Tata Power Company Limited · NSE:TATAPOWER

Tata Power — The Tata Power Company — Investor Presentation (February 2010)

64 slides from Tata Power's investor presentation, February 2010

  1. Slide 1: The Tata Power Company Ltd Presentation February 2010

    Slide 1: The Tata Power Company Ltd Presentation February 2010

    Presentation Title The Tata Power Company Ltd February Presentation 2010 Subtitle 1

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer Certain statements made in this presentation may not be based on historical information or facts and may be “forward looking statements”, including those relating to The Tata Power Company Limited’s general business plans and strategy, its future outlook and growth prospects, and future d

  3. Slide 3: Agenda

    Slide 3: Agenda

    Agenda Part A: Overview of Tata Power Part B: Tata Power Generation Part C: Projects Part D: Other Power Businesses Part E: Other Businesses Part F: Financial Performance Part G: Sustainability 3

  4. Slide 4: Part A: Overview of Tata Power

    Slide 4: Part A: Overview of Tata Power

    Part A: Overview of Tata Power

  5. Slide 5: A Tata Company

    Slide 5: A Tata Company

    A Tata Company Business Sectors Revenue Largest Companies FY 2009 15% Rs 325,334 cr $ 71 bn 24% 45% 3% 6% 3% 4% Profits FY 2009 Rs 8,163cr 25% $ 1.8 bn -30% 59% 10% 16% 12% 8% 5

  6. Slide 6: Tata Power Group – Major Investments

    Slide 6: Tata Power Group – Major Investments

    Tata Power Group – Major Investments Tata Power Subsidiaries Joint Ventures Investments & Associates Coastal Gujarat Power 7% TTML 100% 30% KPC Ltd. (Mundra UMPP) Trust Energy Resources 8% TTSL 100% 30% Arutmin Pte. Ltd Indocoal 40% Panatone Maithon Power Ltd. 30% 74% Tubed Coal 17% Tata Comm.* Indu

  7. Slide 7: Businesses

    Slide 7: Businesses

    • Trombay 11,12,14 • Hydro 11,13 Businesses • Jojobera 16 • Belgaum 15 • Haldia 14 • Wind Farm 18 Generation • Mundra 21-25 Division • Maithon 26-28 Other Entities • IEL 17,29,30 • Dagachhu 31 Transmission • Mumbai 41 • Powerlinks 42 Power Business • Mumbai 38,39 Distribution • Delhi: NDPL 40 Tata P

  8. Slide 8: Part B: Tata Power Generation

    Slide 8: Part B: Tata Power Generation

    Part B: Tata Power Generation

  9. Slide 9: Generation: Business Models

    Slide 9: Generation: Business Models

    Generation: Business Models Returns Upside Value Drivers Our Projects Regulated Normative RoE Savings on Norms. Operational Mumbai License Area, PLF incentive Efficiency Maithon, Wind Captive Power PPA driven Merchant sales + Trading Jamshedpur (PH6), Plant Saving on agreed Capabilities + Jojobera t

  10. Slide 10: Existing Presence

    Slide 10: Existing Presence

    Existing Presence Mumbai 2027 MW Mumbai License Area Generation Powerlinks Thermal 1480 MW NDPL Hydro 447 MW Distribution Gujarat 50 MW Jojobera 428 MW Transmission Jamshedpur (IEL)120 MW Merchant Capacity Haldia 120 MW Mumbai Trombay 100 MW Maharashtra 95 MW Thermal 2329 MW Belgaum 81 MW Hydro 447

  11. Slide 11: Mumbai License Area (LA) - Generation

    Slide 11: Mumbai License Area (LA) - Generation

    Mumbai License Area (LA) - Generation Thermal Hydro Trombay - Thermal Unit Capacity Fuel Location Capacity Unit 4* 150 MW Oil & Gas Khopoli 72 MW Unit 5 500 MW Oil, Coal & Gas Bhivpuri 75 MW Unit 6 500 MW Oil & Gas Bhira 300 MW Unit 7 180 MW Gas Total 447 MW Unit 8 150 MW Coal Total 1480 MW • * Unit

