Indico Resources Ltd. · TSXV:IDI.H

Indico Resources — Investor Presentation (September 2013)

26 slides from Indico Resources's investor presentation, Sep 27, 2013

  1. Slide 1: Porphyry & Skarn Copper-Molybdenum-Gold Exploration

    PORPHYRY & SKARN COPPER-MOLYBDENUM-GOLD EXPLORATION TSX-V: IDI Sept 27, 2013 shortform

  2. Slide 2: Disclaimer

    DISCLAIMER TSX-V: IDI Certain statements contained in this document, including, without limitation, those concerning the economic outlook for the mining industry, expectations regarding metal prices and production, the completion and commencement of commercial operations of certain of Indico Resourc

  3. Slide 3: Company Structure

    COMPANY STRUCTURE TSX-V: IDI 1 Year Chart August 22, 2013 Shares Issued 70.9 million Options 6.0 million Warrants 28.1 million Fully Diluted 105.1 million 52 week high/low $0.28/$0.06 Market Cap $3.70 million Outstanding Incentive Stock Options Expiry Price Amount Proceeds 02/05/2014 $0.21 1,190,000

  4. Slide 4: Management

    MANAGEMENT TSX-V: IDI ROBERT BAXTER President, CEO & Director Mr. Baxter brings over 25 years of experience, principally in Latin America, in the mining industry. Mr. Baxter is the General Manager of Baxter Consultants Engineering, a consulting company located in Peru. From May 2000 to September 200

  5. Slide 5: Board of Directors

    BOARD OF DIRECTORS TSX-V: IDI HENK VAN ALPHEN Director Mr. van Alphen has been in the mining business for 24 years. He began his career as a successful exploration/drilling contractor, and then became the President of Pacific Rim Mining Corp. ("Pacific Rim") where he laid the foundation for Pacific

  6. Slide 6: Board of Directors

    BOARD OF DIRECTORS TSX-V: IDI BRIAN KERZNER Director Mr. Kerzner has over 23 years of experience as a successful entrepreneur in retailing and real estate. Mr. Kerzner is the Founder and President of Rocky Mountain Chocolate Factory Canada Inc., which operates retail chocolate stores from coast to c

  7. Slide 7: Stonehouse - Indico Alliance

    STONEHOUSE - INDICO ALLIANCE TSX-V: IDI  In January 2013, Indico and Stonehouse Construction (SHC) signed a Heads of Agreement to form an Alliance on Indico’s mining properties in Peru.  In May 2013, SHC entered into a private placement subscription for $1,500,000 of convertible debentures, bearin

  8. Slide 8: Introducing Stonehouse Construction

    INTRODUCING STONEHOUSE CONSTRUCTION TSX-V: IDI  Formed by a diverse group of shareholders with established construction and mineral interests spanning South East Asia, India, United Arab Emirates and the Americas.  A mine developer, operator and construction company with a current presence in Cent

  9. Slide 9: Stonehouse Support

    STONEHOUSE SUPPORT TSX-V: IDI  Identify, finance, develop and deliver high-potential Mining and Minerals opportunities, drawing on existing technical partnerships  Conduct due-diligence on post exploration mining assets, with a view to add value and higher returns on investment, through its invest

  10. Slide 10: Stonehouse Mining Experience

    STONEHOUSE MINING EXPERIENCE TSX-V: IDI  Coal – Mt Owen (Australia); Wahana (Indonesia); Sebuku (Indonesia); Amcoal Springbok (South Africa); Kaltim Prima (Indonesia); Merit Pila (Malaysia); Kideco Coal (Indonesia); Arutmin Coal (Indonesia); Merak Coal (Indonesia), Satan Batubara (Indonesia).  Gol

  11. Slide 11: Southern Peru Porphyry Copper Belt

    SOUTHERN PERU PORPHYRY COPPER BELT TSX-V: IDI MORE THAN 40 YEARS OF COPPER PRODUCTION TOQUEPALA MINE (Southern Copper)  3,398 million tonnes @ 0.47% copper Proven & Probable CUAJONE MINE (Southern Copper)  2,626 million tonnes @ 0.47% copper 50 km Proven & Probable CERRO VERDE (Freeport – Cerro Ve

  12. Slide 12: Location and Infrastructure

    LOCATION AND INFRASTRUCTURE TSX-V: IDI Transmission Lines Rio Ocoña Ocaña  500 kv 180 MW Chuquibamba Substation (tendered) Zafranal 220 kv 138 kv Ocoña 60 kv Substation Cerro Verde Hydroelectric Projects In Construction  Redesigned Cuajone Rio Ocoña RoR will 50km Quellaveco be 180MW, ready Mataran

  13. Slide 13: Ocaña Property

    OCAÑA PROPERTY TSX-V: IDI OPTION AGREEMENT Year Cash Shares TSX-V Approval $387,272 2011 (April 20th) $322,727 200,000 2012 $451,818 300,000 2013 $516,364 500,000 2014 $580,909 1,000,000 2015 $15,490,909 6,500,000 TOTAL $17,750,000 8,500,000 INDICO CLAIMS  110 sq. km. property package  100% clear

