Enertopia Corp. · CSE:ENRT
Enertopia — Investor Presentation (January 2019)
22 slides from Enertopia's investor presentation, January 2019
Slide 1: Emerging Lithium Opportunity
OTCQB: ENRT CSE: TOP Emerging Lithium Opportunity January 2019 Update
Slide 2: Disclaimer
Disclaimer This presentation includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Statements which are not historical facts are forward-looking statements. The Company make
Slide 3: Project Location Nevada State Map
Project Location Nevada State Map Enertopia currently controls 100% of approximately 160 Acres of Placer and Lode Claims in Clayton Valley, Nevada Enertopia Lithium Project 3
Slide 4: Enertopia Project Location
Enertopia Project Location Near paved highways and power. High solubility Lithium source rocks at surface. Enertopia project outlined in black. 3rd party drilling by Cypress Development adjacent to our western boundary has resulted in a 43-101 Tech Report defining an indicated resource of 3,835,000
Slide 5: Enertopia Placer and Lode claim block shown in blue and gold
Enertopia Placer and Lode claim block shown in blue and gold Three of Cypress Development drill holes marked in red. DCH-9 and DCH -13 are closest to Enertopia’s western project border. Vertical trace of Hole DCH-14 and DCH-13 cross section shown on next page. HOLE From To Est Avg Meters Meters Thic
Slide 6: Cross Section Cypress DCH-14, DCH-13
Cross Section Cypress DCH-14, DCH-13 Trace of Hole DCH-14 and DCH-13 cross section looking NW. Dipping east to Enertopia claims. 6
Slide 7: Completed drill locations shown in Red dots
Completed drill locations shown in Red dots Completed Dec 2018 Drilling Program below: Four DDH holes TOP-01,02,03,04 were completed with TOP-04 ending in lower claystone. These holes will be used to calculate a project wide lithium resource over our 160 acres of placer and Lode claims. One Metallur
Slide 8: TOP-02 CORE Photo's
TOP-02 CORE Photo’s Photo of oxidized upper claystone Photo of reduced claystone Photo of black reduced claystone 8
Slide 9: TOP-04 CORE PHOTO's
TOP-04 CORE PHOTO’s Photo of oxidized upper claystone Photo of reduced claystone Photo of lower claystone 9
Slide 10: Strategic location for Project and Technology Advancement
Strategic location for Project and Technology Advancement ▪ Project is located on an uplifted block of lithium rich sediments confirmed by 3rd party surface sampling and drilling adjacent to the project with numbers averaging above 1,000 ppm Li at surface and in drill holes. ▪ Lithium values are hos
Slide 11: NEXT PROJECT STEPS FOR ENERTOPIA
NEXT PROJECT STEPS FOR ENERTOPIA PROJECT DEVELOPMENT: Assay’s pending for TOP-01-04 holes. Metallurgical testing of horizons by pH solution testing to begin by 2nd Qtr 2019. TECHNICAL DEVELOPMENT: Continued testing of high pH, low impurity brine solution using ion resins for removing impurities and
Slide 12: Lithium the driver of Battery Metals Demand For Our Clean Energy Mobile World
Lithium the driver of Battery Metals Demand For Our Clean Energy Mobile World Recent News Headlines ▪ Nov 2018, Volkswagen announces $50 billion dollar shift to be number one in Electric Vehicle sales with a target of 3 million electric vehicles sold per year by 2025. Source CNN business ▪ Dec 2018,
Slide 13: Modern Lithium demand part ONE cell phones
Modern Lithium demand part ONE cell phones now the number one way to access the internet 13
Slide 14: Modern Lithium demand part TWO Emergence of EV's
Modern Lithium demand part TWO Emergence of EV’s Source: EVvolumes.com 14
Slide 15: Modern Lithium demand part THREE accelerating EV Demand
Modern Lithium demand part THREE accelerating EV Demand Source: Canaccord Genuity Battery Metals Forecast Dec 2018 15
Slide 16: Modern Lithium demand part FOUR off grid storage
Modern Lithium demand part FOUR off grid storage 16
Slide 17: Li-Ion Battery cost down 80% since 2010 and falling
Li-Ion Battery cost down 80% since 2010 and falling Cost per $/kWh source Deloitte, Forbes.com 17
Slide 18: Number of World EV Charging Stations
Number of World EV Charging Stations This Number is estimated to grow to 40 million by 2030 Source Greentechmedia.com 18
Slide 19: ADVISORY CONSULTANTS
ADVISORY CONSULTANTS Dr. John Thomas — Technical Advisor Dr. Thomas is a professional engineer, and holds a B.Sc., an M.Sc., and a Ph.D. in chemical engineering from the University of Manchester in the United Kingdom. He also received a diploma in accounting and finance from the U.K. Association of
Slide 20: MANAGEMENT TEAM
MANAGEMENT TEAM President & CEO: Robert McAllister Mr. McAllister has served as President of Enertopia since November 2007 and as a Director since April 2008. Mr. McAllister was responsible for Investor Relations and Corporate Communications for publicly traded mining and oil & gas listed companies.
Slide 21: President's Message
President’s Message “We are happy to have completed our first drill program and are eagerly awaiting our assay results for the next phase of work to begin” Stated President Robert McAllister The Qualified Person: The technical data in this presentation have been reviewed by Douglas Wood, P.Geo., a Q
Slide 22: CONTACT INFORMATION
CONTACT INFORMATION Share structure President & CEO Robert McAllister Phone: 250-765-6412 Share Structure January 2018 Email: [email protected] Issued and Outstanding 121,964,931 Head Office Address: 156 Valleyview Rd. Warrants 39,219,989 Kelowna, BC V1X 3M4 Options 8,320,000 Fully Diluted 16