  12. Slide 12: LA Generation Performance - Thermal

    Slide 12: LA Generation Performance - Thermal

    LA Generation Performance - Thermal Generation (MU) Availability (%) PLF (%) Aux. Consumption (%) “Greentech Safety Gold Award 2008” for Outstanding achievement in Safety Management for the 5th consecutive year in Apr 08 12

  13. Slide 13: LA Generation - Hydro

    Slide 13: LA Generation - Hydro

    LA Generation - Hydro Generation (MU)* Availability (%) *Decrease due to adherence to KWTA limits PLF (%) Aux. Consumption (%) Bhira PSU - CEA Silver Shield for 2nd best performing station in the country 13

  14. Slide 14: Merchant Capacity

    Slide 14: Merchant Capacity

    Merchant Capacity Haldia Trombay - Unit 8 Project Capacity 100 MW 100 MW Customers PPA with Tata Power Trading PPA with Tata Power Trading Hot flue gases from Hoogly Fuel Imported Coal Metcoke Note: Remaining 20 MW in Haldia under PPA to WBSEDCL Haldia Trombay Unit 8 14

  15. Slide 15: Belgaum

    Slide 15: Belgaum

    Belgaum Capacity • 81 MW Generation (MU) Fuel Type • Heavy Fuel Oil Customer • KPTCL • 12 year PPA till 2012 Business • Bid Driven – Case 2 Model • Fuel charge is pass through • Other charges recovered as fixed PLF (%) 19 27 33 63 cost 15

  16. Slide 16: Jojobera

    Slide 16: Jojobera

    Jojobera Capacity • 428 MW Generation (MU) • Unit 1: 67.5 MW, Unit 2-4: 120 MW each Fuel Type • Domestic Coal Customer • Tata Steel • 20 year PPA till 2017 Business • Captive Model • Fuel and Interest are a pass through • Other expenses on normative basis PLF (%) 77 73 76 80 1st Prize for Ash manage

  17. Slide 17: PH-6 (IEL)

    Slide 17: PH-6 (IEL)

    PH-6 (IEL) Capacity • 120 MW Ownership • IEL (74:26 JV of Tata Power and Tata Structure Steel Fuel Type • Coke Oven Gases of Tata Steel Customer • Tata Steel Business • Captive Model • Fuel and Interest are a pass through • Other expenses on normative basis 17

  18. Slide 18: Wind

    Slide 18: Wind

    Wind Capacity • 195 MW Generation (MU) Customer • Maharashtra: TPC-D 62 MW TPTCL 34 MW • Karnataka: BESCOM 50 MW • Gujarat: GUVNL 30 MW 3rd Party 20 MW Business • Mainly Regulated Model • Tariff based on State regulations PLF (%) 18 19 20 19 Tariff Annual (Rs / kwh) Escalation Maharashtra 3.50 Rs 0.

  19. Slide 19: Part C: Projects

    Slide 19: Part C: Projects

    TATA ry | Part C: Projects

  20. Slide 20: Generation Projects Under Implementation

    Slide 20: Generation Projects Under Implementation

    Generation Projects Under Implementation Captive Coal Blocks: 1. Jharkhand: Tubed Block,40% stake 2. Orissa: Mandakini Block, 33% stake Tubed Maithon1050 MW Mundra 4000 MW Jojobera 120 MW Mandakini Maharashtra 98 MW Thermal 5170 MW Wind 98 MW Other Projects: 1. Bhutan: Dagachhu Hydro Project, 26% st

  21. Slide 21: Mundra UMPP

    Slide 21: Mundra UMPP

    Capacity • 4000 MW (5 x 800 MW) Ownership Structure • 100% subsidiary; Coastal Gujarat Power Limited Business Model • Case 2 – Bid Driven Fuel Requirement • Imported Coal, 11-12 mtpa Fuel Source • Offtake agreement with KPC and Arutmin for 10.11 ± 20% • Looking for additional mines in Australia, Moz

