Companhia Energetica de Minas Gerais SA · BMFBOVESPA:CMIG3
Companhia Energetica de Minas Gerais SA — Non-Deal Roadshow (December 2012)
131 slides from Companhia Energetica de Minas Gerais SA's roadshow presentation, Dec 10, 2012

Slide 1: Successful Strategy
Successful Strategy Performance reflects balanced portfolio structure December, 2012

Slide 2: Disclaimer
Disclaimer Some statements and estimates in this material may represent expectations about future events or results that involve risks and uncertainties known and unknown. There is no guarantee that the events or results referred to in these expectations will occur. These expectations are based on p

Slide 3: Brazil's Leading Power Utility
Brazil’s Leading Power Utility Integrated Growth in Market cap Role in Power EBITDA of US$ industry Utility in 2006-11 9.7(1) B. Brazil (2) Leading #1 +79% #3 consolidator In the Power Industry since 1952 (1) As of November 7th, 2012 (2) In the Brazilian Power Industry 3

Slide 4: Cemig: Strength in Numbers
Cemig: Strength in Numbers Number of power plants 70 Total installed capacity 7,038 MW Locations in Minas Gerais State 5,415 Size of concession area vs. France Larger Electricity Distribution lines 510,744 km Power Transmission lines 10,060 km 4

Slide 5: Cemig at a Glance
Cemig at a Glance ● Based in State of Minas Gerais, controlling shareholder – growing throughout Brazil and Chile ● Strong financial profile: – 3Q11 - Net revenues: R$ 4,0B EBITDA: R$ 1.5B – 3Q12 - Net revenues: R$ 4.8B EBITDA: R$ 1.8B ● Highest liquidity in the sector – listed on 3 stock exchanges

Slide 6: The Cemig Story – Agenda
The Cemig Story – Agenda The positioning The performance The growth 6

Slide 7: Cemig is Uniquely Positioned
Cemig is Uniquely Positioned 1 The Brazil advantage 2 Unmatched scale 3 Diversified portfolio 4 Leader in renewable energy 5 Strong governance 7

Slide 8: An Emerging Powerhouse Economy
1 BRAZIL ADVANTAGE An Emerging Powerhouse Economy Latin American economy #1 Ranking of economy in world #6 GDP 2011 US$2.5 Trillion GDP growth 2011 2.7% Population 191M Investment grade by Moody’s, Fitch and S&P 8

Slide 9: Largest Integrated Utility in Brazil
2 UNMATCHED SCALE Largest Integrated Utility in Brazil #1 #3 #3 #1 Electricity Largest power Largest power Integrated + + distributor* transmission generation utility group group RR AP Power Generation Power Generation (under construction) AM PA MA CE RN Power Transmission PB PI Power Transmission (

Slide 10: Diversified, Low Risk Business Portfolio
3 DIVERSIFIED Diversified, Low Risk Business Portfolio Breakdown of EBITDA Sep/12 2011 29% 2011 37% 48% 45% 23% 18% Generation Transmission Distribution and Others Most of revenues are inflation protected Sep/12 - Transmission business affected for Gain on issuance of shares 10

Slide 11: Leader in Renewable Hydro Power Energy
4 RENEWABLE LEADER Leader in Renewable Hydro Power Energy Power Generation by Source 8% 17% 2% 14% 80% 98% 68% 3% 9% 2% World 08 Brazil 11 Cemig 11 Fossil Source Fuels Nuclear Hydro Others 11 Source: EPE [BEN 2011 – Preliminar Results and IEA [KeyWorld EnergyStatistics-2010]

Slide 12: Best-in-Class Corporate Governance
5 GOVERNANCE Best-in-Class Corporate Governance Minas Gerais, controlling shareholder – a positive influence – one of fastest growing, investor-friendly states in Brazil – growth and profitability interest aligned with minority shareholders – 5 from a total of 14 members are appointed by minority

Slide 13: The Cemig Story – Agenda
The Cemig Story – Agenda The positioning The performance The growth 13

Slide 14: Growth in EBITDA
Growth in EBITDA R$ million 5,958* 5,351 4,588 4,543 4,090 EBITDA Margin: 34% Sep/12 2008 2009 2010 2011 2012 (*) Last 12 months’ Ebitda 14

Slide 15: Net Income Continues to Expand
Net Income Continues to Expand R$ million 2.882* 2.415 2.258 2.134 Net Margin: 15% 1.755 Sep/12 2008 2009 2010 2011 2012 (*) Last 12 months’ Net Income 15

Slide 16: Attractive and Secure Dividend Payout
Attractive and Secure Dividend Payout (1) Dividend Payout Dividend Yield (%) (% of Net Income) Preferred shares 11 98 91 9 6 6 50 50 2008 2009 2010 2011 2008 2009 2010 2011 Approved the proposal for 2011 Net Income distribution: • 53.58% of the net income - R$ 1.294 billion to payment of dividends

