EDP Renewables SA · EURONEXT:EDPR

EDP Renewables SA — EDP Renováveis — Non-Deal Roadshow (November 2009)

52 slides from EDP Renewables SA's roadshow presentation, November 2009

  1. Slide 1: Roadshow Presentation

    Roadshow Presentation November, 2009

  2. Slide 2: Agenda

    Agenda I EDP Renováveis II Competitive Strengths III 9M09 Results IV Conclusions 1

  3. Slide 3: EDP Renováveis

    ° ‘)\ EDP Renovaveis SJ

  4. Slide 4: EDPR: a pure wind player with a sound asset base

    EDPR: a pure wind player with a sound asset base… USA Poland Belgium 2,530 - France 427 57 120 18,062 Romania 13 211 1,466 62 30 - Portugal 1,221 159 682 596 Spain Brazil 128 2,169 574 417 14 5,012 - 1,509 Gross MW – 9M09 Installed Under Pipeline + Capacity Construction Prospects MW Installed Capaci

  5. Slide 5: Well positioned to capture long-term profitable growth

    …and well positioned to capture long-term profitable growth EDPR Growth Targets (Gross GW) +3.6 10.5 GW Strong asset base delivering low risk cash-flows and attractive returns +1.3 5.6 GW Robust pipeline of 29 GW providing optionalities to value al e oriented gro growth th Value maximization through

  6. Slide 6: Competitive Strengths

    C Competitive titi Strengths St th

  7. Slide 7: EDPR: clear competitive strengths oriented to value creation

    EDPR: clear competitive strengths oriented to value creation Strong track record on growth delivery and visible pipeline to feed superior growth Pure player in a sector with regulatory support and improved business model for long-term Above market load factors to deliver premium assets and maximize

  8. Slide 8: Continuous delivery of strong capacity growth

    Continuous delivery of strong capacity growth Historic Capacity Growth 9M09 Capacity Increase (Gross MW) (Gross MW) +1,423 +798 5,577 5 052 5,052 +611 4,155 3,640 2,126 (1) 2006 2007 2008 9M08 EU US 9M09 • Consistently delivering a robust growth track record throughout last years of operation • On t

  9. Slide 9: 2009 target supported by favorable track record

    2009 target supported by a favorable track record on new installations and current capacity under construction 9M2009: YTD capacity additions profile 9M2009: Under construction (Gross MW) (Gross MW) 1.2-1.3 GW EU 866 US 427 515 525 276 3Q 183 2Q Total 1,293 66 1Q 9M08 9M09 4Q09E 2009 Target Confiden

  10. Slide 10: EU: 866 MW under construction in 6 European countries

    EU: 866 MW under construction in 6 European countries EU: 9M09 Capacity Under Construction (Gross MW) MW Installed Capacity MW Under Construction Spain Belgium g Poland oa d • Matured under construction works on 417 MW to be 57 - Spain commissioned in 2009 and 2010 13 120 2,169 417 Portugal • Progre

  11. Slide 11: US: successful construction activity in 2009

    US: successful construction activity in 2009 with 600 MW commissioned by the end of October: +227 MW vs. Sep. 09 US: 9M09 Capacity Under Construction (Gross MW) MW Installed Capacity Commissioned in Oct.09 MW Under Construction Iowa Lost Lakes 101 Minnesota Oregon 101 New York Illinois 301 334 Iowa

  12. Slide 12: Targeting 1.3-1.4 GW of capacity additions for 2010

    Targeting 1.3-1.4 GW of capacity additions for 2010 and keeping a strong growth pace to achieve 2012 goal… Annual Capacity Additions EDPR Growth Targets ((Gross GW)) ((Gross MW)) Installed 9M09 Under Construction 9M09 +3.6 10.5 GW Under Development 9M09 1.3 - 1.4 1.2 - 1.3 +1.3 5.6 GW 2009 guidance

  13. Slide 13: Robust and visible pipeline of projects

    …supported by a robust and visible pipeline of projects 9M09 Pipeline Pipeline and Growth Targets (Gross MW) (Gross GW) Tier 1 Tier 2 Tier 3 Prospects Total Spain 373 485 1,814 2,341 5,012 28.6 Portugal 351 14 9 200 574 France 55 58 356 753 1,221 Prospects 9.8 Belgium - - 37 25 62 Short-term pipelin

  14. Slide 14: EDPR: clear competitive strengths oriented to value creation

    EDPR: clear competitive strengths oriented to value creation Strong track record on growth delivery and visible pipeline to feed superior growth Pure player in a sector with regulatory support and improved business model for long-term Above market load factors to deliver premium assets and maximize

