year Special periodic survey (SPS) Q1 2014 Including fatigue enhancement Increase vessel capabilities Improved station-keeping with new anchor windlasses & chain (best in class) M

  18. Slide 18: Regalia SPS

    Regalia SPS Five-year special periodic survey (SPS) Q1 2014 Including fatigue enhancement Increase vessel capabilities More functional cranes Gangway improvements Augment the health and safety of those working and living onboard Refurbishment of some interiors 18

  19. Slide 19: New builds compliant with Norwegian regulations

    New builds compliant with Norwegian regulations Objectives Be the most cost effective and versatile vessels for year-round operations in the Norwegian waters in terms of: Positioning, either through DP3 or 12 point wire-moored Marine capabilities/motions and gangway uptime Safe working environment –

  20. Slide 20: Prosafe new builds aim at being the best - Norway

    Prosafe new builds aim at being the best - Norway Thruster power (kW) Combined mooring strength (tonnes) 25000 10000 24000 9000 23000 8000 22000 7000 21000 6000 20000 5000 19000 4000 18000 3000 17000 2000 16000 1000 15000 0 Safe Safe Floatel Floatel Axis Nova Axis Vega Safe Safe Floatel Floatel Axis

  21. Slide 21: Safe Boreas

    Safe Boreas Pontoons launched 5 and 9 Nov 2013 – then docked First 2 columns raised on pontoons in dock Nov 2013 LQ mega blocks transported from subcontractor to Jurong for outfitting Cabin fabrication in Korea, first batch has arrived in Singapore Financial status Q4 13 USDm Book value o.b. 84 Book

  22. Slide 22: Safe Zephyrus

    Safe Zephyrus Keel lay – 18 November 2013 Good progress in block fabrication Outfitting started Financial status Q4 13 USDm Book value o.b. 68 Book value c.b. 69 Capitalised in quarter 1 Estimated total cost 350 22

  23. Slide 23: Newbuilds for UK/RoW, excl. Norway

    Newbuilds for UK/RoW, excl. Norway Objectives Be the most versatile vessels for year-round operations in UK/RoW , excl. Norway in terms of: Positioning, either DP3 or 10 point chain-moored Marine capabilities/motions and gangway uptime Safe working environment Accommodation facilities Crane capacity

  24. Slide 24: Safe Eurus and Safe Notos

    Safe Eurus and Safe Notos Strong capabilities The most advanced and flexible vessels for worldwide operations excluding Norway Low risk Number 3 and 4 in a series of Gusto MSC Ocean 500 units built by Cosco Ready for operations in 2016 Source: Gusto MSC 24

  25. Slide 25: Prosafe newbuilds aim at being the best – UK/RoW

    Prosafe newbuilds aim at being the best – UK/RoW Thruster power (kW) Combined mooring strength (tonnes) 23000 8000 22000 7000 21000 6000 20000 5000 19000 4000 18000 3000 17000 2000 16000 1000 15000 0 Safe TBN1 Safe TBN2 Floatel Floatel Cotemar Cotemar Safe TBN1 Safe TBN2 Floatel Floatel Cotemar Cote

  26. Slide 26: Large and versatile North Sea fleet in good condition

    Large and versatile North Sea fleet in good condition Safe Boreas – new build Safe Zephyrus – new build Safe Notos – new build Safe Eurus – new build Safe Scandinavia – life extension in 2014 (20 years) Safe Caledonia – life extension in 2013 (20 years) Regalia – life extension in 2009 (20 years) Sa

  27. Slide 27: Capital expenditure 2013

    Capital expenditure 2013 Capex in line with indication of USD 130-150 million In addition, Safe Eurus/Notos first yard instalments paid in December 2013 Total of USD 223 million in 2013 Major items Safe Caledonia life extension completion Safe Scandinavia SPS, mooring winches and life extension Rega

  28. Slide 28: Capital expenditure 2014

    Capital expenditure 2014 Total capex USD 420-480 million General indication of yearly average fleet capex of USD 50-60 million, excluding new builds and special projects/items New builds and special projects Safe Boreas new build, 80 per cent of yard cost to be paid at delivery Safe Zephyrus new bui

  29. Slide 29: Agenda

    Agenda Q4 2013 in brief Financial results Strategic repositioning Outlook 29

  30. Slide 30: Clear market leader in the high-end segment

    Clear market leader in the high-end segment No. of accommodation semis by owner* No. of accommodation semis by regional capabilites* 34 34 32 POSH 32 30 30 Axis Off. 28 28 26 Jasper 26 24 24 22 CIMC 22 Rest of World 20 ETESCO 20 18 18 16 FOE 16 UK 14 COSL 14 12 12 Norway 10 Pemex 10 8 8 Cotemar 6 6