Slide 17: Strong Balance Sheet to Support Growth
Strong Balance Sheet to Support Growth Net debt to EBITDA 2.0X Debt in foreign currency(*) 3% Cash on hand R$4,7B Net Revenue 3Q12 R$ 4.8B *Net of financial hedging 17

Slide 18: EBITDA guidance
EBITDA guidance EBITDA guidance(1) 2012-2016 R$ million 7500 6750 Year Lower limit Upper limit 2012 5,400 6,200 6000 2013 5,400 6,200 2014 5,560 6,400 5250 2015 5,740 6,600 2016 5,740 6,600 4500 Consolidated includes the amounts of the holding company 2012 2013 2014 2015 2016 and affiliated companie

Slide 19: The Cemig Story – Agenda
The Cemig Story – Agenda The positioning The performance The growth 19

Slide 20: Clear Long Term Goals
Clear Long Term Goals Current Share of Brazil Long Term Goal Markets 20% 13% 12% 7% 6% Electricity Distribution Power Generation Power Transmission Share of Natural Gas ALL power markets Distribution Brazilian generation market – (% of total installed capacity) Brazilian transmission market – (%

Slide 21: Target Ebitda contribution by business in the long run
Target Ebitda contribution by business in the long run CIA. ENERGÉTICA DE MINAS GERAIS Power Power Electricity Natural Transmission Distribution Gas Distribution Telecom Services Generation 40% 20% 40% 21

Slide 22: Growth Drivers
Growth Drivers 1 Leverage price increases $ 2 Improve operating efficiency 3 Geographic expansion 22

Slide 23: Record of Successful Acquisitions
GROWTH DRIVER #2 Record of Successful Acquisitions Business Model for Growth ● Partnerships with Equity Investment Funds (FIPs) in recent acquisitions (Terna and Light) create a new growth driver ● Structuring of partnerships with FIPs produces a growth strategy that optimizes capital needs ● Innova

Slide 24: Clear Priorities for 2012
Clear Priorities for 2012 1 Execute cost reductions 2 Integrate Taesa and Light acquisitions Priorities 3 Participate in green fields 4 Select new acquisitions 24

Slide 25: Why Invest in Cemig
Why Invest in Cemig Leading power utility in Brazil Powerful drivers fueling growth Sound Balance Sheet Consistent profitable track record Strong Dividend Policy World Leader in Sustainability 25

Slide 26: Appendix
CMIG A Melhor Energia do Brasil. Appendix 26

Slide 27: Agenda
Agenda •Background •Strategy Overview •Business Outlook •Acquisitions •Results •Market Recognition •Regulatory Framework •Others 27

Slide 28: Brazilian GDP growth is driven by domestic market
Brazilian GDP growth is driven by domestic market Economics Largest Latin America economy 6th largest world economy BRAZIL GDP (2011): US$ 2.5 trillion (+2.7%) Electric Power Industry Inhabitants: 191 million Area: 8.5 million km2 Power Generation Currency(1): Reais (BRL) – US$1 = R$ 1

Slide 29: Companies and Consortia of the Cemig Group
Companies and Consortia of the Cemig Group 114 Companies - 16 Consortias At October 31th, 2012 Key Transmission companies Distribution companies Generation companies Wind power companies Generation consortia Non-profit Distribution of gas Telecoms Trading Holding company Services Generation consorti

Slide 30: Strong shareholders base assures liquidity
Strong shareholders base assures liquidity North America EUROPE Austria Ireland Portugal ASIA Canada Mexico Belgium Italy Romania Brunei USA Denmark Jersey Spain Japan France Luxembourg Sweden Malaysia Germany Norway Switzerland Singapore Guernsey Poland UK South Korea Holland Taiwan Central America

Slide 31: Cemig: a global investment option
Cemig: a global investment option Non-Brazilian investors as % of free float* 70% 60% 50% 26% 40% 22% 26% 33% 35% 30% 20% 32% 31% 35% 10% 26% 24% 0% 2008 2009 2010 2011 may/12 ADR Bovespa Preferred Share * Free float = all shares in circulation except those held by the State of Minas Gerais. • The p

Slide 32: The blend of shareholders provides long term perspective
The blend of shareholders provides long term perspective Our shareholder diversity provides a global business Total Shares management vision focused on sustainability of the company's activities ON PN 44% 56% Listed in major stock exchanges BOVESPA (Brazil) ON 5% 11% NYSE (USA) LATIBEX (Sp

