PT Alamtri Minerals Indonesia Tbk · IDX:ADMR

PT Alamtri Minerals Indonesia Tbk — PT Adaro Minerals Indonesia — Investor Presentation (February 2024)

26 slides from PT Alamtri Minerals Indonesia Tbk's investor presentation, Feb 28, 2024

  1. Slide 1: PT Adaro Minerals Indonesia Tbk Public Expose

    Slide 1: PT Adaro Minerals Indonesia Tbk Public Expose

    PT Adaro Minerals Indonesia Tbk Public Expose Wednesday, 28 February 2024

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer These materials have been prepared by PT Adaro Minerals Indonesia Tbk (the “Company”) and have not been independently verified. No representation or warranty, expressed or implied, is made and no reliance should be placed on the accuracy, fairness or completeness of the information presen

  3. Slide 3: Business Overview

    Slide 3: Business Overview

    adaro®) MINERALS 7 Business Overview

  4. Slide 4: PT Adaro Minerals Indonesia Tbk at a Glance

    Slide 4: PT Adaro Minerals Indonesia Tbk at a Glance

    PT Adaro Minerals Indonesia Tbk at a Glance Indonesia's top metallurgical coal producer, with an industry-leading cost structure and growing client base. Currently developing an Aluminium Smelter at the industrial park in North Kalimantan, as our first step in supporting the Government’s downstream

  5. Slide 5: Company Overview

    Slide 5: Company Overview

    Company Overview CCoWs Locations Resources and Reserves Total Coal Total Coal Compliance Company / Locality Reserves Resources Standard (Mt) (Mt) Lahai Coal - Haju 2.3 4.3 JORC (Metallurgical) Maruwai Coal - Lampunut 84.3 100.3 JORC (Metallurgical ) Juloi Coal - Juloi Northwest - 629.9 JORC (Metallu

  6. Slide 6: Established Infrastructure to Ensure Operational Excellence

    Slide 6: Established Infrastructure to Ensure Operational Excellence

    Established Infrastructure to Ensure Operational Excellence Lampunut Coal Handling and Processing Plant Crushing Plant : 600 tph One of the largest CHPPs in Indonesia in terms of capacity Reduces ash from 12% ad to 4.5% ad Washing Plant : 525 tph (max: 550 tph) WASHING – 3 Process Circuit 6

  7. Slide 7: Our ongoing Investment in Facilities and Infrastructure

    Slide 7: Our ongoing Investment in Facilities and Infrastructure

    Our ongoing Investment in Facilities and Infrastructure Hauling road progress Barge loading conveyor area Employee dorms’ construction Washing Plant : 525 tph (max: 550 tph) Our projects in Maruwai Coal (MC) and Lahai Coal (LC) continue the ongoing investment in facilities and infrastructure through

  8. Slide 8: Supply Chain: from Coal Terminal to Vessel Loading Points

    Slide 8: Supply Chain: from Coal Terminal to Vessel Loading Points

    Supply Chain: from Coal Terminal to Vessel Loading Points Barge-to-barge Barge-to-Barge ▪ Barge-to-Barge transfers are done at Tuhup Port Taboneo and North Kelanis using FC A Hasan Basri Barge-to-Vessel B Tumpung Laung Barge-to-Vessel (Taboneo) C Kalahein Bridge ▪ Safe for loading for a wide range o

  9. Slide 9: The Value of the Green Economy

    Slide 9: The Value of the Green Economy

    The Value of the Green Economy Substantial investment opportunities in Indonesia Value at stake Growing demand for Green economy Green minerals $3T Investment in renewable energy by 2030 $800B Global EV sector by 2030 9

  10. Slide 10: The Green Economy

    Slide 10: The Green Economy

    The Green Economy Driving demand for green minerals Electric vehicle Wind technology Solar technology 13 28 3 26 13 14 13 AI Ni Li Fe AI Si AI Aluminium Nickel Lithium Iron Aluminium Silicon Aluminium More Aluminium used in electric Metallurgical coal needed to produce 30% vehicles than internal com

  11. Slide 11: Developing Our Green Minerals Business

    Slide 11: Developing Our Green Minerals Business

    Developing Our Green Minerals Business Increasing revenue contribution from minerals used within the EV and battery supply chains Supporting the Government’s downstream initiatives in green industry and the processing of minerals Our first step is via our Aluminium smelting project, with gradual dev

  12. Slide 12: Aluminum Smelter in Kalimantan Industrial Park Indonesia

    Slide 12: Aluminum Smelter in Kalimantan Industrial Park Indonesia

    Aluminum Smelter in Kalimantan Industrial Park Indonesia Scope of project is 1.5 Mtpa of Aluminum production Additional capacity of up to 500,000 tpa of Green Aluminum. Adaro plans for this Additional production to be powered by hydro. capacity of up to 500,000 tpa aluminum. Adaro may invest in the

  13. Slide 13: Progress at the Aluminium Smelter

    Slide 13: Progress at the Aluminium Smelter

    Progress at the Aluminium Smelter • Smelter: KAI has completed the soil investigation, land levelling, and piling work for the baking furnace facilities. In 1Q24, KAI will focus on piling and foundation activities in the smelter area. • Jetty: continue the piling work for facilities dedicated to rec

