SunEdison Inc

SunEdison — Presentation (April 2016)

34 slides from SunEdison's investor presentation, Apr 15, 2016

  1. Slide 1: Presentation to Principals

    Exhibit 99.1 Presentation to Principals CONFIDENTIAL // Subject fortotheFRE 2nd408 LienMarch Lenders 17, 2016

  2. Slide 2: Disclaimer

    With DISCLAIMER materially (SEC), SunEdison’s offer the financial Such projections accepted P. 1laws Confidential to the projections including sell of exception accounting information from any that orjudgment the such have those reflect /Forms solicitation Material ofprinciples state. been and in hi

  3. Slide 3: Forward-Looking Statements

    Forward-Looking This identified typically “potential,” anticipates future underlying By and fluctuations; efforts; such SunEdison’s SunEdison changes, information with potential P. Confidential 2their financial presentation the differences asgrowth, the unusual nature, Securities except include risk

  4. Slide 4: Contents: Status update, headwinds, path forward

    Status Contents Discussion Path P. Confidential 4 forward update of/& & recent Material next business headwinds steps Non-Public overview Information / Subject to Confidentiality Agreements

  5. Slide 5: Status update, headwinds and management actions

    Status Headwinds Management Material Highlights VSLR TERP/GLBL Significant Headcount Renegotiate Continuing LAP Continuum Other Good SunEdison Incremental Serious DE Reduction P. Confidential 5 Shaw progress smaller Update transaction degradation challenging &in reduction, continues reduction beginn

  6. Slide 6: Headcount reduction

    Headcount SunEdison Total 40% October Targeting Maintaining ~50% % 52 NAMR 32 P. Confidential 6by APAC EMEA reduction Personnel region reduction ’15 force LATAM Actions Headcount Kuching 5balanced / Material 11 currently reductions in headcount COMPANY RIF team reduction Non-Public achieved; Other a

  7. Slide 7: Continued cost change

    Continued COMPANY Change Global Leading Fully Standard Project Savings Major Compressed Lowered Already P. Confidential 7 integrated cost FCC Controls controls implemented identified used global COGS Plant designs cost savings ESTIMATE cycle /along Material forward leadership, infrastructure into Co

  8. Slide 8: Leads summary: pipeline and backlog

    UNAUDITED; Leads Summary1 NA MWs Total Pipeline % 10 International 68 122 P. Confidential See 8NA International Utility MWs definitions Converted: Grand Qualified C&I & 22% (ex. 7,890 Backlog; %36,298 converted2 Total /Backlog) Utility Material NA AS 62% Utility Pipeline for 6,831 C&I 36,298 10,967

  9. Slide 9: Forward utility volume and value creation

    Forward Utility Volume: US LatAm GM China EMEA MW/year In FBR/CCZ TERP/GLBL Residential Ownership MOUs P. Confidential 9addition Utility C&I ($/W): ($): Developing +signed Small MW/year $750M/yr-$900M/yr MW/year ~3 looking C&I technology 1,500-2,000 to and transaction $0.25/W-$0.30/W GW/yr / Dev cor

  10. Slide 10: Contents: Status update, headwinds, path forward

    Status Contents Discussion Path P. Confidential 10 forward update of/& & recent Material next business headwinds steps Non-Public overview Information / Subject to Confidentiality Agreements

  11. Slide 11: Financing and payment obligations

    Financing COMPANY Payment DE Financing3 YieldCo First Mark VSLR GME Renova Riverstone 11,324 (SRP P. Confidential TERP 11Shaw Reserve Italy Group — 79 —shares, Interest TBD in 769 TBD 1211—2152 challenges $100, — 2016 ESTIMATE 37 /435 Interest5 Material 140 TBD TBD not —41 MSS Exp. 1404 -cash 52 M&A

  12. Slide 12: Q1 projected cash sources and uses

    Q1 Projected $M Actual 1,700 1,600 1,400 316 Fixed Cash 1,200 1,300 1,000 700 800 488 21?0S P. Confidential tarting 72%+ Q1 Includes 122016 638 inflows committed Projected Cash 206 718 Cost Q1 of 2nd 619 Sources remaining 53% Projects Outflow projected First Q1 and Lien /600 proceeds Material outflo