Slide 33: Corporate Governance: implementation of best practices
Corporate Governance: implementation of best practices Highlights • Code of ethics; • 5 BoD members appointed by minority shareholders; Shareholders • BoD approves all investments above R$14mn; • BoD approves nomination of external auditors; • Executive Board coordinates external auditor selection p

Slide 34: Leadership in sustainability, a core value at Cemig
Leadership in sustainability, a core value at Cemig • Social and Environmental responsibilities • Long-term vision commitment • To guarantee the preservation of our activities • Prevent undue costs to be passed to the society through a balanced relationship with the environment and the community • R

Slide 35: Why is Cemig Sustainable?
Why is Cemig Sustainable? 1. Financial Strength 2. Strategic Management 3. Commitment to clients 4. Profitable Investments 5. Technological Innovation 6. Commitment to stakeholders 7. Dedication towards the environment 8. Focus on Renewables 9. Care for human capital 10.Social Responsibility 35

Slide 36: Global Compact
Global Compact In 2009 Cemig joined the Global Compact and published its “Corporate Social Responsibility” handbook. The principles of the Global Compact 1. Businesses should support and respect the protection of internationally proclaimed human rights in their area of influence; and 2. make sure

Slide 37: The Largest Integrated Power Utility in Brazil
The Largest Integrated Power Utility in Brazil Power Generation Free Customers 7,038 MW of capacity 25% share Power Transmission 10,060 Km Retail Electricity Distribution Largest distribution 510,744 Km company 37

Slide 38: EBITDA Guidance 2012-2013
EBITDA Guidance 2012-2013 Cemig D Cemig GT – Consolidated 2100 4000 1850 3500 1600 3000 Lower Upper Lower Upper Year Year 1350 limit limit 2500 limit limit 2012 1,480 1,810 2012 2,700 3,400 2013 1,640 2,000 2013 2,820 3,450 1100 2000 2012 2013 2012 2013 Holdings 1200 1050 900 Lower Uper Year 750 lim

Slide 39: Net Income and Ebitda per company
Net Income and Ebitda per company (R$ Million) 3Q12 - Transmission business affected for Gain on issuance of shares 39

Slide 40: Financial Highlights
Financial Highlights Income Statement - Consolidated R$ million 3Q12 3Q11 Net Revenue 4,810 4,036 Ebitda 1,752 1,489 Ebitda margin % 36,4% 36,9% Net Income 937 657 Net margin % 19,5% 16,3% Balance Sheet - Consolidated R$ million Set/12 2011 Cash and Cash equivalent 4,680 2,862 Total Assets 39,223 37

Slide 41: Debt profile lengthened with reduction of costs
Debt profile lengthened with reduction of costs 41

Slide 42: Debt profile lengthened with reduction of costs – Cemig GT
Debt profile lengthened with reduction of costs – Cemig GT 42

Slide 43: Debt profile lengthened with reduction of costs – Cemig D
Debt profile lengthened with reduction of costs – Cemig D 43

Slide 44: Superior credit capacity recognized by the major rating agencies
Superior credit capacity recognized by the major rating agencies AA(bra) Cemig H, Cemig GT and Cemig D National scale Investment Grade Speculative Grade AA+ AA AA- A+ A A- BBB+ BBB BBB- BB+ BB BB- B+ B B- CCC CC C RD D Aa1.br Cemig GT and Cemig D National scale Aa2.br Cemig H National scale Investme

Slide 45: Opportunities of raising funds to finance expansion
Opportunities of raising funds to finance expansion Cemig is ready to enjoy market liquidity Local Bank Market Local Capital Market Debt rollover Debêntures are the major source of funds for investment (long term and inflation indexed) Assignment of receivables Securitizations Project Fina

Slide 46: Agenda
Agenda •Background •Strategy Overview •Business Outlook •Acquisitions •Results •Market Recognition •Regulatory Framework •Others 46

Slide 47: Long Term Strategic Plan addresses sustainable growth
Long Term Strategic Plan addresses sustainable growth… • Broadening of CEMIG's area of activity, focusing on the electric industry – Growth within Brazil's geographical area – First steps towards international investments – Expansion in line with Brazilian regulatory limits and sustainable growth –

Slide 48: Investment policy to guarantee sustainable growth
…Investment policy to guarantee sustainable growth • Pillars of our activity: • Focus on electricity sector and related activities • Profitability: return compatible with each business • Partnerships with strategic investors: corporate governance • Growth through new projects, long-term vision • Opp

Slide 49: Strategic Plan Results
Strategic Plan Results Power Generation Power Transmission lines - km 107% 238 119 44 76 142 10.060 470 4.856 2004 2012 18% 7.038 Sub-transmission lines -km 5.949 18% 18.971 16.086 2005 2006 2007 2008 2009 2010 2011 in 2012 2004 2012 Electricity Distribution lines -km Our power matrix ensures high