  22. Slide 22: Mundra UMPP

    Slide 22: Mundra UMPP

    Current Status • Overall 42% work completed; 10,500 people on site Construction • Unit 1: TG erection has commenced Activities • Unit 2: TG deck has been cast • Unit 3, 4, 5: Progress on track • All packages have been issued to bidders and 92% of hard costs awarded • External coal handling system an

  23. Slide 23: Mundra – Site Photographs

    Slide 23: Mundra – Site Photographs

    Mundra – Site Photographs 23

  24. Slide 24: Mundra – Site Photographs

    Slide 24: Mundra – Site Photographs

    Mundra – Site Photographs Use of Heavy Equipment like this 1250 Ton Crane has accelerated project execution 24

  25. Slide 25: Mundra – Site Photographs

    Slide 25: Mundra – Site Photographs

    Mundra – Site Photographs FUEL OIL PIPE RACK FOUNDATIONS LP Rotor Manufacturing in Toshiba Shop 25

  26. Slide 26: Maithon

    Slide 26: Maithon

    Capacity • 1050 MW (2 x 525MW) Ownership Structure • 74: 26 JV of Tata Power and Damodar Valley Corporation Business Model • CERC Regulated Fuel Requirement • Domestic Coal Fuel Source • 100% linkage sanctioned. Active discussions on to sign Fuel Supply Agreements with coal mines Customers • DVC (30

  27. Slide 27: Maithon

    Slide 27: Maithon

    Current Status • Over 72% of work completed • Unit 1: Boiler drum lifting complete. Condenser erection started Construction Activity • Unit 2: Boiler drum lifting complete • EOT crane commissioned and boiler pressure part erection in progress for both units • 50% of coal source identified, efforts o

  28. Slide 28: Maithon – Site Photographs

    Slide 28: Maithon – Site Photographs

    Maithon – Site Photographs EOT Crane #1 commissioned at Power House #1 Power House #1 structural erection in progress 28

  29. Slide 29: IEL – Unit 5, Jojobera

    Slide 29: IEL – Unit 5, Jojobera

    IEL – Unit 5, Jojobera Project Capacity • 120 MW Ownership Structure • IEL Business Model • CPP Funding • Project Cost: Rs 620 Crores • D/E 70:30 Completion • Q4 FY10 Construction • Over 90% completed Activity • Boiler light up completed in December ’09 • Synchronization targeted in FY 10 Project De

  30. Slide 30: Jojobera (Unit 5)

    Slide 30: Jojobera (Unit 5)

    Jojobera (Unit 5) CW Pump Motors Erected Mill and Bunker Erection in Progress 30

  31. Slide 31: Hydro Projects

    Slide 31: Hydro Projects

    Hydro Projects  Exclusive partnership agreement with SN Power, Norway to develop joint hydropower projects in India and Nepal JV with SN Power  Aim to have 2000 MW under construction or in operation by 2015  Establish jointly owned Services Company to provide technical and managerial expertise 

  32. Slide 32: National Solar Mission

    Slide 32: National Solar Mission

    National Solar Mission TARGET Grid-parity for solar power by 2022, and coal-based parity by 2030 ROADMAP Installed Capacity Phase I Phase II Phase III (in MW) 2009 - 2013 2013 - 2017 2017 - 2022 Grid-connected 1000 - 2000 4000 – 10,000 20,000 Off-grid 200 1000 2000 POLICY INCENTIVES - HIGHLIGHTS • S

  33. Slide 33: Solar Generation: Key CERC Guidelines

    Slide 33: Solar Generation: Key CERC Guidelines

    Solar Generation: Key CERC Guidelines Eligibility: Technologies approved by the MNRE Tariff period: 25 years for Solar PV and Solar Thermal Projects (also its ‘useful life’) Capital Cost: Rs 17 Cr/MW for Solar PV and Rs 13 Cr/MW for Solar Thermal projects Actual capital cost can be used for the dete

