Slide 1: Port Dover and Nanticoke Wind Project Overview
Port Dover and Nanticoke Wind Project Project Overview November 21, 2012 6:30-8:30 p.m. Jarvis Community Centre
Slide 2: Capital Power
Capital Power Capital Power (CPX:TSX) is a growth-oriented North American power producer headquartered in Edmonton, Alberta. The company develops, acquires, operates and optimizes power generation from a variety of energy sources. Capital Power owns more than 3,400 megawatts of power generation capa
Slide 3: Port Dover and Nanticoke Wind Project
Port Dover and Nanticoke Wind Project Capital Power is developing a 104.4 MW (nameplate capacity) wind farm on privately-owned leased lands in the Counties of Haldimand and Norfolk. Capital Power has been working on the Project since November 2009. Capital Power executed a contract for the Pro
Slide 4: Project Description
Project Description The Port Dover and Nanticoke Wind Project design will include: 58 Vestas wind turbines; Collector and data lines connecting to overhead lines via underground wires that run along the turbine access roads (also referred to as ‘cabling’); A substation in close proximity to
Slide 5: Turbine Location Overview Map
Legend (LIF Pee stay Area Proposed Project Components © Turbine Location TE sitstation Existing Features — Reed Network + Ratway Watercourse (1 watervody S224 yer 182 1525 | CAPITAL POWER L.P. PORT DOVER & NANTICOKE WIND PROJECT Turbine Location Overview Map Lake Erie BEST Capital <q bY BEST 50. Pow
Slide 6: Project Timeline
Project Timeline July 2013 or Q4 2013 Anticipated 6
Slide 7: Questions?
Questions? www.capitalpower.com/portdovernanticoke 519.761.3969 [email protected] 7