Golar LNG Limited · NASDAQ:GLNG

Golar LNG — Q3 2026 Earnings Presentation

26 slides from Golar LNG's earnings presentation, Nov 18, 2026

  1. Slide 1: Third Quarter 2026 Results

    Slide 1: Third Quarter 2026 Results

    THIRD QUARTER 2026 RESULTS November 18, 2026 Golar LNG Limited 2026 I

  2. Slide 2: Forward looking statements

    Slide 2: Forward looking statements

    Forward looking statements This press release contains forward-looking statements actual results to differ materially from those in the transaction, strategic alternative, or other outcome; the contracts to which we are a party; the ability of certain (as defined in Section 21E of the Securities Exc

  3. Slide 3: Golar LNG | Market-leading FLNG operator with visible growth

    Slide 3: Golar LNG | Market-leading FLNG operator with visible growth

    Golar LNG | Market-leading FLNG operator with visible growth FLNG ASSET PORTFOLIO INVESTMENTS KEY FIGURES START-UP IN 2027 OPERATIONAL $4.3BN Market Cap2 12MTPA+ Total Golar controlled liquefaction capacity Golar shareholding: 10% $2.3BN • Conversion for 2029 delivery Total• available liquidity, inc

  4. Slide 4: Adjusted EBITDA backlog of ~$17bn before commodity and inflationary upside

    Slide 4: Adjusted EBITDA backlog of ~$17bn before commodity and inflationary upside

    Adjusted EBITDA backlog (before FLNG #4)1,5 of ~$17bn before commodity and inflationary upside 1,5 Golar LNG Limited 2026 I 4

  5. Slide 5: Q3 Business update

    Slide 5: Q3 Business update

    Q3 Business update Group results Summary Golar LNG Limited 2026 I 5

  6. Slide 6: Recent highlights & developments

    Slide 6: Recent highlights & developments

    Recent highlights & developments FLNG Hilli arrived at Seatrium shipyard for planned modifications ahead of its 20-year Argentina contract. Completed 156 cargoes throughout the 8-year LTA in Cameroon FLNG Gimi sustained excellent operational performance, invoicing 3% above the contractual day rate d

  7. Slide 7: FLNG #1 | Hilli upgrades on schedule and on budget

    Slide 7: FLNG #1 | Hilli upgrades on schedule and on budget

    FLNG #1 | Hilli upgrades on schedule and on budget FLNG Hilli highlights Number of cargoes offloaded from Cameroon 156 LNG produced during 8-year Cameroon contract 10.79 MT Q3 2026 Adjusted EBITDA1 $5m Start date of redeployment contract (COD) with SESA H2 2027 • FLNG Hilli departed from Kribi in Au

  8. Slide 8: FLNG #2 | Gimi continues producing above contractual levels

    Slide 8: FLNG #2 | Gimi continues producing above contractual levels

    FLNG #2 | Gimi continues producing above contractual levels FLNG Gimi highlights FLNG Gimi – continues its strong operational performance Start date of contract (COD) with bp June 2025 14 Prelude (3.6 MTPA) Coral South (3.4 MTPA) End date of contract term June 2045 12 Cumulative LNG Production Hilli

  9. Slide 9: FLNG #3 | Esperanza project on schedule and on budget

    Slide 9: FLNG #3 | Esperanza project on schedule and on budget

    FLNG #3 | Esperanza project on schedule and on budget Esperanza progressing toward contract start-up in 2028 • 20-year redeployment contract with SESA expected to start in H2 2028 contributing annual Adjusted EBITDA1 of $400m with an Adjusted EBITDA backlog1,5 of $8bn before commodity upside • Proje

  10. Slide 10: Argentina | Infrastructure advancing ahead of FLNG's arrival

    Slide 10: Argentina | Infrastructure advancing ahead of FLNG's arrival

    Argentina | Infrastructure advancing ahead of FLNG's arrival SESA infrastructure execution progressing to plan Piping and steel structure positioning Hilli SSY in Navacel (Spain) SESA • Includes onshore pipe laying and offshore pipe trenching, construction of compressor station, infrastructure moori

  11. Slide 11: FLNG #4 | The earliest available FLNG globally

    Slide 11: FLNG #4 | The earliest available FLNG globally

    FLNG #4 | The earliest available FLNG globally Golar’s FLNG #4 highlights Arrival of Grace Dahlia to the yard • Golar’s second 3.5 MTPA MKII FLNG, similar to the FLNG Esperanza, is progressing at CIMC Raffles shipyard. Long-lead equipment fabrication is continuing, and pre- ordered equipment has sta

  12. Slide 12: Significant accretion potential of Golar's FLNG #4

    Slide 12: Significant accretion potential of Golar's FLNG #4

    Significant accretion potential of Golar’s FLNG #4 12 MTPA+ Increased Golar controlled liquefaction capacity from 8.6 MTPA to 12.1MTPA ~50% Potential annual earnings increase of ~50% if contracted at similar terms to the FLNG Esperanza Diversification of Golar earnings backlog Replicable model with

  13. Slide 13: Clear momentum behind FLNG build-out

    Slide 13: Clear momentum behind FLNG build-out

    Clear momentum behind FLNG build-out Proven technology, entering growth A capital-efficient alternative with Supply diversification supports Golar’s Golar is ready to deliver phase lower exposure to onshore risks growth pipeline 300 FPSO industry: growth of 10-15 units per year 200 100 0 1985 1987 1