  14. Slide 14: Solid Performance in HSE

    Slide 14: Solid Performance in HSE

    Solid Performance in HSE • ADMR implements the Adaro Group’s Adaro Zero Accident Mindset (AZAM) which emphasizes on continuous improvements in safety SOPs to improve workers’ behavior. PT KAI continues its construction progress while consistently emphasizing health and safety governance for each ope

  15. Slide 15: CSR and Green Initiatives

    Slide 15: CSR and Green Initiatives

    CSR and Green Initiatives • ADMR applies Adaro Group’s “Adaro Ignites Change” CSR initiatives and Adaro Group’s initiatives in ESG. • To improve ESG performance, and as the first step towards energy efficiency, ADMR and Adaro Power are actively in the pre- feasibility study phase of installing a min

  16. Slide 16: Industry Overview

    Slide 16: Industry Overview

    Industry Overview

  17. Slide 17: Strong Market Fundamentals continue to support pricing

    Slide 17: Strong Market Fundamentals continue to support pricing

    Strong Market Fundamentals continue to support pricing Price Trends 800 • The 2023 Premium low-volatile (PLV) hard coking 700 coal (HCC) FOB Australia price declined by 19%. 600 Despite the decline, metallurgical coal prices remain well supported, reaching nearly 500 US$300/mt on average. Shortage o

  18. Slide 18: Metallurgical Coal Seaborne Demand and Supply Outlook

    Slide 18: Metallurgical Coal Seaborne Demand and Supply Outlook

    Metallurgical Coal Seaborne Demand and Supply Outlook Demand Forecast Supply Forecast 350.0 350.0 300.0 300.0 250.0 250.0 Million Tonnes 200.0 200.0 150.0 150.0 100.0 100.0 50.0 50.0 0.0 0.0 2022 2023 2024 2025 2026 2027 2028 2029 2030 2022 2023 2024 2025 2026 2027 2028 2029 2030 China India Japan S

  19. Slide 19: Operational & Financial Highlight

    Slide 19: Operational & Financial Highlight

    Operational & Financial Highlight

  20. Slide 20: Strong Production & Sales

    Slide 20: Strong Production & Sales

    Strong Production & Sales Growing Production with Low Strip Ratio Expanding Sales Volume (Mt) 25.0 4.0 4.5 3.7 +39% 3.5 3.2 20.0 18.7 2.3 3.0 1.4 2.5 15.0 2.2 2.2 2.5 2.0 2020 2021 2022 2023 10.0 8.3 1.5 Broad Market Demand (FY23) 5.2 5.1 1.0 5.0 4.2 3.4 1.9 2.3 0.5 Korea Indonesia 6% 0.0 0.0 13% Ja

  21. Slide 21: Profitability levels maintained

    Slide 21: Profitability levels maintained

    Profitability levels maintained Improving Revenue and EBITDA Stable Margins 1,086 40.6% 2023 908 53.7% 37.0% 2022 574 58.9% 460 490 34.1% 2021 248 52.3% 123 -23.2% 4 2020 -9.1% 2020 2021 2022 2023 Revenue (in $ million) EBITDA (in $ million) Net profit margin Gross profit margin 21

  22. Slide 22: Financial Summary

    Slide 22: Financial Summary

    Financial Summary OPERATIONAL PERFORMANCE FY23 FY22 % Change Production (Mt) 5.1 3.4 52% OB removal (Mbcm) 18.7 8.3 125% Sales (Mt) 4.5 3.2 39% FINANCIAL PERFORMANCE FY23 FY22 % Change (in US$ million, except Earning per share) Net revenue 1,086.0 908.1 20% Gross profit 583.2 534.9 9% Net profit 440

  23. Slide 23: Key Metrics

    Slide 23: Key Metrics

    Key Metrics FINANCIAL RATIO FY23 FY22 % Change Gross profit margin 53.7% 58.9% (5%) Net profit margin 40.6% 37.0% 4% Operating margin 52.9% 50.5% 2% Operational EBITDA margin 52.8% 54.0% (1%) Net debt (cash) to equity (x) (0.16) (0.04) 299% Net debt (cash) to last 12 months Operational EBITDA (x) (0

  24. Slide 24: FY24 Projections

    Slide 24: FY24 Projections

    FY24 Projections Sales Volume (in Mt) Strip Ratio Capital Expenditure (in $ million) 3.7 3.6 175 - 250 4.9 - 5.4 4.5 2.5 2.2 2.2 134 3.2 2.3 1.4 44 21 11 2020A 2021A 2022A 2023A 2024F 2020A 2021A 2022A 2023A 2024F 2020A 2021A 2022A 2023A 2024F 24

  25. Slide 25: Conclusions and Takeaways

    Slide 25: Conclusions and Takeaways

    Conclusions and Takeaways • ADMR’s competitive strengths include: (i) a large coal reserve and resource, (ii) premium product quality, (iii) a growing client base amongst blue-chip steel companies, and (iv) industry-leading cost structure. • Production volume in FY23 reached 5.1 million tonnes, up 5

  26. Slide 26: Thank you

    Slide 26: Thank you

    adaro®) MINERALS Thank you