Slide 50: Strategic Plan Results
Strategic Plan Results Net margin (%) Ebitda margin (%) 38 40 38 37 20 17 17 18 18 15 35 33 Net income (R$ million) Ebitda (R$ million) 2,415 4,588 4,543 5,351 2,258 3,222 4,062 4,099 1,719 1,743 1,887 2,134 2006 2007 2008 2009* 2010* 2011* 2006 2007 2008 2009* 2010* 2011* Dividend pay-out (% of Net

Slide 51: Strategic Plan Results: Dividends
Strategic Plan Results: Dividends Approved the proposal for 2011 Net Income distribution: • 53.58% of the net income - R$ 1.294 billion to payment of dividends - R$1.90/share • Based on total shares before stock bonus to be proposed on April 27, 2012 Dividends paid in 2011 reach R$ 2.04 billion

Slide 52: Results reflect long-term vision
Results reflect long-term vision Company's structure oriented towards electricity sector consolidation Operational excellence aligned with costs reduction Investment criteria defined by Strategic Plan to add value Risk management ensures reliable processes Corporate governance as a corpora

Slide 53: Continuous improvement of our KPI
Continuous improvement of our KPI Leverage (%) Key debt indicators (%) Debt / (Debt + Equity) 5,0 48 44 53 50 52 4,0 4,2 4,2 4,0 2007 2008 2009 2010 2011 2,2 2,2 2,4 1,7 Leverage (%) 1,2 2007 2010 2009 2010 2011 Debt/Ebitda Ebitda/Interes t Key performance indicators in line with Long Term Strategic

Slide 54: Agenda
Agenda •Background •Strategy Overview •Business Outlook •Acquisitions •Results •Market Recognition •Regulatory Framework •Others 54

Slide 55: Basics of our business portfolio
Basics of our business portfolio • Power generation – More competitive environment • Regulated market : long term contracts with distributors sales through public auctions. • Un-regulated market : medium term contract with large clients. Contract terms bilaterally negotiated. • Power transmission –

Slide 56: Power Generation: Cemig
Power Generation: Cemig Installed Capacity (June/2012) Installed capacity Efective Power Plant (MW) (MW Average) São Simão 1.710 1.281 Emborcação 1.192 497 Nova Ponte 510 276 Jaguara 424 336 Miranda 408 202 Três Marias 396 239 Volta Grande 380 229 Irapé 360 206 Aimorés 330 172 Others hydro 807 542 H

Slide 57: Power Generation: Expansion
Power Generation: Expansion New projects Plant Installed capacity Cemig Start up date Start up date with (MW) stake (%) total capacity Santo Antônio 3,150 10% 2012 2016 Itaocara Hydro Plant* 195 49% Belo Monte* 11,233 7,28% 2015 2018 * With Light Installed capacity (MW) 6.896 6.964 7.038 6.678 6.7

Slide 58: CEMIG GT – Supply-demand balance
GROWTH DRIVR #1 CEMIG GT – Supply-demand balance Detail of requirements Secondary supply as transacted in spot market in 2011; estimate for 2012 Probable renewals Negotiations in progress Conventional energy Available for sales or trading Intermediation (transferred to Cemig Trading) Free Market sal

Slide 59: CEMIG GT: Power generation prices estimates
CEMIG GT: Power generation prices estimates Effect of renewal of existing contracts (R$/MWh) 140 Replacement of existing contracts, starting in 2015, by new contracts with higher 125 125 125 prices than the present. 116 116 121 121 110 113 113 113 95 80 2012 2013 2014 2015 2016 (Constant June 2012

Slide 60: Power Generation Sales Volume Estimates: CEMIG GT
Power Generation Sales Volume Estimates:CEMIG GT Market – TWh 50 38.3 40 37.5 38.1 2.3 35.8 35.4 36.1 30 20 10 0 2012 2013 2014 2015 2016 Own generation Secondary output Participation in the system’s Secondary Generation in 2012 (generation in excess of physical guarantees, resulting from favorabl

Slide 61: Brazilian National Grid
Brazilian National Grid 90,000 80,000 70,000 MW-médios 60,000 50,000 40,000 30,000 20,000 10,000 - 2011 2012 2013 2014 2015 2016 Balanço (%) 1.3% 1.9% 6.0% 5.1% 2.3% Balanço 776 1,248 4,106 3,595 1,731 Reserva 1,400 1,716 2,203 2,207 3,391 Term 13,024 15,054 18,543 18,806 18,776 Hidr 48,815 51,211 5