  34. Slide 34: Captive Coal Blocks

    Slide 34: Captive Coal Blocks

    Captive Coal Blocks Mandakini Coal Block • 7.5 MTPA (jointly allotted with Jindal Photo Film and Monnet Ispat & Energy - each JV Partner having a share of 2.5 MTPA) at Dist. Angul, Orissa • Mining plan approved by MoC • Proposal for land acquisition submitted; Public hearing completed successfully •

  35. Slide 35: Other Projects in Pipeline

    Slide 35: Other Projects in Pipeline

    Other Projects in Pipeline Generation Project Fuel Source Capacity (MW) Tubed IPP Captive Coal - Tubed 500 Naraj Marthapur IPP Captive Coal - Mandakini 1000 Corus (Tata Steel) Production Gases (Corus) 525 Coastal Maharashtra (Dehrand) Imported Coal 2400 Jharkhand CPP (Tata Steel) Supply by Tata Stee

  36. Slide 36: Generation Capacity (Tata Power Group)

    Slide 36: Generation Capacity (Tata Power Group)

    Generation Capacity (Tata Power Group) Excludes Projects Under Planning 10000 8242 Added in the Year 2400 8000 Total Capacity at Year End 5842 6000 1600 Capacity 4242 1138 4000 3104 2786 318 421 2000 Unit 8 250 PH6 120 2365 Wind 81 Wind 36 New Units Commissioned Haldia 90 Haldia 30 0 2008 2009 2010

  37. Slide 37: Part D: Other Power Businesses

    Slide 37: Part D: Other Power Businesses

    Part D: Other Power Businesses

  38. Slide 38: Mumbai LA - Distribution

    Slide 38: Mumbai LA - Distribution

    Mumbai LA - Distribution • “… Tata Power Company Ltd. is entitled to effect supply of electrical energy in retail directly to consumers …” - Hon’ble SC • “ … use of the distribution network of another distribution licensee, need to be explored by TPC-D, so that the (network rollout) cost is optimise

  39. Slide 39: Distribution Customer Profile – Mumbai LA

    Slide 39: Distribution Customer Profile – Mumbai LA

    Distribution Customer Profile – Mumbai LA Sales (MUs) Residential Commercial 4% 21% Essential 40% Industrial 35% 39

  40. Slide 40: North Delhi Power Limited (NDPL)

    Slide 40: North Delhi Power Limited (NDPL)

    North Delhi Power Limited (NDPL) PAT Rs. crore Customer Base • >1 million customers with 5000 MUs of consumption Business Model • Regulated Revenue (FY09) • Rs 2479 Cr Regulated • Rs 685 Cr Equity Incentives* 55 72 53 79 * Reset of Target AT&C losses after FY07 for next 5 years ROE % • 16% on capita

  41. Slide 41: Mumbai LA - Transmission

    Slide 41: Mumbai LA - Transmission

    Mumbai LA - Transmission • Around 1100 ckm network comprising of 973 ckm of 220 kV / 110 kV overhead lines and 124 ckm of 220 kV / 110 kV underground cables. • Two Extra High Voltage (EHV) lines capacity augmented (170 MVA to 350 MVA) by replacement of the conductor with new technology “High Ampacit

  42. Slide 42: Powerlinks Transmission Limited

    Slide 42: Powerlinks Transmission Limited

    Powerlinks Transmission Limited Capacity • 1200 km 400 kV double-circuit PAT Rs. crore transmission lines Business Model • Regulated Revenue (FY09) • Rs 255 Cr Regulated Equity • Rs 463 Cr ROE % • 14% (15.5% w.e.f 1st April, 2009) Incentive • As a percent of equity on availability Structure above Ta

