Avista Corporation · NYSE:AVA
Avista — Technical Presentation (April 2024)
26 slides from Avista's technical presentation, Apr 23, 2024
Slide 1: 2025 Electric Integrated Resource Plan
2025 Electric Integrated Resource Plan Technical Advisory Committee Meeting No. 5 Agenda Tuesday, April 23, 2024 Virtual Meeting – 8:30 am to 10:00 am PTZ Topic Staff Introductions John Lyons Long Run Load Forecast AEG Load Forecast Comparison Avista Staff Review Planned Scenario Analysis James Gall
Slide 2: 2025 IRP TAC 5 Introductions
2025 IRP TAC 5 Introductions John Lyons, Ph.D. Technical Advisory Committee Meeting No. 5 April 23, 2024
Slide 3: Today's Agenda
Today’s Agenda Introductions, John Lyons Long Run Load Forecast, AEG Load Forecast Comparison, Avista Staff Review Planned Scenario Analysis, James Gall 2
Slide 4: Remaining 2025 Electric IRP TAC Schedule
Remaining 2025 Electric IRP TAC Schedule • TAC 6: May 7, 2024: 8:30 to 10:00 (PTZ) o Conservation Potential Assessment (AEG) o Demand Response Potential Assessment (AEG) • TAC 7: May 21, 2024: 8:30 to 10:00 (PTZ) o Variable Energy Resource Study o Portfolio/Market Scenarios • TAC 8: June 4, 2024: 8:
Slide 5: Remaining 2025 Electric IRP TAC Schedule
Remaining 2025 Electric IRP TAC Schedule • TAC 10: July 16, 2024: 8:30 to 10:00 (PTZ) o Preferred Resource Strategy Results o Washington Customer Benefit Indicator Impacts o Resiliency Metrics • TAC 11: July 30, 2024: 8:30 to 10:00 (PTZ) o Preferred Resource Strategy Results o Portfolio Scenario Ana
Slide 6: Avista Energy Electric Forecasting
Avista Energy Electric Forecasting Prepared for Avista Energy TAC Meeting 4/23/2024 Confidentiality – The information contained in this presentation is proprietary and confidential. Use of this information is limited to the intended recipient and its employees and may not be disclosed to third parti
Slide 7: Background
Background AEG has worked with Avista for multiple Conservation Potential Assessments going back to 2010 As part of the CPA, AEG creates a baseline projection at the segments and end use level, which provides granular insight on peak impacts and changes in individual technology classes Now Avista is
Slide 8: Major Modeling Inputs and Sources
Major Modeling Inputs and Sources Avista foundational data Survey data showing Technical data on end- State and Federal Market trends and presence of equipment use equipment costs energy codes and effects and energy standards consumption Avista power sales by schedule Avista: Residential customer Re
Slide 9: Forecast Process
Forecast Process Market Characterization Run Baseline Projection Create Hourly Forecast • Segmentation (Annual) • Assign end use load shapes • End Use and Technology List • Customer Forecast • Aggregate energy by shape • Allocate electric loads & calibrate • Stock Turnover • Apply hourly shape throu
Slide 10: Existing vs New Buildings
Existing vs New Buildings • Modeling tracks existing building stock separately from new code-compliant buildings • Buildings also undergo renovation at a rate consistent with the DOE’s National Energy Modeling System, converting them into code-compliant structures • Presence of equipment in new buil
Slide 11: System Total Load Forecast
System Total Load Forecast Washington + Idaho Combined • Customer growth and electrification from 14,000 natural gas systems combine for a projected 53% increase in electric loads over the 12,000 forecast period, or 1.6% annually 10,000 • Growth from electrification is roughly equal to growth from c
Slide 12: Washington Sector-Level Forecasts
Washington Sector-Level Forecasts • WA Residential is the fastest growing sector, at 1.97% per year, driven by space heating and EV growth • Commercial EV charging also adds over 1,000 GWh per year by 2045 • Industrial loads have continued to trend downward and no new load increases are anticipated
Slide 13: Idaho Sector-Level Forecasts
Idaho Sector-Level Forecasts • ID load growth is not as fast as WA, mainly due to lower electrification and much less EV. • ID is projected to see greater increase in customers than WA however, so there is still significant growth in both the Residential and Commercial sectors Applied Energy Group,
Slide 14: Peak Forecasts
Peak Forecasts • Winter system peaks are projected to be higher than summer by around 2030+, however this projection is very sensitive to assumptions on when EVs will be charging. • AEG used an annual charging shape provided by Cadeo and developed in the DER study. Applied Energy Group, Inc. | appli
Slide 15: Electrification Decision Modeling
Electrification Decision Modeling Washington Residential Gas Heating Market Transformation • Gas customers were modeled the same way as the electric market, with the option to replace existing gas space or water heating equipment with electric alternatives, using purchase decision logic copied from
Slide 16: Electrification Projection
Electrification Projection Stock share converted by 2045 Residential Washington Idaho Space Heating - Dual-Fuel Heat Pump 29,422 (20.0%) 19,424 (16.7%) Space Heating – Full Electric ASHP 6,242 (4.3%) 1,578 (1.4%) Water Heater – HPWH 1,611 (1.7%) 256 (0.4%) Commercial & Industrial Washington Idaho Sp
Slide 17: Thank You.
