Talisman Mining Limited · ASX:TLM
Talisman Mining — Investor Presentation (May 2012)
37 slides from Talisman Mining's investor presentation, May 2012
Slide 1: Closing in on world-class copper-gold deposits
ASX:TLM Closing in on world-class copper-gold deposits Corporate Presentation May 2012
Slide 2: Disclaimer and Competent Person's Statements
Disclaimer and Competent Person’s Statements Disclaimer This presentation is not a prospectus nor an offer for securities in any jurisdiction nor a securities recommendation. The information in this presentation is an overview and does not contain all information necessary for investment decisions.
Slide 3: Talisman – Established Business Model
Talisman – Established Business Model Creating shareholder value Organic growth through exploration success Systematic and scientific approach Funding capacity Strong internal team capability Active business development 3
Slide 4: Talisman – Corporate Overview
Talisman – Corporate Overview Capital Structure Shares 131.5M Unlisted Options 15.2M Market Capitalisation $63.5M* *Undiluted @ 48cps Cash $36M Listed Investments Rico Resources 35.5m Shares (~$5.5M @ $0.15) Management Gary Lethridge (Managing Director) Graeme Cameron (Technical Director) Dan Madden
Slide 5: Talisman – The Projects
Talisman – The Projects Key focus is the Bryah Basin copper- gold region Springfield Halloween Murchison Gold Projects Livingstone Muddawerrie Thinking BIG in the Gascoyne for IOCG and Ni-Cu-PGE deposits Shelby Milgun 5
Slide 6: Springfield – The Flagship Project
Springfield – The Flagship Project 6
Slide 7: Springfield – The Flagship Project
Springfield – The Flagship Project 7
Slide 8: Springfield – The Flagship Project
Springfield – The Flagship Project Located within an emerging volcanogenic massive sulphide (VMS) copper-gold province Adjacent to Sandfire’s world-class DeGrussa VMS deposit 14.33Mt @ 4.6% Cu and 1.6g/t Au* Potential for multiple high grade copper-gold deposits Historically under-explored province
Slide 9: Evolution of a Volcanogenic Massive Sulphide Deposit
Evolution of a Volcanogenic Massive Sulphide Deposit * Note – Animated Sequence 9
Slide 10: Springfield – The Growing Evidence
Springfield – The Growing Evidence Invested $13M over two years Vital high quality, extensive data sets assembled Cutting edge VMS targeting technology used to identify: SOURCE (Metals and Heat) PATHWAY/FOCUS (Major Crustal Structures) HOST (Ancient Sea Floor) TRAP (Metal Deposition) 20 fully integr
Slide 11: Springfield - The Targets
Springfield - The Targets * Note – 3D Animated Flythrough 11
Slide 12: Springfield - The Growing Evidence: Detailed Geological Mapping
Springfield - The Growing Evidence Detailed Geological Mapping
Slide 13: Springfield - The Growing Evidence: VMS Horizons
Springfield - The Growing Evidence Identification of VMS Horizons
Slide 14: Springfield - The Growing Evidence: Copper Intercepts
Springfield - The Growing Evidence + 0.1% Copper Intercepts
Slide 15: Springfield - Magnetic Edge Detection
Springfield - The Growing Evidence Magnetic Edge Detection
Slide 16: Springfield - Regional Structures
Springfield - The Growing Evidence Identification of Regional Structures
Slide 17: Springfield - Gravity Edge Detection
Springfield - The Growing Evidence Gravity Edge Detection
Slide 18: Springfield - Cross-cutting Structures
Springfield - The Growing Evidence Identification of cross-cutting structures
Slide 19: Springfield - Magnetic and Structural Complexity
Springfield - The Growing Evidence Identification of magnetic and structural complexity
Slide 20: Springfield – Tier-one Targets
Springfield – Tier-one Targets
Slide 21: Springfield – Closing in on a Discovery
Springfield – Closing in on a Discovery Advanced from reconnaissance to targeted exploration Geological understanding substantially advanced 20 Tier-One copper-gold target areas identified Sustained 11,000 metre drilling programme underway 21