Slide 62: Level of reservoirs
Level of reservoirs (%)* Level of reservoirs by region (%) 100 90 80 79,58 73,91 70 66,91 60 60,36 50 40 30 20 Apr-11 Apr-12 Mar-11 Mar-12 Oct-11 Oct-12 Jan-11 Dec-11 Jan-12 Dec-12 Feb-11 May-11 Sep-11 Feb-12 May-12 Sep-12 Aug-11 Nov-11 Aug-12 Nov-12 Jun-11 Jul-11 Jun-12 Jul-12 Northeast North South

Slide 63: Spot Market: 2011/2012
Spot Market: 2011/2012 Brazil: electricity spot price - monthly average (R$/MWh) 250 200 150 111,74 100 91,24 50 29.55 0 Monthly average spot price, R$/MWh 2011 average 2012 average, up to end-November *Source: CCEE 63

Slide 64: Power Generation Auctions: 2011/2012
Power Generation Auctions:2011/2012 Capacity Efective Power Name Date Power Plant Price/MWh Installed(MW) (MW Average) 2011 Adjustment Auctions* th Existent energy - - R$ 109.84 avg February 17 Wind power (44 projects) 1,067.7 484.2 99.58 A-3 2011 450.0 209.3 102.0 Hydro Plant (1 project) Reserve Po

Slide 65: Business Opportunities: Small Hydros Program
Current status Business Opportunities: Small Hydros Program Short-term supply alternative Successful funding format: – 30% Equity • Cemig 49% Àrea reservada para o mapa • Private Investor 51% – 70% Debt • BNDES Current status: • Cachoeirão Small Hydro Power Plant (27 MW) in commercial operatio

Slide 66: Business Opportunities: biomass cogeneration
Business Opportunities: biomass cogeneration Sugar and ethanol potencial in Minas gerais Plants Quantity* Generatn. (MWa**) Surplus (MWa**) Existing 12 750 300 Expected 22 2,416 1,631 Total 34 3,166 1,931 * Just includes plants available to generate and sell power ** Average generation in 6 months o

Slide 67: Brazilian hydroelectric power generation potential
Brazilian hydroelectric power generation potential Situation as of December 2010, MW Region State Operation Estimated Overall RR AC - 1,121 1,121 AP AM 250 19,648 19,898 AP 68 1,938 2,006 North RO 3,549 9,342 12,891 RR 5 5,257 5,262 AM PA PA 8,500 40,900 49,400 MA CE RN TO 2,324 4,351 6,674 PB PI AL

Slide 68: Tapajós Complex
Tapajós Complex Location: Tapajós Basin, PARA State 5 Hydro Power Plants Installed Capacity: 10,682 MW Assured energy: 4,581 average MW (expected) Power Plant River Installed Assured Start-up Capacity Energy -MW Avg MW São Luiz do Tapajós Tapajós 6,133 3,369 2016 Cachoeira do Caí Tapajós 802

Slide 69: Teles Pires Complex
Teles Pires Complex Location: Teles Pires Basin, Mato Grosso State 3 Hydro Power Plants Installed Capacity: 3,027 MW Power Plant River Installed Assured Start-up Capacity -MW Energy Date Avg MW Teles Pires Teles Pires 1,820 915 2015 São Manuel Teles Pires 746 400 2015 Sinop Teles Pires 461 227

Slide 70: Santo Antônio hydro plant – basic information
Santo Antônio hydro plant – basic information • 3,150 MW of installed capacity • 2,218 MWAverage of energy > Capacity Factor (CF) of 69%; • Price: R$78.87/MWh (equivalent to R$99/MWh for a traditional 55% CF Hydro Power in Brazil) • Winner consortium: – 10% Cemig – 39% Furnas – 20% FIP (Investment F

Slide 71: Santo Antônio hydro plant – basic information
Santo Antônio hydro plant – basic information • Low-fall plant (13.9 m), average estimated flow 568 m3/s, lake 271 km2, resulting in lower ratio between reservoir area and total energy generated than in other Amazon region plants: index of 0.09 – Balbina ( 250 MW, 2,360 km2 reservoir): index 9.44 –

Slide 72: Belo Monte hydro plant – basic information
Belo Monte hydro plant – basic information • Concession period: 35 years • 11,233 MW of installed capacity • Assured energy: 4,571MW average • 516 km2 reservoir • Ratio between reservoir area and total energy generated: 0.04 km2 /MW • Estimated cost of the project: R$ 25.8 billion 72

Slide 73: Wind power potential in Minas Gerais
Wind power potential in Minas Gerais Cemig is one of the pioneer companies in terms of wind generation in Brazil through the Morro do Camelinho plant, which was connected to the grid in 1992. Wind power map of Brazil: Brazil has a theoretical wind power generation potential of 143.5 GW, estimated at