  43. Slide 43: Indonesian Coal Mines – Structure of Investment

    Slide 43: Indonesian Coal Mines – Structure of Investment

    Indonesian Coal Mines – Structure of Investment Tata Power Company Ltd. (India) Bhivpuri Bhira Investments Ltd. Investments Ltd. (Cyprus) (Mauritius) Indocoal KPC Arutmin (Cayman Islands) (Indonesia) (Indonesia) Bumi Resources (Indonesia) 43

  44. Slide 44: Indonesian Coal Mines

    Slide 44: Indonesian Coal Mines

    Indonesian Coal Mines Organizational Structure Offtake Agreement • 40% representation on the Board of • 10.1+ 20% MT on a take or pay basis Commissioners and the Board of Directors • Indocoal Resources (Cayman) agrees to with affirmative rights trade outside of India any coal that Tata • CFOs at KPC

  45. Slide 45: Indonesian Coal Mines

    Slide 45: Indonesian Coal Mines

    Indonesian Coal Mines Operating Performance Jan-Jun ‘09 Jan-Dec ‘08 • Quantity mined (MT) ~27 ~53 • Average Selling Price (FOB USD/ton) ~66 ~73 • EBITDA from Operations (USD mn) 422 1131 Source – Bumi Resources Debt Repayment Schedule (as of Sep 09) Loan Loan Amount Interest Maturity Repayment Detai

  46. Slide 46: Shipping Subsidiaries

    Slide 46: Shipping Subsidiaries

    Shipping Subsidiaries • Trust Energy Resources Pte Ltd incorporated in Singapore for owning ships to meet shipping requirements and trading in fuels, Energy Eastern Pte Ltd incorporated for chartering of ships • Present shipping requirements of 8 vessels for Mundra • To be met through a combination

  47. Slide 47: Tata Power Trading Company Limited

    Slide 47: Tata Power Trading Company Limited

    Tata Power Trading Company Limited TPTCL Sales (MU) 4000 TPTCL is currently the third largest trading company with 9.26% market share 3000 2000 1000 FY09 Revenue – Rs 2167.3 Cr 0 PAT – Rs 7.6 Cr FY05 FY06 FY07 FY08 FY09 Dividend – 20% (PY: 20%) Rs. Cr Revenues Operating PBT PAT % Profit change in PA

  48. Slide 48: Part E: Other Businesses

    Slide 48: Part E: Other Businesses

    Id TATA Part E: Other Businesses Lighting up Lives! ye *

  49. Slide 49: Strategic Electronics Division (SED)

    Slide 49: Strategic Electronics Division (SED)

    Strategic Electronics Division (SED) • Revenues of Rs.101 crores (Mar 09) against Rs.55 crores during the previous year. • First batch of Pinaka Launchers was successfully subjected to Factory Acceptance Tests (FAT) by the Ministry of Defence • SED completed the delivery of Air Defence Systems based

  50. Slide 50: Tata BP Solar

    Slide 50: Tata BP Solar

    Tata BP Solar • 51:49 JV between BP Solar and Tata Power • Market leader in Solar Photovoltaic technology in India with a turnover of Rs 1147 crores in FY09 • The turnover of the Co. in India and SAARC region is about Rs. 270 crores. With exports to BP Solar accounting for about Rs. 877 Crores • Nea

  51. Slide 51: Part F: Financial Performance

    Slide 51: Part F: Financial Performance

    Part F: Financial Performance

  52. Slide 52: Standalone – Half Year Ended Sep. 30, 2009

    Slide 52: Standalone – Half Year Ended Sep. 30, 2009

    Standalone – Half Year Ended Sep. 30, 2009 FY09 Rupee in Billions H1 FY10 H1 FY09 72.36 Operating Income 37.37 39.85 (61.17) Operating Expenditure (26.88) (34.05) 11.19 Operating Profit 10.49 5.80 (3.06) Interest & Finance Charges (2.19) (0.15) (3.29) Depreciation (2.30) (1.49) 4.88 Other Income 1.5

