  1. Slide 1: Building an Inventory at the Mt Alexander Nickel-Copper Sulphide Discovery

    Building an Inventory at the Mt Alexander Nickel-Copper Sulphide Discovery 20 November 2018 ASX: SGQ

  2. Slide 2: Strategic Objectives

    ST GEORGE MINING LIMITED Strategic Objectives St George Mining Limited |

  3. Slide 3: Emerging Nickel Company

    Emerging Nickel Company St George is in the high growth phase of its corporate life Stage 3 Shareholder Value $$$ Stage 2 Stage 1 Methodical exploration to scope the scale of the discovery Acquisition of quality Drill, drill, drill with aim exploration project at of building a resource Mt Alexander

  4. Slide 4: 2018 – The Year of Investigators

    2018 – The Year of Investigators Best drill results to date increase grade and scale potential at Investigators MAD127 (XRF readings, assays pending): 12.02m of mineralisation from 180m including 6.39m @ 8.08%Ni and 5.06%Cu 184.2m MAD126 (XRF readings, assays pending): 14.37m of mineralisation from

  5. Slide 5: Scale is Unfolding

    Scale is Unfolding 25 drill holes completed at Investigators for 5,049m of drilling in 2018 to date Widespread nickel-copper sulphides intersected plus significant down plunge extensions to the north-northwest Left and Above: plan view map of Investigators set against SAMSON EM data. Pink/red areas

  6. Slide 6: 2019 – Growth Initiatives

    2019 – Growth Initiatives Building a Resource Inventory Resource Definition: • Continue extensional and infill drilling to support delineation of a resource estimate Review Mining Potential: • Initiate studies to assess the potential for a low cost/high margin mining operation at Mt Alexander Region

  7. Slide 7: Nickel Market Dynamics are Changing

    Nickel Market Dynamics are Changing 7

  8. Slide 8: Upswing in Cycle

    Upswing in Cycle Decreasing Stockpiles Support a Rising Nickel Price: Chart: 10 year price chart against LME stockpiles shows clear long-term trend Glencore note “demand is much stronger than most market participants recognise, and the deficit is much higher than people think”, noting a substantial

  9. Slide 9: EV Demand

    EV Demand Nickel Demand Rises on Electric Vehicle Revolution • Nickel sulphide (Class 1 nickel) is required for EV batteries; nickel pig iron, etc (Class 2) is not suitable for batteries • 1Mt deficit in 2025 = price pressure UBS, Miner’s Price Review, June 2018: “EV battery demand is emerging faste

  10. Slide 10: Nickel Price to Outperform

    Nickel Price to Outperform LME Week, 8 October 2018 – 55% of metal traders vote nickel as the most exciting commodity for upcoming 12 months Macquarie Wealth Management, UBS, Miner’s Price Review, June 2018: 15 November 2018: Best Commodities on Risk/Return ?  Nickel prices are at “unsustainably lo

  11. Slide 11: St George – Corporate Overview

    St George – Corporate Overview 11

  12. Slide 12: Market Profile and Capital Structure

    Market Profile and Capital Structure Listed shares (SGQ): 298,116,211 Share Ownership Listed options (SGQOB): 24,579,714 Top 10: 19% Top 20: 27% SGQOB - exercise price of 20c, expiring on 30 Sept 2020. Directors: 6% Market cap: A$42m (@14 per share) Cash: A$3.8m (at 30 Sept 2018) Largest Shareholder

  13. Slide 13: Highly Qualified Team

    Highly Qualified Team Directors, Management and Consultants with a Track Record of Success John PRINEAS, Executive Chairman – founding shareholder with over 25 years experience in mining, and the banking and legal sectors servicing the resources industry. Tim HRONSKY, Technical Director – over 25 ye

  14. Slide 14: The Discovery at Mt Alexander

    The Discovery at Mt Alexander 14

  15. Slide 15: Mt Alexander

    Mt Alexander Favourable Location Three Projects in Western Australia: • Stable and reliable mining jurisdiction MT ALEXANDER DISCOVERY • Exceptional discovery in Western Australia • High-grade nickel-copper sulphides in a low risk jurisdiction Favourable Location: • Located S-SW of world class nicke

  16. Slide 16: Exceptional Nickel-Copper Sulphide Discovery

    Exceptional Nickel-Copper Sulphide Discovery Cathedrals Belt Discovery at Shallow Depths: • Massive sulphide mineralisation 30m from surface • Intrusive system with potential for significant mineralisation at depth High Grade and Polymetallic: • Nickel sulphide plus copper, cobalt and PGEs • Key hig