Slide 74: Power Transmission Capacity (Km)
Power Transmission Capacity (Km) 2006 2007 2008 2009 2010 2011 2Q2012 >525-Kv lines 0 0 51 77 101 127 127 500-kV lines 2.592 2.488 2.788 3.594 4.421 4.421 5.284 345-kV lines 1.969 2.001 2.001 2.167 2.358 2.358 2.248 230-kV lines 803 824 915 1.668 1.888 1.888 2.401 Total 5.364 5.313 5.755 7.506 8.768

Slide 75: Transmission: Present all over Brazil
Transmission: Present all over Brazil ETEP and ERTE NOVATRANS Cemig is now Brazil’s third EATE and ENTE GTESA largest transmission group: Total lines: 10,060Km PATESA RN Consolidated Permitted MA PA PE Annual Revenue (RAP-2010): PI PB R$1.7 billion, including TO AL SE Transchile MT BA MT MUNIR

Slide 76: Transmission: Present all over Brazil
Transmission: Present all over Brazil Values of RAP (Permitted Annual Revenue) Specified by Aneel Homologating Resolution Nº 1313* In Cemig Cemig % Company RAP Consolidated Cemig GT interest * Permitted Annual Revenue in effect from July 1, result Taesa 43,0% 638.566.429 2012 to June 30, 2013. ETEO

Slide 77: Start up in Chile: First international step
Start up in Chile: First international step Charrúa–Nueva Temuco Transmission Line Chile •Voltage: 2x 220kV •Length: 205 km •Concession period: 20 years •Stake: 49% •Total investment: US$88 million •Annual Revenue: US$65 million Transchile •Financing: 63% of the investment •Capital from Cemig : U$20

Slide 78: Power Transmission auctions
Power Transmission auctions Auctions 2012 June, 11th Auction 007/2012 9 lots totaling 700 Km of lines 4,269 km of transmission lines, in 8 lots, representing These assets will be built in 7 states maximum RAP of R$ 501.3 million 30 years contracts and estimated total capex of R$700 million Principal

Slide 79: The 1st Transmission Tariff Review
The 1st Transmission Tariff Review This cyclical review is related just with old assets hold by Cemig GT • Taesa and TBE are not entitled to this type of review The criteria of this Tariff Review were set by Aneel Normative Resolution 257/07, the principal ones being: a. WACC: 9.18% p.a. b. Operat

Slide 80: Electricity Distribution Capacity
Electricity Distribution Capacity Network in km 2008 2009 2010 2011 2Q2012 SUB-TRANSMISSION 16.810 16.959 17.096 17.367 17.594 161-kV lines 55 55 55 55 55 138-kV lines 11.254 11.442 11.491 11.749 12.084 69-kV lines 4.535 4.508 4.595 4.608 4.498 Lines below 69 kV 966 954 955 955 957 DISTRIBUTION 442.

Slide 81: Cemig D: sales by category in 2011
Cemig D: sales by category in 2011 81

Slide 82: Electricity Distribution tariff review
Electricity Distribution tariff review • Allowed return on asset approach: – Benchmark WACC: was 11.26% in 1st cycle (2003) – Tariff review: WACC of 9.95% in 2nd cycle (2008) • New Tariff Review methodology: – Reference company model disclosed: – Black box opened. – Asset base review every 10 years

Slide 83: Cemig D 2009 readjustment and Impact on Tariff
Cemig D 2009 readjustment and Impact on Tariff 2009 IMPACT to CONSUMERS Financial Components 2008 + CVA R$ 442.300.746 Financial Components + CVA ANEX II (IRT) R$ 682.427.357 REQUIRED Appendix Appendix Appendix REVENUE I I VERIFIED II REVENUE Appendix R$ 7.622.802.110 II R$ 6.124.630.949 Appendix I:

Slide 84: Cemig D 2010 readjustment and Impact on Tariff
Cemig D 2010 readjustment and Impact on Tariff 2010 IMPACT to CONSUMERS Financial Components 2009 + CVA R$ 332,792,812 Financial Components + CVA ANEX II (IRT) R$ 442,300,746 REQUIRED Appendix I Appendix Appendix REVENUE I VERIFIED II REVENUE Appendix R$ 7,974,659,463 II R$ 7,622,802,110 Appendix I:

Slide 85: 1st Tariff Review 2003 vs 2nd Tariff Review 2008/2009
1st Tariff Review 2003 vs 2nd Tariff Review 2008/2009 2nd Tariff Review 2009 1st Tariff Review 2003 2nd Tariff Review 2008 Final • Regulatory Ebitda • Regulatory Ebitda • Regulatory Ebitda Margin: 21.2% Margin: 21% Margin: 21% • Losses coverage: • Losses coverage: • Losses coverage: inadequate suffi