  31. Slide 31: North Sea - robust demand

    North Sea - robust demand Ivar Aasen development solution Good demand for hook-up work Driven by exploration success, particularly in Norway Prosafe already has contracts in place for Edvard Grieg (Lundin), Ivar Aasen (Det norske) and Mariner (Statoil) hook-up and commissioning projects Existing inf

  32. Slide 32: North Sea - robust demand

    North Sea - robust demand High order intake in the North North Sea accommodation demand index Sea in Q4 2013 and in 2013 in 120 112 109 general 110 101100 103 106 99 100 Good contract visibility in the 100 90 91 90 87 90 North Sea 77 81 79 76 78 80 70 65 67 64 60 Demand index shows robust 50 demand

  33. Slide 33: North Sea dayrates (time charter)

    North Sea dayrates (time charter) 400 350 300 250 USD k 200 150 100 50 0 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan-10 Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Safe Boreas Safe Zephyrus Regalia Safe Caledonia Safe Scandinavia Safe Bristolia (12-point mooring & DP3) (12-point moorin

  34. Slide 34: Mexico - stable demand outlook

    Mexico - stable demand outlook Continued stable outlook in Mexico demonstrated by recent contracts for Regency, Lancia, and Jasminia Multiple years contract renewals, but slightly lower dayrates Currently accommodation vessels in operation at the Cantarell field and adjacent areas Longer term it is

  35. Slide 35: Gulf of Mexico dayrates (bareboat)

    Gulf of Mexico dayrates (bareboat) 100 90 80 70 60 USD k 50 40 30 20 10 0 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan-10 Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Safe Britannia Safe Regency Safe Lancia Safe Concordia Safe Bristolia Safe Hibernia Jasminia (9-point mooring & DP2) (8-p

  36. Slide 36: Brazil – growth market

    Brazil – growth market Long-term requirements, mainly driven by maintenance Hook-up work can appear longer term Many different types of accommodation solutions in operation/contracted in Brazil All vessels required so far have gone to the Campos basin Concordia, three-year contract extension from Ju

  37. Slide 37: Rest of the world – interesting opportunities

    Rest of the world – interesting opportunities Australia Sporadic activity although the area is evolving Several contract awards at attractive economics South East Asia Dominated by low dayrate, basic barges due to benign weather conditions Some demand for semis related to mid and deep water work Saf

  38. Slide 38: Rest of world dayrates (time charter)

    Rest of world dayrates (time charter) 300 250 200 USD k 150 100 50 0 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09 Jan-10 Jan-11 Jan-12 Jan-13 Jan-14 Jan-15 Jan-16 Jan-17 Jan-18 Regalia Safe Caledonia Safe Concordia Safe Scandinavia Safe Bristolia Safe Astoria (DP3) (10-point mooring & DP2) (4-point moo

  39. Slide 39: Consistent high fleet utilisation

    Consistent high fleet utilisation High fleet utilisation Considerable fleet size means lower risk and less volatility Low counter-party risk Clients are typically national oil companies, super majors and larger independents 39

  40. Slide 40: High contract visibility

    High contract visibility Safe Zephyrus Safe Boreas Safe Scandinavia Regalia Safe Notos Safe Eurus Safe Caledonia Safe Bristolia Safe Astoria Safe Concordia Safe Hibernia Safe Britannia Safe Regency Safe Lancia Jasminia 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Contra

  41. Slide 41: Record high contract backlog

    Record high contract backlog 1 600 Firm contracts USD 1,258m + Options USD 431m 1 400 = Total contract backlog USD 1,689m 1 200 2013 0% 1 000 2017-19 2017-19 21 % 2014 USD million 21 % 29 % 800 600 2016 212016 % 21 % 400 2015 29 % 200 Options Firm contracts 0 Q2 Q3 Q3Q4Q4Q1Q1Q2Q2Q3Q3Q4Q4 Q1Q1Q2Q2 Q3

  42. Slide 42: Prosafe is well positioned

    Prosafe is well positioned Well positioned to meet a potential increase in demand and competition, by having: a record high order backlog the largest and most versatile fleet the best and longest operational and HSEQ track-record the most efficient cost and financing structure 42

Prosafe — Q4 2013 Earnings Presentation on 6ix