Thank You. Phone: 631-434-1414
Slide 18: 2025 IRP Load Forecast
2025 IRP Load Forecast James Gall & Mike Hermanson Technical Advisory Committee Meeting No. 5 April 23, 2024
Slide 19: Transition End Use Model to Load Forecast
Transition End Use Model to Load Forecast Energy Peak • Starts with AEG’s forecast w/ & w/o DSM • Estimate 2024 weather adjusted peak load • Add energy losses (T&D) using historical and future weather data for • Add large industrial loads each month • Escalate loads using AEG’s end use model’s peak
Slide 20: Average Megawatts Energy Forecast
Energy Forecast 1,600 1.47% AAGR 1,400 0.91% AAGR 1,200 Average Megawatts 1,000 1.69% AAGR 0.94% AAGR 800 600 1.07% AAGR 0.85% AAGR 400 WA- 25 IRP WA- 23 IRP ID- 25 IRP ID- 23 IRP 200 System- 25 IRP System- 23 IRP Actual- 5yr Forecast 0 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 202
Slide 21: Peak Distribution
Peak Distribution Load and Temperature Load and Temperature 2002 MW 93 ⁰F 2226 MW -17 ⁰F 1589 MW 77 ⁰F 1588 MW 28 ⁰F 1791 MW 82 ⁰F 1892 MW 3 ⁰F 4
Slide 22: Peak Forecast (1-in-2 weather event)
Peak Forecast (1-in-2 weather event) 3,000 2,500 2,000 Megawatts 1,500 1,000 2023 IRP Summer 2023 IRP Winter Actual Summer 2025 IRP Summer 2025 IRP Winter Actual Winter 500 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038
Slide 23: 2025 Electric IRP Portfolio Proposed Scenario List
2025 Electric IRP Portfolio Proposed Scenario List Scenario Market Price LOLP LOLP Sensitivity Study Study (2030) (2045) 1 Preferred Resource Strategy Deterministic X X Low NG Prices High NG Prices 2 Alternative Lowest Reasonable Cost 3 Baseline: Least Cost Reliable Portfolio Deterministic X X Low N
Slide 24: Scenario Description: 1- Preferred Resource Strategy
Scenario Description: 1- Preferred Resource Strategy: Using the expected case load, resource, and stochastic price forecast, the model will determine the least cost resource strategy meeting each state’s energy and capacity requirements. Portfolio will also track Customer Benefit Indicators in Washi
Slide 25: Scenario Descriptions 15-19
15- Minimal Viable CETA Target: Uses the same portfolio design as the “PRS” scenario except the CETA targets for clean energy use the minimal viable targets from Figure 1. 16- Maximum Viable CETA Target: Uses the same portfolio design as the “PRS” scenario except the CETA targets for clean energy us
Slide 26: Figure 1: CETA Target Scenarios
Figure 1: CETA Target Scenarios 100.0% 100.0% 100.0% 97.1% 100% 95.0% Minimal Viable Targets 92.2% 92.0% 95% Expected Targets 90.0% Percent of Washinton Retail Load Maximum Viable Targets 88.0% 86.8% 90% 85.0% 82.0% 81.8% 85% 80.0% 80.0% 78.0% 80% 76.5% 75.0% 73.0% 73.0% 75% 70.0% 69.5% 70% 66.0% 62