Enertopia Corp. · CSE:ENRT
Enertopia — Investor Presentation (July 2018)
13 slides from Enertopia's investor presentation, July 2018
Slide 1: An USA Lithium Opportunity
OTCQB: ENRT CSE: TOP An USA Lithium Opportunity July 2018
Slide 2: Disclaimer
Disclaimer This presentation includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Statements which are not historical facts are forward-looking statements. The Company make
Slide 3: Project Location Nevada State Map
Project Location Nevada State Map Enertopia currently controls 100% of approximately 160 Acres of Placer and Lode Claims in Clayton Valley, Nevada Enertopia possesses Lithium Technology (ENERLET) licensing Enertopia rights from Genesis Water Lithium Project Technologies (GWT) 3
Slide 4: Enertopia Project Location
Enertopia Project Location Near paved highways and power High solubility Lithium source rocks at surface. 3rd party lab reported up to 75% Li recovery from distilled water and over 95% Li recovery using weak four acid solution. Second phase bench testing will be using lithium source rocks from the p
Slide 5: Enertopia Placer and Lode claim blocks in blue and gold
Enertopia Placer and Lode claim blocks in blue and gold 5
Slide 6: Enertopia Sampling locations shown in Red dots or solid line
Enertopia Sampling locations shown in Red dots or solid line Project work to date in 2017: Two surface sampling programs and bulk sample program. SAMPLE # ME- ME- ME- ICP61 MS41W MS03 PPM Li PPM Li PPM Li Surface Samples CV-004A 920 900 592 CV-004B 960 950 642 CV-005 2050 2070 >1000 CV005A 1940 1930
Slide 7: 3rd party drilling and 3rd party 43-101 Resource Area
3rd party drilling and 3rd party 43-101 Resource Area The map to the right shows where 3rd party drilling in the three red circles has taken place to the west of our Dan and Steve claims in 2017. The yellow hashed area to the east of our Dan and Steve claims shows part of a 43-101 lithium resource o
Slide 8: Importance of Jan 12, 2018 Press Release
Importance of Jan 12, 2018 Press Release Bulk Sample Solution Solution Solution Mg/Li Ratio using Solution pH 2.0 pH 5.5 pH 11.0 pH 11.0 GWT-001 Li head grade in ppm 1,040 1,040 1,040 Li in Solution mg/l 30 20 20 Mg head grade in ppm 25,950 25,950 25,950 Mg in Solution mg/l 307 40 3 0.15/1 GWT-002 L
Slide 9: Importance of Feb 12, 2018 Press Release
Importance of Feb 12, 2018 Press Release Bulk Sample Jan 12 /18 Feb 12/18 Mg/Li Ratio using Solution Solution Solution pH 11.0 at 80 pH 11.0 pH 11.0 degrees Celsius GWT-002 Li head grade in ppm 1,780 1,780 Li in Solution mg/l 170 225* Mg head grade in ppm 21,600 21,400 Mg in Solution in mg/l 3 0.086
Slide 10: President's Message
President’s Message “In 18 months we have gone from the concept of recovering Lithium from brines and soft rock using todays technologies. Now with the addition of our at surface Lithium project our key milestone for our next phase of technology development and ultimate goal of processing battery gr
Slide 11: Management Team
MANAGEMENT TEAM President & CEO: Robert McAllister Mr. McAllister has served as President of Enertopia since November 2007 and as a Director since April 2008. Mr. McAllister was responsible for Investor Relations and Corporate Communications for publicly traded mining and oil & gas listed companies.
Slide 12: Advisory Consultants
ADVISORY CONSULTANTS Dr. John Thomas — Technical Advisor Dr. Thomas is a professional engineer, and holds a B.Sc., an M.Sc., and a Ph.D. in chemical engineering from the University of Manchester in the United Kingdom. He also received a diploma in accounting and finance from the U.K. Association of
Slide 13: Contact Information
CONTACT INFORMATION President & CEO Robert McAllister Phone: 250-765-6412 Share Structure July 2018 Email: [email protected] Issued and Outstanding 115,169,931 Head Office Address: 156 Valleyview Rd. Warrants 40,227,060 Kelowna, BC V1X 3M4 Options 8,740,000 Fully Diluted 164,136,931 OTCQB: EN