  15. Slide 15: EU: supportive regulation and well defined targets

    EU: supportive regulation and well defined targets European • Stable regulatory environment Union • The 20% 2020 target for renewables was reaffirmed • Well defined government targets for 2010 and 2016 Spain • Current remuneration framework is valid through 2012 • New targets for 2020 under discussi

  16. Slide 16: Spain: New plan announced in November

    Spain: New plan announced in November by the Spanish Government increases visibility for the wind sector Spain: Wind installed capacity targets Current economic regime RD 661/2007 (GW) 29.0 • Pool price + €31/MWh premium 23.6 Remuneration • €76/MWh floor and €91/MWh cap 20.2 16.0 • Jan 08 – Dec 12 i

  17. Slide 17: Eastern European countries: strong growth potential

    Eastern European countries: strong growth potential through solid defined targets and a stable regulation Poland: Renewable Energy Quotas • Remuneration: power price + green certificates 11.9% (€97/MWh@9M09) 10.4% 7.0% • Green certificates can be sold through PPAs or to the Polish Power Exchange Ach

  18. Slide 18: US: remuneration based on long-term PPA plus tax incentives

    US: Current remuneration is based on long-term PPA contracting plus federal tax incentives • The Renewable Portfolio Standard (RPS) enforced at state level creates a mandatory demand for renewables Brown Electricity Price • Utilities need to purchase renewable energy, being the long-term PPA for + 1

  19. Slide 19: US: Green mandatory demand main growth driver

    US: Green mandatory demand has been the main growth driver for the wind sector in the US WA: 15% by 2020 MI: 10% MWh and Renewable Energy Portfolio Standards (RPS) by State 1,100 MW by 2015 OR: 25% by 2025 OH: 12.5% by 2025 CA: 33% by 2020 WV: 25% by 2025 MT: 15% by 2015 KY: Report recommends NV: 25

  20. Slide 20: US: New Administration increasing regulatory support

    US: New Administration is increasing the regulatory support and short-term initiatives are already proving its success Approved and guidelines released Pending guidelines / legislation Short-Term Long-Term (American Recovery and Reinvestment Act)  Cash Grant program Energy Bill  Approved on the AR

  21. Slide 21: Brazil: strong long-term growth potential

    Brazil: strong growth potential for the long-term driven by a rich wind resource Brazil: Installed Capacity ((MW)) • Established in 2002 to foster renewable energy • 1,400 MW approved under the program to be ~140 GW PROINFA commissioned until Dec. 2010 Program • Remuneration: 20y PPA with federal po

  22. Slide 22: EDPR: clear competitive strengths oriented to value creation

    EDPR: clear competitive strengths oriented to value creation Strong track record on growth delivery and visible pipeline to feed superior growth Pure player in a sector with regulatory support and improved business model for long-term Above market load factors to deliver premium assets and maximize

  23. Slide 23: Delivering top-quality load factors

    Delivering top-quality load factors… 2008 QoQ Load Factors 9M09 Load Factors (%) (%) Avg. load factor for the year 9M08 9M09 US 40% 38% 34% 37% US 31% 31% EU 31% EU 24% 24% 26% 28% 24% 20% Total 28% 28% 20% 1Q 2Q 3Q 4Q • Strong load factors and above sector average on a quarterly and annual basis •

  24. Slide 24: Load factors achieving above market levels

    …which are continuously achieving above market levels, underlining the premium quality of EDPR’s assets Spain example: Quarterly load factors (%) Historical premium of 2-3p.p. in the load factor 9M09 EDP Renováveis - Spain (1) 40% 9M09 Spanish Market Historic avg. EDPR (02-08) (1) Historic avg. Span

  25. Slide 25: EDPR: clear competitive strengths oriented to value creation

    EDPR: clear competitive strengths oriented to value creation Strong track record on growth delivery and visible pipeline to feed superior growth Pure player in a sector with regulatory support and improved business model for long-term Above market load factors to deliver premium assets and maximize

  26. Slide 26: EDP Renováveis located in highly selective attractive markets

    EDP Renováveis is today located in highly selective attractive markets 9M09 Gross MW in Country operation (under constr.) Remuneration Scheme 9M09 Price/MWh Wind Resource 2,530 (427) PPA or Merchant +Tax Incentives $48(1) USA Feed-in tariff, or 2,169 (417) €86 market option with premium Spain 596 (1

