Capital Power Corporation · TSX:CPX

Capital Power — Corporate Update (November 2012)

7 slides from Capital Power's corporate update, Nov 21, 2012

  1. Slide 1: Port Dover and Nanticoke Wind Project Overview

    Port Dover and Nanticoke Wind Project Project Overview November 21, 2012 6:30-8:30 p.m. Jarvis Community Centre

  2. Slide 2: Capital Power

    Capital Power Capital Power (CPX:TSX) is a growth-oriented North American power producer headquartered in Edmonton, Alberta. The company develops, acquires, operates and optimizes power generation from a variety of energy sources. Capital Power owns more than 3,400 megawatts of power generation capa

  3. Slide 3: Port Dover and Nanticoke Wind Project

    Port Dover and Nanticoke Wind Project  Capital Power is developing a 104.4 MW (nameplate capacity) wind farm on privately-owned leased lands in the Counties of Haldimand and Norfolk.  Capital Power has been working on the Project since November 2009.  Capital Power executed a contract for the Pro

  4. Slide 4: Project Description

    Project Description  The Port Dover and Nanticoke Wind Project design will include:  58 Vestas wind turbines;  Collector and data lines connecting to overhead lines via underground wires that run along the turbine access roads (also referred to as ‘cabling’);  A substation in close proximity to

  5. Slide 5: Turbine Location Overview Map

    Legend (LIF Pee stay Area Proposed Project Components © Turbine Location TE sitstation Existing Features — Reed Network + Ratway Watercourse (1 watervody S224 yer 182 1525 | CAPITAL POWER L.P. PORT DOVER & NANTICOKE WIND PROJECT Turbine Location Overview Map Lake Erie BEST Capital <q bY BEST 50. Pow

  6. Slide 6: Project Timeline

    Project Timeline July 2013 or Q4 2013 Anticipated 6

  7. Slide 7: Questions?

    Questions? www.capitalpower.com/portdovernanticoke 519.761.3969 [email protected] 7

Capital Power — Corporate Update (November 2012) on 6ix