AGL Resources Inc

AGL Resources — Corporate Update (May 2010)

19 slides from AGL Resources's corporate update, May 10, 2010

  1. Slide 1: Pivotal Energy Development

    Pivotal Energy Development Dana Grams President

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements Certain expectations and projections regarding our future performance referenced in this presentation, in other reports or statements we file with the SEC or otherwise release to the public, and on our website, are forward-looking statements. Senior officers and other empl

  3. Slide 3: Nymex Monthly Continuation

    Nymex Monthly Continuation May 6, 2010 Nymex Forward Curve May 6, 2010 Nymex Monthly Volatility 1990-2010 April 5, 2010 Fundamentals of the Marketplace

  4. Slide 4: Proposed USGC LNG Terminals

    Proposed USGC LNG Terminals Natural Gas Storage Capacity Supply - Demand Balance U.S. Domestic Shale Production Extended Economic Slowdown Environmental Policy Domination Domestic Energy Policy Moderate Policies U.S. LNG Imports under Alternative Scenarios Extended Economic Slowdown Environmental Po

  5. Slide 5: Fundamentals of the Marketplace

    Fundamentals of the Marketplace • Market is cyclical • Supply basins are shifting – Canada and Gulf of Mexico in decline – Shale and tight sands increasing • Deliverability characteristics of new unconventional production are more challenging • Infrastructure need is real (pipeline, treating, proces

  6. Slide 6: Storage Additions Lag Behind Use

    Storage Additions Lag Behind Use

  7. Slide 7: Golden Triangle Program Overview

    Beaumont Disposal Line • Two caverns of 12 Bcf working gas capacity • Injection/Withdrawal - 300/600 MMcf/d • 14,205 Hp of compression • 6 pipeline interconnections – Kinder Morgan, Centana, Golden Pass, Houston Pipe Line, Texas Eastern, Florida Gas • 9 miles of twin 24-inch pipeline • In service -

  8. Slide 8: Golden Triangle Storage

    Golden Triangle Storage • Pipeline – 80% complete – Passed FERC inspection – Completing bores and directional drills • Meter Stations – 30% complete – June-August expected completion dates • Compressors – 65% complete – Expected in-service date of July 2010

  9. Slide 9: Golden Triangle Cavern Progress

    Three Dimensional Sonar Picture 1250 Ft Empire State Building Golden Triangle Cavern Progress Cavern 1 • Leaching continues at rates ~3,900 gpm • Cavern size estimated to be 8.0 MM barrels by August 1 st • Leaching scheduled to end June 1 st - conversion activities to commence • Sonar completed Febr

  10. Slide 10: Transition to Commercial Operations

    Fresh Water In Fresh Water In Cavern Creation • Always full of water as it grows Salt Surface Open Brine Out Cavern Creation • Always full of water as it grows Salt Surface Open Brine Out Cavern Creation • Always full of water as it grows • Conversion to commercial operations - gas displaces water S

  11. Slide 11: Golden Triangle Storage Schedule

    Today Project risk is significantly eliminated Golden Triangle Storage Schedule

  12. Slide 12: Golden Triangle Construction

    Compressors MCC Building Compressor Piping & Conduit Gas Coolers Golden Triangle Construction

  13. Slide 13: Golden Triangle Construction

    Pipeline Route-of-Way Cavern 2 Wellhead 24” Header Pipeline Golden Triangle Construction

  14. Slide 14: Jefferson Island Expansion

    : 10.0 MMDth : 7.5 MMDth : 2 : 360 MDth/Day : 600 MDth/Day : 9 : 15 miles dual 16” Existing Configuration : 37 MMDth : 17 - 28 MMDth : 4 : 660 MMcf per Day : 1,320 MMcf per Day : 12 : Additional Pipeline Maximum Expanded Configuration Jefferson Island Expansion • Total Capacity • Working Gas • Numbe

  15. Slide 15: Jefferson Island Timeline

    • Settled mineral lease dispute with State of Louisiana via operating agreement • Entered “Stage Gate One” of Asset Development Process • Expect to submit permit applications • Permits anticipated, prep for construction, detailed engineering • Expected start-up of operations, Cavern 3 • Cavern 1 exp

  16. Slide 16: Jefferson Island Program Overview

    Jefferson Island Program Overview Project A – Obtain permits for Cavern 3 & 4 – Complete raw water and disposal well facility – Upgrade leach plant – Solution mine Cavern 3 adding 6 Bcf working gas Project B – Expand Caverns 1 & 2, adding 3.5 Bcf of working gas capacity – Replace wellheads and leach

  17. Slide 17: Where We Are Going

    Where We Are Going • Proceeding with measured expansions • Geographic diversity • Increase optionality • Long-term portfolio value

  18. Slide 18: AGL Resources Advantages

    AGL Resources Advantages • Long-term player • Well-capitalized • Good locations • Speed to market • Low-cost expansion opportunities • Strong customer focus • Experienced management team / sustainable organization

  19. Slide 19: Opportunities Just Beginning

    Opportunities Just Beginning • Storage fundamentals remain strong – Natural gas market is growing – Significant barriers now exist to develop new storage • Uncertainty remains challenging – Credit markets - Commodity price – Inflation - Market participates – Interest rates - Renewable energy sources

AGL Resources — Corporate Update (May 2010) on 6ix