  27. Slide 27: Balanced portfolio and hedging policy support revenue stability

    EDPR’s balanced portfolio and hedging policy continue to support revenue stability Production Breakdown Avg. Selling Price (%; GWh) (€/MWh or $/MWh) 9M09 9M08 % 7,295 GWh (1) + 15% Feed-in Stable feed-in tariffs €97 €95 +2% tariff Market + Premium 30% €86 €99 -13% 83% in Spain was hedged or + Hedgi

  28. Slide 28: Hedging decision in Spain driven by active risk management

    Hedging decision in Spain driven by active risk management practice in support of cash flow stability Total 9M09 production in Spain Pool price and EDPR hedging (%) (€/MWh) No market exposure or protected 70 EDPR fwd. price 2,156 GWh quarterly breakdown 18% 60 EDPR avg. avg fwd 50 price €47/MWh 40 8

  29. Slide 29: Resilient long-term PPA contracts in the US

    Resilient long-term PPA contracts in the US enhanced by a positive quarterly price evolution Total 9M09 production in the US Quarterly PPA price evolution in the 9M09 (1) (%) ($/MWh) No market exposure +13% 4,050 GWh 55 52 49 84% 16% 1Q09 2Q09 3Q09 Total PPA or long- Merchant term hedges • Improveme

  30. Slide 30: EDPR: clear competitive strengths oriented to value creation

    EDPR: clear competitive strengths oriented to value creation Strong track record on growth delivery and visible pipeline to feed superior growth Pure player in a sector with regulatory support and improved business model for long-term Above market load factors to deliver premium assets and maximize

  31. Slide 31: Already achieving capex savings and improving projects' NPV

    Already achieving capex savings and improving projects’ NPV Capex main inputs (%) Negotiation: Competitive process on the new projects Construction cost to start construction BoP 30-20% 30 20% driven by local market dynamics Action: Take advantage from the local dynamics in several markets and revis

  32. Slide 32: Balanced turbine supply with top manufacturers

    Balanced turbine supply with top manufactures at competitive prices EDPR current + contracted turbine portfolio Global Steel Price Index (%) (Carbon steel index: April 94=100) Other Gamesa 300 Latest EDPR 16% framework 15% agreement was 250 negotiated before the sharp increase in Acciona commodities

  33. Slide 33: EDPR: clear competitive strengths oriented to value creation

    EDPR: clear competitive strengths oriented to value creation Strong track record on growth delivery and visible pipeline to feed superior growth Pure player in a sector with regulatory support and improved business model for long-term Above market load factors to deliver premium assets and maximize

  34. Slide 34: Robust balance sheet and framework agreement with EDP

    Robust balance sheet and a solid framework agreement with EDP to face ongoing growth Enterprise Value Debt by Source Debt by Currency (%) (%) (%) 22% Financial Institutions 52% USD 67% Equity (1) 78% Shareholder Loans with EDP 4% Minorities (2) 9% TEI EUR 48% 21% Net Debt 9M09 9M09 9M09 • 4.7% of av

  35. Slide 35: US financing alternatives and tax credits monetization

    In the US, increased financing alternatives and tax credits monetization options… • Framework agreement g with the p parent company p y and lower costs Corporate Loans giving more certainty on growth execution • $750m of Credit Subsidy Cost approved: advantages for EDPR in Debt DOE Loan Guarantee te

  36. Slide 36: Optimising maximization of project's value creation

    …enables, under different scenarios, to optimise the maximization of the project’s value creation Illustrative NPV Low tax equity cost High tax equity cost • High capex • Low load factor Cash Flip Cash Grant PTC Tax Equity Cash Flip Cash Grant PTC Tax Equity • Low capex • High load factor C h Fli Ca

  37. Slide 37: Pioneer on Cash Grant Flip structures

    EDPR is the pioneer on Cash Grant Flip structures and is already improving the Cash Grant scenario New institutional partnership structures: Cash Grant vs Cash Grant Flip Cash Grant Flip (Investment Structure) For each $100m invested, ~$43m of tax capacity are needed just in the 1st year. New struct

  38. Slide 38: Low operational risk to the tax equity investor

    …and delivers low operational risk to the tax equity investor Tax Equity Liability: Cash Grant Flip vs PTC Tax Equity (illustrative example) 100% Cash Grant Flip PTC Tax Equity • c80% of the Tax Equity Liability is retired over the first year of investment: Cash Grant and Bonus Depreciation (50% of