Slide 22: Halloween VMS Project
Halloween VMS Project Milgun Project Livingstone Muddawerrie Project Kilometers 0 25 50 / Meekatharra @ { —— Major Fault Lines { 4) Bluebird Mine 22 TALISMAN A DeGrussa Mine Project f tignes Mine y ~ xX Halloween Pro Plutonic Mine Y Magellan Mine 4 LIMITED Marymia Mine a Wiluna e@ Port Hedland . = M
Slide 23: Halloween VMS Project
Halloween VMS Project Located 11.5km SW of DeGrussa copper-gold Deposit Interpreted stratigraphy prospective for DeGrussa style mineralisation 2,000m, maiden RC drilling program completed to test strong coincident copper and gold anomalism 23
Slide 24: Halloween Project – Maiden Drilling Program
Halloween Project – Maiden Drilling Program RC drilling intersected gold across 3 out of 4 drill traverses Significant drill intercepts: HRC002 - 9m @ 3.8g/t Au from 84m including: 4m @ 7.37g/t Au from 84m 1m @ 14g/t Au from 86m HRC006 - 6m @ 1.52g/t Au from 18m including: 2m @ 3.26g/t Au from 20m K
Slide 25: Halloween Project
Halloween Project 716300 716700 717100 717500 fi 1 L i Legend @ = 2012 RC drill holes —- Structure <> FLEM Conductor 8 8 4 Simplified Geology Lithology tS (7) Basalt Dolerite Mafic/Ultramafic schist 26m @ 0.42 g/t Au |__| Volcanic sediment | incl. Im @ 5.93 g/t Au ZA Prospective VMS corridor 1m @ 1.
Slide 26: Livingstone Gold Project
26 Livingstone Gold Project TALISMAN MINING LIMITED
Slide 27: Livingstone Gold Project
Livingstone Gold Pro Milgun Project Muddawerrie Project Kilometers 0 25 50 / Meekatharra @ { —— Major Fault Lines { 4) Bluebird Mine 27 Halloween Pro, = x | ect Plutonic Mine Y A DeGrussa Mine ‘ ‘. \@ N85 Noe, % X Magellan Mine 4 TALISMAN MINING LIMITED \%, \ Marymia Mine a \ %. % Wiluna e@ Port Hed
Slide 28: Livingstone Gold Project
Livingstone Gold Project Exploring for large scale, stand alone gold opportunities Prospective geological setting Over 31km strike length Widespread historic high-grade gold intercepts Target generation in process Soil sampling Detailed geological mapping Structural review Drilling planned to commen
Slide 29: Livingstone Gold Project – Plus 1g/t Au Intercepts
Livingstone Gold Project – Plus 1g/t Au Intercepts 29
Slide 30: Livingstone Gold Project – Areas of Interest
Livingstone Gold Project – Areas of Interest 30
Slide 31: Livingstone Gold Project
Livingstone Gold Project Intensive structural, geological mapping and soil sampling programs underway Target generation in progress Drilling planned during June quarter 2012 31
Slide 32: Gascoyne Projects – Thinking Big
Gascoyne Projects – Thinking Big 32
Slide 33: Gascoyne Projects – Thinking Big
Gascoyne Projects – Thinking Big Exploring for world class, large scale mineral deposits along the northern Bryah Basin margin Iron Oxide Copper Gold (IOCG) Mafic-Ultramafic intrusive related Ni-Cu PGE First mover opportunity Cheap and straight forward project entry Application of cutting edge techn
Slide 34: Gascoyne Projects – Thinking Big
Gascoyne Projects – Thinking Big 34
Slide 35: Gascoyne Projects – Thinking Big
Gascoyne Projects – Thinking Big Visible Chalcopyrite SHD001A Detailed airborne magnetic and gravity data collected over project Major structures and magnetic target identified Key large scale magnetic targets identified Positive first phase drilling completed confirming IOCG style alteration with a
Slide 36: Closing in on World Class Copper-Gold Deposits
Closing in on World Class Copper-Gold Deposits Exposure to potential world class opportunities Springfield and Halloween Copper-Gold Projects High grade, high value discovery potential Livingstone Gold Project Exploring for large, stand alone gold deposits Gascoyne Projects Potential Game changer Ca
Slide 37: Closing in on world-class copper-gold deposits
ASX:TLM Closing in on world-class copper-gold deposits Corporate Presentation May 2012