Slide 1: Tata Power Investor Presentation April 2013
Presentation Title (Company The Tata Power Arial, Font sizeLtd. 28 ) Date, Venue, etc April ..( Arial, 2013 Font size 18 ) …Message Box ( Arial, Font size 18 Bold)
Slide 2: Disclaimer
Disclaimer •Certain statements made in this presentation may not be based on historical information or facts and may be “forward looking statements”, including those relating to The Tata Power Company Limited’s general business plans and strategy, its future outlook and growth prospects, and future
Slide 3: A Tata Group Company
A Tata Group Company Promoter Revenue by business segments Listed Companies Mkt Cap ($ bn)2 Shareholding (%)1 Tata Consultancy Services 51.9 73.9 Chemicals, 3 Services, 4 Tata Motors 17.6 34.7 Energy, 6 Tata Steel 5.5 31.3 Engineering , 39 Titan 4.5 53.1 Tata Power 4.2 32.5 IT & Comm, Revenue 16 Tat
Slide 4: Tata Power: Business Overview
Tata Power: Business Overview • Trombay • Hydro • Jojobera • Belgaum • Haldia • Wind Farms Power Generation • CGPL (Mundra UMPP) 100% Business • Maithon 74% • IEL 74% • Dagachhu 26% • OTP Geothermal 50% Transmission • Mumbai • Powerlinks 51% Distribution • Mumbai • Delhi: NDPL 51% Investments • Jams
Slide 5: Our Power Business
Our Power Business Power generation capacity (MW) Installed Thermal 7647 MW Hydro 447 MW Dugar Hydro Wind 398 MW Solar 28 MW Transmission Powerlinks NDPL Distribution DHPC Bhutan Under Execution IEL Thermal 202 MW Jojobera Hydro 126 MW Gujarat Jamshedpur Tubed Solar 10 MW Mundra Haldia Mithapur Mait
Slide 6: Existing Generation Assets and Growth Plans
Existing Generation Assets and Growth Plans Trombay 1580 Bhivpuri 75 Projects in advanced Projects under Bhira 300 stages of development scanning- 7000 MW* Mulshi 10 Khopoli 72 Tata Motors Belgaum 81 Thermal 8200 Rooftop 0.5 Renewables 1000 Wind 398 Dagacchu 126 Haldia 120 25000 MW Kalinganagar 202
Slide 7: Existing Generation Assets - Business Models
Existing Generation Assets - Business Models Capacity % of overall Model (MW) capacity Returns Upside Tata Power projects Off-take counterparty Mumbai Operations BEST, TPTCL, Tata Fixed return Savings on Norms + (Thermal & Hydro), Regulated returns 3425 40% Power Distribution, on equity PLF incentiv
Slide 8: Projects Under Execution
Projects Under Execution Capacity Project Fuel Fuel Supply Agreement (FSA) Power off-take COD (MW) •Domestic Coal; 100% linkage sanctioned •FSA with Bharat Coking Coal for Unit 1 & 2 Coal 1.659 MTPA PPAs have been commissioned; Railway Maithon 1,050 Linkage •Central Coalfields has signed FSA signed
Slide 9: Mundra UMPP (4000 MW)
Mundra UMPP (4000 MW) Capacity 4000 MW (5 X 800 MW) Customers Gujarat (1805 MW), Maharashtra (760 MW), Punjab (475 MW), Haryana (380 MW), Rajasthan (380 MW) Fuel Imported Coal – 10-12 MTPA Requirement & Offtake agreement with Indocoal for 10.11 ± 20% Source Looking for additional mines in
Slide 10: Maithon Power Limited (1050MW)
Maithon Power Limited (1050MW) Status Project commissioned Capacity 1050 MW (2 X 525 MW) DVC (300 MW), NDPL (300 MW), WBSEB (150 MW), 300 MW under negotiation Customers Long term (30 yr) PPAs commence on CoD for DVC & 1st April 2012 for NDPL and WBSEB Domestic Coal; 100% linkage sanctioned
Slide 11: Renewable Projects Under Execution
Renewable Projects Under Execution 2 x 63 MW run of the river Hydro project with Tata Power holding 26% and Royal Govt. of Bhutan holding 74% Project cost- ~USD 200 million with debt equity of 60: 40; debt tied up with ADB and others Dagacchu 126 MW PPA signed with Tata Power Trading Company L
Slide 12: Projects Under Development
Projects Under Development Project Fuel Source Capacity Status Execution schedule (MW) Coal based: Application MOU finalised, Environment Clearance for the for linkage submitted, Coal based – All 3 units by Kalinganagar 450 gas based plant obtained by Tata Steel along with Indonesian coal being FY16
Slide 13: Strategic Investment in Coal