  39. Slide 39: 600 MW in the US eligible for Cash Grant program

    By the end of October, EDPR already had 600 MW in the US eligible for the Cash Grant program EDPR: 2009 projects Expected Cash Grant Eligibility (MW) ($ million) Projects with COD Expected in 2009 Installed Cashed-in Includes Cash Grant Jun-09 198 150 Sep-09 Flip with MACRS monetization Installed Ex

  40. Slide 40: 9M09 Results

    9M09 Results R lt

  41. Slide 41: Gross Profit increased 23%

    EDPR’s Gross Profit increased 23% benefiting from a strong capacity growth and a low risk portfolio… Gross Profit: contribution by region Gross Profit: contribution by type (€ million) (€ million) +23% +78 496 +102 +18 496 -3 -26 +19 402 402 (1) (1)   Forex/ (2) 9M08 EU US Other 9M09 9M08 9M09 Vol

  42. Slide 42: Solid EBITDA growth and top tier EBITDA margin

    …resulting in a continuous solid EBITDA growth and a top tier EBITDA margin EBITDA: contribution by region EBITDA: YoY Growth (€ million) (€ million) +20% +20% +60 369 +19 1 -17 +19% 307 +23% 369 271 154 (1) (1) 9M08 EU US Other 9M09 1Q09 1H09 9M09 • On the back of a strong gross profit increase and

  43. Slide 43: 19% increase at Net Profit

    Solid financial growth from top-to-bottom resulting in a 19% increase at Net Profit Net Profit Evolution (€ million) +19% +62 +5 +15 +4 -72 70 59 (1) Net Profit EBITDA D&A Financial Taxes Minorities Net Profit 9M08 Costs 9M09 • Net profit continues to benefit from a robust EBITDA growth and strong q

  44. Slide 44: Capital expenditures amounted to €1,487m

    Capital expenditures in the period amounted to €1,487m… 9M09 Capital Expenditures QoQ Work in Progress (1) (€ million) (€ million, cumulative on Balance Sheet) Turbine deposits and MW under development MW under construction 689 US 1,648 422 1,487 543 Iberia 1,226 251 RoE 9M09 1Q09 2Q09 3Q09 • 54% in

  45. Slide 45: Increase in Net Debt

    …which mainly explains the increase in Net Debt Net Debt Evolution and Cash Flow (€ million) +€1,010m +1,447 +22 -147 1. 2nd instalment of Vento III ($50m) 1Q09 2. Cash Grant $48m 3Q09 3. Cash Grant Flip $102m 3Q09 2,079 -311 1,069 Net Debt YE08 Operating Cash Investing Institutional Forex Net Debt

  46. Slide 46: Conclusions

    ” ‘)\ Conclusions SJ

  47. Slide 47: A wind player with clear competitive strengths

    EDPR: a wind player with clear competitive strengths oriented to value creation Pure play renewable energy Robust obust ba balance a ce company with a sheet and solid sound asset base Strong track framework with record on growth EDP and targets delivery Pioneer on i innovative ti financing structure

  48. Slide 48: Annex

    Annex

  49. Slide 49: US: EDP Renováveis footprint

    US: EDP Renováveis footprint Gross MW Iowa 9M2009 Illinois In operation In operation Pioneer Prairie I 198 Mkt Twin Groves I 198 PPA Minnesota Indiana Pioneer Prairie II 102 PPA Twin Groves II 198 PPA In ope operation at o In operation Under Construction R il S Rail Splitter litt 101 Mkt Prairie Sta

  50. Slide 50: US: High quality short term pipeline – Tier I & II

    US: High quality short term pipeline – Tier I & II Tier 1 + Tier 2 per Region Tier 1 + 2 Pipeline Milestones (1) (MW as of September 09) (MW as of September 09) EDPR presence Total Tier 1 + 2 = 6,112 MW Upper Midwest Great Lakes 200 MW 1 550 MW 1,550 6,112 5,167 3,959 Northeast 770 MW Land Secured I

  51. Slide 51: Installed Capacity 9M09

    Installed Capacity 9M09 Wind Farms in 9M09 Installed Capacity Gross (100%) EBITDA MW Net (% Held) Spain 2,169 1,752 1,691 under Transitory Regime 1,474 1,101 1,086 under RD 661/2007 695 651 605 Portugal 596 553 576 under old remuneration 553 553 533 under new remuneration 43 - 43 France 211 211 211

  52. Slide 52: edp renovaveis

    edp renovaveis powered by nature

EDP Renováveis — Non-Deal Roadshow (November 2009) on 6ix