  14. Slide 14: FLNG growth initiatives

    Slide 14: FLNG growth initiatives

    FLNG growth initiatives CIMC Raffles, Yantai China Seatrium, Singapore Signed LOI with Seatrium shipyard, securing yard slot for incremental EPC contract for FLNG #4 includes option for incremental FLNG unit FLNG units Strong existing relationship through converting FLNG Hilli and FLNG Strong existi

  15. Slide 15: Group results

    Slide 15: Group results

    Q3 Business update Group results Summary Golar LNG Limited 2026 I 15

  16. Slide 16: Financial performance | Q3 2026

    Slide 16: Financial performance | Q3 2026

    Financial performance | Q3 2026 Q3 2026 financial highlights Q3 2026 financial highlights and recent updates Q3 2026 Q2 2026 2026 YTD 2025 YTD Operating Revenue ($m) Adjusted EBITDA1 ($m) Net Income ($m) $m $m $m $m 130 127 Total operating revenue 84 130 352 261 84 56 56 Commodity-linked earnings12,

  17. Slide 17: Balance sheet flexibility to fund continued FLNG growth

    Slide 17: Balance sheet flexibility to fund continued FLNG growth

    Balance sheet flexibility to fund continued FLNG growth Liquidity and Net debt position ($m) Remaining Capex commitments ($m) Contract milestones: H2 2027: H2 2028: Q4 2029: Q3 2026 Q2 2026 FLNG Hilli FLNG Esperanza FLNG #4 delivery start-up in Argentina start-up in Argentina from yard Golar's share

  18. Slide 18: Strong contracted EBITDA with attractive commodity-linked upside

    Slide 18: Strong contracted EBITDA with attractive commodity-linked upside

    Strong contracted EBITDA with attractive commodity-linked upside Pathway to ~50% annual earnings increase if FLNG #4 contracted at similar terms Significant earnings upside potential from SESA to the FLNG Esperanza contract FOB-linked earnings 3.9bn 4,000 Annual Base Fixed Adjusted EBITDA1,7, before

  19. Slide 19: Summary

    Slide 19: Summary

    Q3 Business update Group results Summary Golar LNG Limited 2026 I 19

  20. Slide 20: Summary

    Slide 20: Summary

    Summary Leading global FLNG platform with 12.1 MTPA of controlled capacity 100% economic uptime and delivered 206 LNG cargoes to date Adjusted EBITDA backlog (before FLNG #4)1,5 of ~$17bn before commodity upside $17bn+ and inflationary adjustments, further upside in charter for FLNG #4 FLNG Hilli, F

  21. Slide 21: Appendix

    Slide 21: Appendix

    Appendix Golar LNG Limited 2026 I 21

  22. Slide 22: Appendix: Golar Q3 2026 Debt Summary

    Slide 22: Appendix: Golar Q3 2026 Debt Summary

    Appendix: Golar Q3 2026 Debt Summary Total Golar Cash1: ~$0.7bn Golar LNG Limited Golar LNG Limited: $300m Unsecured Bond due 2029 (7.00%) (Nasdaq: GLNG) $500m Unsecured Notes due 2030 (7.50%) $575m Convertible Bond due 2030 (2.75%) $500m Unsecured Notes due 2031 (7.50%) Gimi Holding Company Golar H

  23. Slide 23: Appendix: Fleet summary

    Slide 23: Appendix: Fleet summary

    Appendix: Fleet summary Current Contract Year of Delivery Liquefaction Vessel Name Flag Type Ownership Counterparty Expiration/ from Shipyard Capacity (MTPA) Commencement 20-year contract FLNG Hilli Undergoing upgrades 2.4 Marshall Islands FLNG Moss 100% SESA (H2 2027) to commence (H2 2027) 20 years

  24. Slide 24: Appendix: Adjusted EBITDA reconciliation

    Slide 24: Appendix: Adjusted EBITDA reconciliation

    Appendix: Adjusted EBITDA1 reconciliation Three Months Ended September 30 June 30 September 30 (in thousands of $) 2026 2026 2025 Net Income 42,080 55,835 45,710 Income tax expense 1,477 1,724 1,788 Net income before income taxes 43,557 57,559 47,498 Depreciation and amortization 11,575 14,249 12,20

  25. Slide 25: Appendix: Endnotes

    Slide 25: Appendix: Endnotes

    Appendix: Endnotes 1. Non-GAAP Measures: Please see our Q3 2026 and Q2 2026 earnings release for a reconciliation to the most comparable US GAAP measure and the rationale for the adjustments: https://www.golarlng.com/investors/quarterly-reports/2026 2. Shares issued and outstanding as of November 17

  26. Slide 26: Appendix: Abbreviations used

    Slide 26: Appendix: Abbreviations used

    Appendix: Abbreviations used Capex Capital Expenditure COD Commercial Operations Date cbm Cubic Meter EBITDA Earnings before interest, taxes, depreciation and amortization EPC Engineering, Procurement and Construction FLNG Floating Liquefaction Natural Gas vessel FPSO Floating Production Storage and

Source: company website

More decks from Golar LNG Limited

All 22 Golar LNG decks