Slide 86: Aneel's Proposal for the 3rd Cycle: WACC
Aneel’s Proposal for the 3rd Cycle: WACC Regulatory Proposal WACC 2nd Cycle ( Final) 3rd Cycle (Aneel’s Proposal) Debt Cost of Debt (Rd) 14.97% 11.50% Taxes (t) 34.00% 34.00% Debt-to-Capital (D/D+E) 57.16% 60.00% WAC of debt 5.65% 4.55% Equity Risk free Rate (Rf) 5.32% 4.96% Market Premium (Rm – Rf)

Slide 87: Aneel's Proposal for the 3rd Cycle: Main Changes
Aneel’s Proposal for the 3rd Cycle: Main Changes Opex: • Two stages: o Reference Company model of the 2nd Cycle (2008) adjusted to inflation and productivity gains and sales volume increase – First Stage o Benchmarking with peers in order to verify Stage 1 and produce component (T) – Second Stage;

Slide 88: Aneel's Proposal for the 3rd Cycle: Main Changes
Aneel’s Proposal for the 3rd Cycle: Main Changes Energy Losses: Regulatory energy losses will be defined according to the complexity of each concession area • Companies ranked and then grouped. In a ranking from more to less complexity, to deal with electricity losses, Cemig was considered 24th an

Slide 89: Natural Gas Distribution - Gasmig
Natural Gas Distribution - Gasmig 89

Slide 90: Natural Gas Expansion: Cemig's consortium wins Brazilian Oil and Gas Bids
Natural Gas Expantion: Cemig´s consortium wins Brazilian Oil and Gas Bids in December 2008 Strategic initiative seeks means to ensure supply of natural gas for distribution, through Gasmig, and for thermal power generation Consortium Structure Winning Bid Cemig´s stake in the consortium of 24.5%

Slide 91: Agenda
Agenda •Background •Strategy Overview •Business Outlook •Acquisitions •Results •Market Recognition •Regulatory Framework •Others 91

Slide 92: Acquisition of Brookfield's shares in TBE (Transmission)
Acquisition of Brookfield’s shares in TBE (Transmission) In 2006 Cemig acquired a Stake in TBE Cemig increased its stake in TBE: R$505M paid in 2009 Stakes before the acquisition EATE ECTE ENTE ERTE ETEP CEMIG 17.68% 7.50% 18.35% 18.35% 19.67% Eletrobrás 29.30% 0% 0% 0% 21.33% Other partners 53.

Slide 93: Description of TBE – Power transmission group
Description of TBE – Power transmission group Length Company Line/Substation Capacity(kV) Start-up (Km) EATE Tucuruí (PA) a Presidente Dutra (MA) 927 500 mar/03 ECTE Blumenau (SC) a Campos Novos (SC) 253 525 mar/02 ENTE Tucuruí (PA) a Açailândia (MA) 458 500 fev/05 ERTE Vila do Conde (PA) a Santa Ma

Slide 94: Acquisition of holdings in wind farms: The Transaction
Acquisition of holdings in wind farms: The Transaction Resulting stockholding structure The Transaction • Acquisition of 49% stockholdings in three wind farms (99.6MW) in the Brazilian State of Ceará, currently owned by Energimp S.A. (IMPSA). • Price paid for the shares: R$ 223 million, to be paid (

Slide 95: Acquisition of holdings in wind farms: The Assets
Acquisition of holdings in wind farms: The Assets Locations Volta do Rio Wind Power Plant Volta do Rio Morgado • Location: Acaraú (240km from Fortaleza), Ceará Fortaleza • Equipment: 28 rotors of 1,500KW each Parajurú • Installed capacity: 42.0MW • Load factor : >45% • Energy contracted: 161.2GWh /

Slide 96: Terna (now named TAESA) acquisition - Transaction Summary
Terna (now named TAESA) acquisition - Transaction Summary Power Transmission Company with 3,753 km of lines in 11 Brazilian States Acquisition in partnership with Equity Investment Fund - FIP Coliseu Largest FIP created to invest in the Brazilian electricity sector: R$ 1.33 billion o Attractiv

Slide 97: FIP Coliseu: Efficient vehicle for growth in Transmission
FIP Coliseu: Efficient vehicle for growth in Transmission On November 4th, 2009, Cemig GT, jointly with FIP Coliseu, acquired 65.85% of Terna Participações S.A., through Transmissora do Atlântico de Energia Elétrica S.A. Atlântico was split, creating Transmissora Alterosa, which will be responsi

Slide 98: TAESA - Transmissora Aliança de Energia Elétrica S.A - Overview
TAESA - Transmissora Aliança de Energia Elétrica S.A - Overview Geographic Footprint Overview of Concessions Start-up Concession Line Date Term TSN abr-03 dez-30 GTESA jul-03 jan-32 PATESA mar-04 dez-32 Munirah nov-05 fev-34 Novatrans abr-04 dez-30 ETAU mai-05 dez-32 ETEO out-01 mai-30 under Brasnor