  53. Slide 53: Consolidated – Half Year Ended Sep. 30, 2009

    Slide 53: Consolidated – Half Year Ended Sep. 30, 2009

    Consolidated – Half Year Ended Sep. 30, 2009 FY09 Rupee in Billions H1 FY10 H1 FY09 175.88 Operating Income 92.92 87.07 (143.22) Operating Expenditure (71.37) (71.42) 32.66 Operating Profit 21.55 15.65 (7.09) Interest & Finance Charges (3.93) (3.17) (6.57) Depreciation (4.25) (3.31) 3.99 Other Incom

  54. Slide 54: Funding Requirement

    Slide 54: Funding Requirement

    Funding Requirement Own Funds Debt (Rs.5,500 Crores) (Rs.18,100 Crores) • Internal accruals: Rs.2800 Crores • Domestic loans through domestic • GDR proceeds: Rs. 1600 Crores financial institutions, banks and • FCCB proceeds: $ 300 mn capital markets (equivalent to Rs. 1400 Crores) • Foreign loans th

  55. Slide 55: Tata Power – Financials (Standalone)

    Slide 55: Tata Power – Financials (Standalone)

    Tata Power – Financials (Standalone) Annual Sales (MU) Profit After Tax (In Billion Rs.) EPS (in Rs.) Net Worth (In Billion Rs.) 55

  56. Slide 56: Tata Power – Financials (Consolidated)

    Slide 56: Tata Power – Financials (Consolidated)

    Tata Power – Financials (Consolidated) Profit After Tax (In Billion Rs.) EPS (in Rs.) Net Worth (In Billion Rs.) 56

  57. Slide 57: Dividend History

    Slide 57: Dividend History

    Dividend History 50 50 Dividend (Rs) 45 EPS (Rs) 45 40 Payout Ratio (%) 40 35 35 30 30 Rs 25 25 % 20 20 15 15 10 10 5 5 0 0 FY05 FY06 FY07 FY08 FY09 57

  58. Slide 58: Part G: Sustainability

    Slide 58: Part G: Sustainability

    Id TATA Part G: Sustainability Lighting up Lives! aye

  59. Slide 59: Our Sustainability Initiatives

    Slide 59: Our Sustainability Initiatives

    Our Sustainability Initiatives • Trombay SO2 emission of 24TPD (1330MW) - one of the most stringent • Forum of 46 global companies: New policy framework on Combating Climate Change (3C) • Carbon Footprint calculation for the Company completed • Sustainability Council formed - 17 CDM Projects Identif

  60. Slide 60: Thrust on Renewables

    Slide 60: Thrust on Renewables

    Thrust on Renewables • Wind: Exploring newer technologies and development options • Solar: National Solar Mission Opportunity • Geothermal: Opportunities in Australia, Indonesia and India • Hydro Power: Identification and development of hydro projects • 26% stake in Dagachhu Hydro Project in Bhutan

  61. Slide 61: Various Technologies being Explored

    Slide 61: Various Technologies being Explored

    Various Technologies being Explored • Solar Concentrated Thermal (SCT) • Geo Thermal energy • Coal beneficiation technologies 61

  62. Slide 62: Demand Side Management and Energy Conservation

    Slide 62: Demand Side Management and Energy Conservation

    Demand Side Management and Energy Conservation • Tata Power Energy Club formed for curbing energy wastage through school children. The Club has sensitised over 50,000 students across India who have sensitised over 75,000 people in their community • Energy conservation awareness campaigns for Custome

  63. Slide 63: Our initiatives on DSM and Energy Conservation

    Slide 63: Our initiatives on DSM and Energy Conservation

    Our initiatives on DSM and Energy Conservation 63

  64. Slide 64: Thank you

    Slide 64: Thank you

    kd TATA Thank you We take pride in Lighting up Lives! Lighting up Lives! TATA POWER :; 3K

Source: Internet Archive copy of tatapower.com

More decks from Tata Power Company Limited

All 137 Tata Power decks