  13. Slide 13: Q1 cash inflows and risk assessment

    COMPANY Cash Q1 ($M) 26 153 Key NA LatAm ROA EMEA Corporate: Solar India Other High P. Confidential 13 52016 utility risks 316 Confidence Med flow Equity High projects: Materials: Disbursements: projects: Projects: Remaining 41to Projects: risk Low $40M confidence 91 Q1 ESTIMATE :/ $45M Material Pot

  14. Slide 14: Contents: Status update, headwinds, path forward

    Status Contents Discussion Path P. Confidential 14 forward update of/& & recent Material next business headwinds steps Non-Public overview Information / Subject to Confidentiality Agreements

  15. Slide 15: Sizing key financing goals

    COMPANY Sizing Key Maximize Move Achieve Free 01400 200 P. -400 -200 Confidential -Jan 15Today Goals cash 1-Feb through of$310M potential balance value Minimum Key 1-Mar ESTIMATE / Material process enablers for of($M) financing 1-Apr financing allcash as SunEdison Non-Public AS quickly 1-May balance

  16. Slide 16: Cash walk and financing sizing

    Sources financing Free Includes 76 42 33 323 246 $310M Starting -260 38 66 balance1 (1) P. Confidential 16 non-critical As 246 Cash of57 & Cash impact ations2 March size Flows -140 uses / from Material of $50M through of 10, $310M zation walk accelerated LC 2016 min to Pre-LRP Non-Public cash projec

  17. Slide 17: Proposed financing collateral

    COMPANY Proposed SunEdison All P. Confidential 17assets guarantors pledged contemplates ESTIMATE / Material by&subsidiaries Non-Public collateral that AS OFthe 16 financing that Information MARCH own will various be / Subject secured operating projects toby being under Confidentiality projects all o

  18. Slide 18: 13-week cash flow

    13 WCF AS SUBJECT Date Receipts: NAMR Disbursements: EMEA/LATAM APAC Flow HQ Total Filing BOP Net EOP OF cash cash cash Businesses -Impact (19) 7-Apr APRIL ----------75-75 -by (3) flow 12 (5) balance -----------2626 receipts disbursements (6)(5)(7)(6)(4)(5)(4)(5)(5)(4)(8)(20)(99) TORegion Total (1)(

  19. Slide 19: 13-week cash flow: proposed budget scenario

    Scenario AS Date Receipts: NAMR Disbursements: EMEA/LATAM APAC Flow HQ Total Filing BOP Net EOP P. 0 OF cash | cash cash Businesses -Impact (11) 7-Apr SunEdison --21---75----17113 2(3) -flow 3(b) APR 0balance (14) --1--00441217-71145 receipts disbursements (3)(5)(14)(6)(8)(10)(7)(8)(16)(14)(9)(13)(1

  20. Slide 20: Business Plan Discussion document: Scenarios

    Business Plan Discussion document Scenarios March 30, 2016

  21. Slide 21: Scenarios: funding requirement and cash generation

    Scenarios Scenario ~ Time ~$125M complete Cumulative need funding Approx. free gen. n/a 20161 2017 1Estimated OpEx P. Net 61 months |cash by n/a$260M cash to ofSunEdison YE funding 1are ~$170~$310 ~$250M Scenario ~differentiated ~$555M 9 need monthsn/a Confidential 2Scenario ~$830M2016 by time 3 toE

  22. Slide 22: Scenario 1: cash flow assumptions

    Scenario Project platform sales Fixed Bankruptcy Restructuring TOTAL 2016 BU NA Finance Foreign Other Total Major Figures TERP/GLBL Platform Monetize Projects Opex Implement 1DIP P.After 22Q16- 4Q16 UTL |requirement: Q2-Q4 2Q-4Q cash 2Q16 reduction costs assumptions: SunEdison outflows repayment and

  23. Slide 23: Scenario 1: monthly cash flow

    Scenario Platform/other Other Inflows Project Restructuring Outflows Bankruptcy Total TCF 21Balance P. Exclusive Illustratively AprMayJunJulAugSepOctNovDecTOTAL 32Q163Q164Q162Q16 | outflows inflows inflows Total SunEdison asset costs 1:EOP Opex Monthly expenses of cash sales costs CCC asset (37)(37)