  14. Slide 14: Ocaña Property - Overview

    OCAÑA PROPERTY - OVERVIEW TSX-V: IDI Looking Northeast Trafigura drill road Camp Good Logistics  Low elevation, between 1700 and 2200 m.a.s.l.; large areas suitable for mine infrastructure  Desert environment allows for stable roads & drill platforms  Water for drilling 10km away in the Rio Ocoña

  15. Slide 15: Ocaña Geology and Phase 2 Drill Results

    OCAÑA GEOLOGY AND PHASE 2 DRILL RESULTS TSX-V: IDI Phase 1: mid-2011  2200 m in 5 holes  Mineralization starts near surface  Clipped copper oxide & 2nd sulphide in shallow supergene zone along south margin Phase 2: late-2012  4733 m in 19 holes  Defined supergene blanket with soluble Cu mineral

  16. Slide 16: Ocaña Proposed Phase 3 Exploration

    OCAÑA PROPOSED PHASE 3 EXPLORATION TSX-V: IDI Phase 3 Drill Proposal  4650 m in 36 holes  32 infill holes at 75- 100m spacing to define supergene zone for initial resource estimation  4 holes will probe eastern limits of high- grade hypogene Phase 3 Budget  Drilling & Support $2.7M  Metallurgy

  17. Slide 17: Ocaña SX/EW Project - Highlights

    OCAÑA SX/EW PROJECT - HIGHLIGHTS TSX-V: IDI  Mineralogy of the oxide species consists of 95% chalcanthite and brochantite with minor malachite and azurite.  Sooty chalcocite makes up about 50% of the supergene material.  Large areas are available for leach pads adjacent to the proposed mining are

  18. Slide 18: Supergene Ore: Soluble Copper for SX/EW

    SUPERGENE ORE: SOLUBLE COPPER FOR SX/EW TSX-V: IDI Solvent extraction and electrowinning (SX/EW) is a two-stage metallurgy process that first extracts and upgrades copper ions from low-grade acidic leach solutions into a solvent containing a chemical that selectively reacts with and solubilizes the

  19. Slide 19: Ocaña Phase 3 Objectives

    OCAÑA PHASE 3 OBJECTIVES TSX-V: IDI Phase 3: Drill the SX/EW project  Convert the current conceptual geological target* of a 20-30Mt SX/EW project with grades between 0.5% Cu and 0.6% Cu to an initial resource estimate  Metallurgical testing should repeat sequential leach average recoveries of 80

  20. Slide 20: Maria Reyna Property Location and Neighbouring Deposits

    MARIA REYNA PROPERTY TSX-V: IDI LOCATION AND NEIGHBOURING DEPOSITS Andahuaylas-Yauri Belt – Southern Peru Huancayo LIMA PLAYERS  Xstrata: Las Bambas (23 billion pounds copper) Tintaya District (26 billion pounds copper) Cotabambas Cusco Eocene – Las Bambas  Panoro: 100km Oligocene Haquira Maria Re

  21. Slide 21: Maria Reyna Property

    MARIA REYNA PROPERTY TSX-V: IDI MARIA REYNA CLAIMS  3164 hectare option package  Three identified Cu skarn zones  One drill-confirmed Cu-Mo porphyry under SW Zone; two others probable  Located on all-season dirt road, about 4.5 hours from regional capital of Cusco  Less than a third of the conc

  22. Slide 22: Maria Reyna Property – Southwest Zone

    MARIA REYNA PROPERTY – SOUTHWEST ZONE TSX-V: IDI SW Zone – looking NE VALE 2010 DRILLING  completed 11 holes DH-011: 160m 1.03% CuEq totaling 5585 metres  mostly targeted highest 72m of 0.47% CuEq DH-003 DH-009 Cu anomaly in surface DH-010: DH-004: 230m of 0.35% CuEq outcrops 62m of 0.68% CuEq (EO

  23. Slide 23: Maria Reyna Highlights

    MARIA REYNA HIGHLIGHTS TSX-V: IDI  Four mineralized Cu-Mo ± Au porphyry-skarn systems with significant potential.  Only one of these, the SW Anomaly, was partially tested with wide-spaced drilling by Vale in 2010.  Vale drilling successfully defined a footprint outlining significant additional mi

  24. Slide 24: Maria Reyna Property Proposed Exploration

    MARIA REYNA PROPERTY PROPOSED EXPLORATION TSX-V: IDI Option Agreement Date Cash Shares TSX-V Approval $2,000,000 - On the Drilling Date - 1,000,000 6 months after Drilling Date - 1,000,000 12, 18, 24, & 30 months after - 2,000,000 36 & 48 months after - 5,000,000 60 months after $20,000,000 10,000,0

  25. Slide 25: Summary

    SUMMARY TSX-V: IDI  The two newest copper discoveries in Peru: Ocaña & Maria Reyna  Both are large-scale Cu-Au-Mo sulphide projects  Low cost SX/EW copper potential at Ocaña, plus upside on neighbouring property  We have more than 50 years combined experience successfully exploring, developing,

  26. Slide 26: Contact Information

    CONTACT INFORMATION TSX-V: IDI CORPORATE OFFICE Indico Resources Ltd. 1010 - 1130 West Pender St. Vancouver, BC, Canada, V6E 4A4 Phone : +1 604.638.5938 Fax: +1 604.408.7499 Email : [email protected] Website: www.indicoresources.com Contact: Robert Baxter [email protected] 26

Indico Resources — Investor Presentation (September 2013) on 6ix