Triangle Energy (Global) Limited · ASX:TEG

Triangle Energy (Global) — Australian Energy & Battery Minerals Investor Conference March 2018

15 slides from Triangle Energy (Global)'s conference presentation, March 2018

  1. Slide 1: Oil Production in the Perth Basin

    Oil Production in the Perth Basin CORPORATE PRESENTATION Australian Energy & Battery Minerals Investor Conference March 2018

  2. Slide 2: Triangle Energy (Global) Ltd (ASX:TEG)

    TRIANGLE ENERGY (GLOBAL) LTD (ASX:TEG) Triangle is the only oil producer and a lead player in the highly prospective, under explored Perth Basin  Australian based focus for future growth in oil and gas sector  Majority interest (78.75%) in Cliff Head Oil Field with strong, predictable cash flows 

  3. Slide 3: Corporate Snapshot

    CORPORATE SNAPSHOT Capital Structure and Key Metrics Operating Metrics ASX Code TEG 927 bopd (YTD average) Daily Production (78.75% TEG 730 bopd) Shares on issue1 218,115,544 Unlisted options on 6.000M exc @ $0.06, exp 29 Mar 2019 Net Reserves5 2P Reserves - 2.7 MMstb issue 11.155M exc @ $0.15, exp

  4. Slide 4: TEG 12 Month Share Price Performance

    TEG 12 MONTH SHARE PRICE PERFORMANCE TRIANGLE ENERGY (GLOBAL) LIMITED 12 MONTH SHARE PRICE PERFORMANCE 0.25 Seismic 4,500,000 Completes State Gas 4,000,000 Oil debuts Reserves 0.20 Discovery on ASX Upgrade 3,500,000 TEG AUD Share Price Xanadu-1 DJ Carmichael 3,000,000 0.15 Price target Volume Xanadu

  5. Slide 5: Cliff Head Oil Field

    CLIFF HEAD OIL FIELD Building a strong presence in the Perth Basin  Triangle 78.75% interest and Operator; Royal Energy Pty Ltd 21.25%  Predictable production and cash flow (~1000 bopd)  Operator of onshore & offshore Infrastructure - essential for any exploration success in the region  Only ope

  6. Slide 6: Cliff Head Oil Field - Location

    CLIFF HEAD OIL FIELD - LOCATION  300km north of Perth, WA  40km south of Dongara  Crude trucked to BP refinery in Kwinana  Two x 14km pipelines CHA to ASP  Water depth of 15-20 metres  Underexplored Perth Basin 6

  7. Slide 7: Operations Snapshot

    OPERATIONS SNAPSHOT Significant Cost Savings Achieved  Routine operating costs significantly reduced. Further cost rationalisation strategies, ongoing operational efficiencies CHJV Total Forecast (100%) USD Per Barrel Forecast sales USD 21.2 million USD 60 per bbl Forecast lifting costs (USD 10.5 m

  8. Slide 8: Cliff Head – Production Upside

    CLIFF HEAD – PRODUCTION UPSIDE Asset Life Extension Program  Targeting doubling production  Reserve upgrade expected  Subsurface reservoir remodeling  $5.5m upgrade of Arrowsmith  Re-enter mature field 8 Development opportunities

  9. Slide 9: Xanadu-1 JV Oil Discovery

    XANADU-1 JV Oil Discovery  30% participating interest  Conventional oil play, 3 zones encountered  Discovery notice lodged with the Department of Mines, Industry Regulation and Safety  Oil discovery properties similar to Cliff Head  Ability to process oil at Triangle’s Arrowsmith processing fac

  10. Slide 10: Xanadu-1 JV – Seismic Program

    XANADU-1 JV – SEISMIC PROGRAM 3D Seismic Survey  Xanadu 40 km2 3D Seismic Survey Acquisition  Overlying a full tensor gradiometric image, highlighting up-dip and down-dip potential at Xanadu. * Refer NWE announcement 26 February 2018 10

  11. Slide 11: Arrowsmith / Xanadu-1 Proximity

    ARROWSMITH / XANADU-1 PROXIMITY Arrowsmith Production Facility Cliff Head Oil Field Xanadu 1 Drilling onshore to offshore Proximity to ASP 11

  12. Slide 12: State Gas Limited (PL 231) – 35.47% Interest

    STATE GAS LIMITED (PL 231) – 35.47% Interest  Triangle holds largest stake in State Gas Ltd (ASX:GAS) with 35.47% equity interest worth ~$14.344 million at 10 March 2018  Queensland conventional gas appraisal asset with multiple hydrocarbon bearing horizons in the Bowen Basin, Qld 12 Flaring of Al

  13. Slide 13: Investment Proposition

    INVESTMENT PROPOSITION  Majority 78.75% interest and Operator of Cliff Head  Production upside with “Asset Life Extension Project”  Cliff Head Platform and the Arrowsmith Stabilisation Plant are the only offshore and onshore infrastructure operating in the Perth Basin Arrowsmith Stabilisation Pla

  14. Slide 14: Triangle Energy Limited (ASX:TEG)

    Triangle Energy Limited (ASX:TEG) Unit 7 589 Stirling Highway Cottesloe WA 6911 Australia E: [email protected] T: +61 8 9286 8300 | F: +61 8 9385 5184 | W: www.triangleenergy.com.au

  15. Slide 15: Disclaimer and Forward Looking Statements

    DISCLAIMER AND FORWARD LOOKING STATEMENTS  This Presentation is provided on the basis that Triangle Energy (Global) Limited (“Triangle” or the “Company”) nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any repre

Triangle Energy (Global) — Australian Energy & Battery Minerals Investor Conference March 2018 on 6ix