  17. Slide 17: Large Mineral System

    Large Mineral System • Investigators, Stricklands and Cathedrals Prospects are located within the 4.5km strike of the Cathedrals Belt – each with increasing resource potential • Definition drilling underway to fully scope the scale of the discovery Above: Mt Alexander tenements against RTP magnetics

  18. Slide 18: Grade is King

    Grade is King Wide intersections of high-grade Ni-Cu-Co-PGEs 2017 – some of the best intersections (with assays): MAD71 (Stricklands Prospect): 17.45m @ 3.01%Ni, 1.31%Cu, 0.13%Co and 1.68g/t total PGEs from 37.45m, including 5.3m @ 4.39%Ni, 1.45%Cu, 0.21%Co and 2.09g/t total PGEs from 39.3m; and 2.0

  19. Slide 19: Extensions of High-Grade Mineralisation

    Extensions of High-Grade Mineralisation 19

  20. Slide 20: Investigators Prospect

    Investigators Prospect Unlocking a Major Mineralised System  High powered SAMSON electromagnetic (EM) survey identifies large areas of EM conductivity indicating potential for extensive sulphide mineralisation  Mineralised ultramafic unit dips 30 degrees to the north  Drilling on three north-sout

  21. Slide 21: Plunge Increased by Latest Drilling

    Plunge Increased by Latest Drilling Drilling and downhole EM surveys used concurrently to identify more high-grade mineralisation at depth  MAD60 Line (approx. 231225E) has down plunge strike of high- grade mineralisation to 320m  DHEM in MAD119, a 150m step- out to the north, has identified a str

  22. Slide 22: MAD111 Line

    MAD111 Line Thickest Massive Sulphides at Investigators MAD126 and MAD127 - thick massive sulphides with +8%Ni and +4%Cu Strong EM conductors up-dip and down plunge (e.g. circa 200,000 Siemens) Channelised lava flow with likely extensions of mineralisation Above: Schematic cross section of the MAD11

  23. Slide 23: Stricklands Prospect

    Stricklands Prospect +400m strike with wide intercepts  Multiple high-grade hits including drill hole MAD71: 17.45m @ 3.01%Ni, 1.31%Cu, 0.13%Co and 1.68g/t PGEs from 37.45m, including the massive sulphide zones of: 5.3m @ 4.39%Ni, 1.45%Cu, 0.21%Co and 2.09g/t PGEs from 39.3m; and 2.02m @ 5.05%Ni, 2

  24. Slide 24: Cathedrals Prospect

    Cathedrals Prospect High grade mineralisation on two surfaces  Numerous intersections of nickel-copper sulphides on two surfaces – the Cathedrals ultramafic and the footwall fault below including MAD56: 7.5m @ 3.90%Ni, 1.74%Cu, 0.12%Co and 3.32g/t total PGEs from 57.8m, including 3.15m @ 6.36%Ni, 2

  25. Slide 25: Metallurgical Testwork

    Metallurgical Testwork High Recoveries from Ore: • >99% recoveries of Ni and Cu to concentrates from preliminary testwork on massive sulphides Clean Concentrate: • No deleterious elements like MgO, talc or arsenic Standard Flotation: • Separate nickel and copper concentrates produced by standard flo

  26. Slide 26: Opportunity for Low Cost/High Margin Project

    Opportunity for Low Cost/ High Margin Project Key project features support favourable project The location and quality of the Mt economics which will be assessed by Alexander Project presents: scoping/feasibility studies  Multiple potential development and processing options (subject to Shallow Min

  27. Slide 27: Upside with Regional Exploration

    Upside with Regional Exploration 27

  28. Slide 28: Mt Alexander Belt

    Mt Alexander Belt Underexplored belt with proven massive nickel sulphides  Mt Alexander Belt is north-northwest trending with a strike of 7km  Historical drilling has intersected widespread nickel sulphides including massive sulphides  Prior drilling completed mostly as wide-spaced drill holes (u

  29. Slide 29: Northern Areas

    Northern Areas Potential for Parallel Mineralised Structures  New high resolution magnetic data for the northern tenements – E29/548 and E29/954 – has recognised east-northeast structures parallel to the Cathedrals Belt  These structures may represent ultramafic sequences similar to the Cathedrals

  30. Slide 30: St George Mining: creating shareholder wealth through exploration success

    St George Mining: creating shareholder wealth through exploration success Above: diamond drill rig at Stricklands, Cathedrals Belt. Right: Drill core from MAD108. 30

  31. Slide 31: Disclaimer: Competent Person Statement

    DISCLAIMER: Certain statements contained in this presentation, including information as to the future financial or operating performance of St George Mining Limited (ASX:SGQ) and its projects, are forward looking statements: -may include, among other things, statements regarding targets, estimates a