  24. Slide 24: Scenario 2: cash flow assumptions

    Scenario Project platform sales Fixed Bankruptcy Restructuring TOTAL 2016 BU NA Finance Foreign Other Total ?Major 1DIP P.Generally After 42Q16- 4Q16 UTL |requirement: Q2-Q4 2Q-4Q cash 2Q16 costs assumptions: SunEdison outflows repayment and 513 (38) UTL Stack 2and 1,226 flow inflows 3Q164Q16Total t

  25. Slide 25: Scenario 2: monthly cash flow

    Scenario ILLUSTRATIVE Platform/other Other Inflows Project Restructuring Outflows LRP Total TCF 21Balance P. Exclusive Illustratively AprMayJunJulAugSepOctNovDecTOTAL 52Q163Q164Q162Q16 | outflows inflows inflows (15)(12)(12)(12)(2)(17)(2)(2)(2)(78) Total SunEdison asset costs 2:EOP Opex Monthly of c

  26. Slide 26: Scenario 3: status quo assumptions

    Scenario Major Solar Status RSC Shift Consolidate Resulting 2016 BU NA FinanceForeign Other Total 1DIP P. Does 62Q16- 4Q16 UTL |requirement: sold focus 2Q-4Q cash materials 2Q16 assumptions quo SunEdison not (162) 3and opex flow with include to 3Q164Q16Total operations cash C&I selling 4141(80) JV s

  27. Slide 27: Project segment value and investment

    SUNE Segment Asia EMEA LATAM NA Total Future P. Average AverageEstimated 0(USD/kWh)(years)(USD/W)IRRFactor projectAverageExpected leverage debt)($M UTL C&I | 1,552 project Project SunEdison 3,717 612 – 467 324 MW PPAAverageAverageAverageAverage Wind Solar (%Levered USD) 0.0923.9669%0.1722%14%26%238

  28. Slide 28: Future project list by country

    AsTotal Chile Honduras India China Philippines Jordan Israel Egypt South United Future Project Expected (MW)ownership of 12 14 2 3 4 5 6 7 8 9 10 11 14/3/2016 2 3Africa 12project 1States Kingdom Name value India LATAM value EMEA 1EMEA China India EMEA 1 654321expected 987654321LATAM 10 11 12 13 inve

  29. Slide 29: Breakdown of cash usage

    Breakdown $TRACKER JPM, cock, Dominion NA UTL 1Domestic: P. 2in Footnote 0779 144 76 49 42 416 48181 68 58 74 16 1PRIVILEGED millions Han- Hawaii, NA C&I 29APACLAT-EMEARSCGAMWorkingPro-Pay-Mate-TERP/HQOI&ETotal $150M Source: of AMcapitaljectsrollrialsGLBL Jed Bescom, Tangedco, Q1Solar cash &Source F

  30. Slide 30: Presentation to Steering Committee: Cash Update

    Presentation Committee DRAFT CONFIDENTIAL 15 March&2016 SUBJECT for to the Principals’ // 2ndSubject TO Lien CHANGE Steering Lenders–Cash to FRE 408 Update

  31. Slide 31: Disclaimer

    With DISCLAIMER materially (SEC), SunEdison’s offer the financial Such projections accepted P. Confidential 1laws to the projections including sell of exception accounting information from any that or/judgment Material the such have those reflect Forms solicitation ofprinciples state. been and in hi

  32. Slide 32: Forward-Looking Statements

    Forward-Looking This identified typically “potential,” anticipates future underlying By and fluctuations; efforts; such SunEdison’s SunEdison changes, information with potential The P. Confidential 2their financial information presentation the differences asgrowth, the unusual nature, Securities exc

  33. Slide 33: Q1 cash inflows and risk assessment

    Cash COMPANY Q1 PRELIMINARY ($M) High 153 91 Key Inflows over LatAm ROA precedent Criticality weather Corporate: Solar India NA APAC EMEA Other Total: P. Confidential 3265316 41 2016 Utility Utility: risks audit Confidence flow Equity projects: Materials: Disbursements: $273M Vendors: projects: Proj

  34. Slide 34: Remaining Q1 projected inflows by transaction

    Remaining COMPANY PRELIMINARY Name High At Transaction Sub-total TOTAL P. Confidential Amount 4Risk Confidence for Classification $316 US Q1 Q1 153 163 987654321ESTIMATE 10 11 12 13 14 15 16 17 / Material Projected 112inflows High At High Risk Type Non-Public Confidence Confidence Cash ASofof OF Q1

SunEdison — Presentation (April 2016) on 6ix