Gcm Corp., Ltd. · ASX:GCM

Gcm — TopTung — Shareholder Meeting (November 2016)

14 slides from Gcm's shareholder meeting presentation, Nov 11, 2016

  1. Slide 1: AGM Presentation - Torrington Project

    TOPTUNG LIMITED ABN 12 118 788 846 AGM PRESENTATION - TORRINGTON PROJECT UPDATE ON METALLURGICAL TESTWORK FOCUSED ON GRAVITY RECOVERY OF TUNGSTEN Dr Leon Pretorius – Executive Chairman 11 November 2016

  2. Slide 2: Disclaimer

    DISCLAIMER TopTung Limited has prepared this presentation based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation. To the max

  3. Slide 3: Company Snapshot

    COMPANY SNAPSHOT TOPTUNG LIMITED (ASX: TTW) As at 30 September 2016 1. Capital Structure and Cash Number of shares on issue 114,935,740 Share price - average past three months $0.03 Market capitalisation $3.45 million Cash $4.4 million Cash backing per share 3.8 cents per share No options Nil 2. Boa

  4. Slide 4: Company Snapshot (continued)

    COMPANY SNAPSHOT (continued) 3. Top 10 Shareholders (as at 31 October 2016) No. Shares % 1. Resolve Geo Pty Ltd 17,100,000 14.88 2. Dr Leon Eugene Pretorius 7,800,000 6.79 3. FWMI Pty Ltd 5,744,897 5.00 4. Southern Reaches Pty Ltd <The Kern Super Fund A/C> 5,574,907 4.85 5. Cryptodome Pty Ltd <The W

  5. Slide 5: Project Status

    PROJECT STATUS • Drilling to increase the resources has not been possible since acquisition due to permitting delays which are now essentially resolved • Drilling around the historical Burnt Hut, Wild Kate and Mt Everard workings is scheduled to commence in January 2017 pending favourable weather co

  6. Slide 6: Mineral Processing and Products

    MINERAL PROCESSING AND PRODUCTS • The host rock is silexite, composed mostly of an intergrowth of quartz 80% and topaz 20% • The tungsten occurs as Ferberite, a tungsten-iron oxide in large masses or finely disseminated • Ferberite has a high density and can be separated after crushing using simple

  7. Slide 7: Results of Bulk Sample Testing Phase

    RESULTS OF BULK SAMPLE TESTING PHASE CRUSHING AND SCREENING: • Following earlier phases of testwork on portions of the bulk sample to formalise a processing route, the remaining 720kg with an average grade of 0.36% W was then processed accordingly • First step was wet impact crushing to minus 1mm an

  8. Slide 8: Results of Bulk Sample Testing Phase (Cont)

    RESULTS OF BULK SAMPLE TESTING PHASE (Cont) PRIMARY SPIRAL CONCENTRATION OF +300MICRON PRODUCT: • The calculated head grade of the +300micron fraction was 0.14%W • Spiral concentration on the +300micron fraction showed a recovery of 58.4% of the test feed to concentrate grading 3.2% W in 5.2% mass y

  9. Slide 9: Overall Recovery via Spiral Concentration

    OVERALL RECOVERY VIA SPIRAL CONCENTRATION Assay Product Mass (%W) Units Distribution (g) Fract'n % Cum %. Fract'n Cum. % W Fract'n % Cum %. -300um Spiral Conc 1 19733 2.7 2.7 9.00 9.00 1775.9 68 68.0 +300um Spiral Conc 11430 1.6 4.3 3.20 6.87 366.18 14 82.0 -300um Spiral Conc 2 4987 0.7 5 2.12 6.22

  10. Slide 10: Overall Spiral Recovery vs Mass Yield

    OVERALL SPIRAL RECOVERY VS MASS YIELD

  11. Slide 11: Overall Spiral Grade vs Mass Yield

    OVERALL SPIRAL GRADE VS MASS YIELD

  12. Slide 12: Criteria Applied for Tungsten Plant Flowsheet

    CRITERIA APPLIED FOR TUNGSTEN PLANT FLOWSHEET A much simpler flowsheet (see next slide) compared to what was envisaged has resulted from (a) the highly successful X-ray Transmission (XRT) ore sorting trials (ASX 18 October 2016) and (b) the equally successful magnetic separation testwork on cleaning

  13. Slide 13: Flowsheet of Tungsten (and Topaz) Recovery Plant

    FLOWSHEET OF TUNGSTEN (AND TOPAZ) RECOVERY PLANT

  14. Slide 14: Competent Person Statement

    COMPETENT PERSON STATEMENT The information in this presentation that relates to metallurgical testwork for the Torrington Project is being conducted under the supervision of Dr Leon Pretorius. Dr Pretorius is the Executive Chairman of TopTung Ltd and is a Fellow of the Australasian Institute of Mini