Strategic Investment in Coal Operating 30% stake in Indonesian coal mines – KPC and Arutmin CY12 CY11 CY 10 CY 09 Performance Total estimated coal production to reach 100 mm tonnes by FY14 Quantity mined ~72 ~66 ~60 ~63 (MT) Overall rights adequately protected through the Shareholders’ Average S
Slide 14: Long term fuel contracts
Long term fuel contracts Project Fuel requirement Source of fuel Contract details Term PT Adaro: 1.00 MTPA (+/- 5yrs 0.25MTPA) c.3 MTPA of coal Purchase agreements PT Adaro: 1.00 MTPA (+/- 10yrs 0.2MTPA) Trombay Samtan: 0.65 MTPA (+/- 10%) Till FY14 From nearby refineries, Oil delivered by pipeline
Slide 15: Transmission and Distribution
Transmission and Distribution Transmission – Mumbai Powerlinks Transmissions Limited JV between Tata Power (51%) and Power Grid Corporation of TRANSMISSION Tata Power is amongst the 3 transmission licensees India Ltd. (49%) that bring power into Mumbai India’s first private sector inter-state
Slide 16: Other Businesses
Other Businesses 100% subsidiary TPTCL, holds a trading license for a period of 25 years starting from 2004 Tata Power Trading Holds a Category 1 trading license, the highest grade of license, which permits the company to trade any amount of power Trust Energy Resources Pte Ltd incorporated in
Slide 17: Appendix: Detailed Financial Statements
Appendix: Detailed Financial Statements …Message Box ( Arial, Font size 18 Bold)
Slide 18: Q3FY13 / YTD Q3FY13 Results - Standalone
Q3FY13 / YTD Q3FY13 Results - Standalone Quarter ended Nine months ended Year ended Particulars 31-Dec-12 30-Sep-12 31-Dec-11 31-Dec-12 31-Dec-11 31-Mar-12 (A) MUs MUs MUs MUs MUs MUs 1. Generation 3,873 4,272 3,970 12,404 11,631 15,230 2. Sales 3,998 4,235 3,922 12,460 11,647 15,240 (B) ` Crore ` C
Slide 19: Q3FY13 / YTD Q3FY13 Results – Consolidated
Q3FY13 / YTD Q3FY13 Results – Consolidated Quarter ended Nine months ended Year ended Particulars 31-Dec-12 30-Sep-12 31-Dec-11 31-Dec-12 31-Dec-11 31-Mar-12 (Unaudited) (Unaudited) (Audited) ` Crore ` Crore ` Crore ` Crore ` Crore ` Crore 1. Income from operations a) Revenue 8,320.87 7,398.66 6,281
Slide 20: Robust Financials (Standalone)
Robust Financials (Standalone) All figures in INR Revenues Profit After Tax billion 95 11.7 79 74 74 9.2 9.4 9.4 8.7 64 FY08 FY09 FY10 9M FY11 FY12 FY08 FY09 FY10 FY11 FY12 Networth Earnings per share 45.3 107.63 44 99.99 100.39 81.10 75.19 41 41 39 FY08 FY09 FY10 FY11 FY12 FY08 FY09 FY10 FY11 FY12
Slide 21: Robust Financials (Consolidated)
Robust Financials (Consolidated) All figures in INR Revenues EBITDA and EBITDA margin billion 300 60 25.00% 263 19.68% 23.14% 50 19.60% 250 50 46 17.56% 20.00% 196 199 18.86% 39 200 186 40 36 15.00% 150 121 30 21 10.00% 100 20 50 10 5.00% - 0 0.00% FY08 FY09 FY10 FY11 FY12 FY08 FY09 FY10 FY11 FY12 E
Slide 22: Robust Financials (Consolidated)
Robust Financials (Consolidated) All figures in INR Net Debt/Equity billion 500.0 Profit After Tax 2.6 21.4 21.8 450.0 1.7 400.0 350.0 13.0 1.4 11.8 300.0 1.5 316.2 250.0 1.1 Net Debt 225.6 200.0 Equity 161.4 150.0 129.7 FY08 FY09 FY10 FY11 FY12 85.5 100.0 114.0 131.0 118.7 50.0 76.5 86.2 -9.7 0.0 F
Slide 23: Standalone Financial Statements
Standalone Financial Statements INR mm FY08 FY09 FY10 FY11 FY12 INR mm FY08 FY09 FY10 FY11 FY12 Income Statement Balance Sheet Revenue Power supply and transmission 57,973 70,715 68,935 65,994 80,515 Net worth 75,192 81,099 99,9881,07,626 1,00,387 Contracts 737 1,217 1,461 1,747 3,562 Minority inter
Slide 24: Consolidated Financial Statements
Consolidated Financial Statements INR mm FY08 FY09 FY10 FY11 FY12 INR mm FY08 FY09 FY10 FY11 FY12 Income Statement Revenue Balance Sheet Net worth 76,530 86,189 114,004 131,036 118,665 Power supply and transmission 74,051 1,17,924 1,23,653 1,20,849 1,60,548 Electronics 2,567 2,415 2,926 2,050 3,379
Slide 25: Sustainability Initiatives
Sustainability Initiatives Care for environment Care for community Care for customers Care for people Growth through renewables, Principles of community Energy clubs Safety and health clean / green energy engagement Customer care centers Organizational Efficient technologies, Program