Slide 99: Distribution: Increasing stake in Light in 2010 creates new opportunities
Distribution: Increasing stake in Light in 2010 creates new opportunities A 13.03% stake was bought for R$172M in 2006 (with full payback in 2 years) Cemig D and Light represent almost 16% of electricity distributed in Brazil in 2008 • Tradition and experience in Light and Cemig brought closer •

Slide 100: Agenda
Agenda •Background •Strategy Overview •Business Outlook •Acquisitions •Results •Market Recognition •Regulatory Framework •Others 100

Slide 101: CAPEX Investment program
CAPEX(R$ Million) Investment program 2013 investments: being revised due to Provisional Measure 579 101

Slide 102: Large Growth in Cash Flow
Large Growth in Cash Flow Cash position provides flexibility to financial management 102

Slide 103: Consolidated net revenue
Consolidated net revenue Growth in net revenue reflects business diversification, and positive effects of acquisitions (RME/Light S.A., TAESA and TBE companies) Operating Revenues 3Q12 3Q11 Ch% 9M12 9M11 Ch% Sales to end consumers 4.167 3.821 9 12.296 10.975 12 TUSD 528 561 (6) 1.559 1.465 6 Suppl

Slide 104: Operating Expenses
Operating Expenses Operating Expenses 3Q12 3Q11 Ch% 9M12 9M11 Ch% Personnel/Administrators/Councillors 321 293 10 973 897 8 Forluz – Post-Retirement Employee Benefits 31 31 - 100 93 8 Materials 22 17 29 56 65 (14) Contracted Services 267 252 6 778 721 8 Purchased Energy 1.580 1.111 42 4.112 3.202 28

Slide 105: Consolidated operational expenses
Consolidated operational expenses 105

Slide 106: Expansion of consolidated net income in the year
Expansion of consolidated net income in the year Result shows growth consistent with solid fundamentals • Continuous improvement in operational margins • Diversification of the risk inherent to each business through integrated structure Statement of Results 3Q12 3Q11 Ch% 9M12 9M11 Ch% Net Revenue

Slide 107: Cemig Distribuição
Cemig Distribuição CEMIG D Market (GWh) GW Quarter Captive Consumers TUSD ENERGY1 T.E.D2 TUSD PICK3 2Q10 5.710 4.914 10.624 24 3Q10 5.841 5.047 10.888 25 4Q10 5.938 4.927 10.865 25 1Q11 6.034 4.797 10.831 25 2Q10 5.969 5.127 11.096 26 3Q11 6.166 5.274 11.441 24 4Q11 6.093 5.149 11.242 26 1ºQ12 5.970

Slide 108: Cemig Geração e Transmissão
Cemig Geração e Transmissão Statement of Results 3Q12 3Q11 Ch% 9M12 9M11 Ch% Net Revenue 1.480.602 1.297.129 14% 3.931.244 3.351.586 0 Operating Expenses 579.759 518.238 12% 1.625.133 1.474.488 0 EBIT 900.843 778.891 16% 2.306.111 1.877.098 0 Gain on issuance of shares 253.538 - - 253.538 - - EBITDA

Slide 109: Agenda
Agenda •Background •Strategy Overview •Business Outlook •Acquisitions •Results •Market Recognition •Regulatory Framework •Others 109

Slide 110: Market Recognition
Market Recognition Included in the DJSI for the 11th year running. Included in Bovespa Corporate Sustainability Index. Included in The Global Dow Index as the only Latin American electricity company in this 150-company index, and one of the 10 selected to represent emerging markets. Prêmio Anefac Tr

Slide 111: Appendix
Appendix •Regulatory Framework •Others 111

Slide 112: Power Generators are the most exposed to risks
Power Generators are the most exposed to risks • Regulated market – Concessions granted based on the least price approach. – Power purchase contract: • Auctions organized by a Federal agency: – Final buyer : Electricity Distributors. • New capacity : longer term, no market risk, inflation adjusted;

Slide 113: Power Generation Price Trend
Power Generation Price Trend • Price will behave differently according to the nature of the contract to be auctioned by ANEEL: – Existing capacity (so called “old energy”) contracts: • power to be supplied in a year from now; • Term of 8 years; (can be from 3 to 15 years) • Imply distributor ‘s fore

Slide 114: Brazil's electricity markets
Brazil’s electricity markets Generation • Wholesale prices resulting • Freely negotiated wholesale from auctions prices Distribution Companies Regulated Market Free Market Free Consumers Special Consumers (“ACR”) (“ACL”) Traders Generators Co-existence of two markets: competitive, and regulated 114

Slide 115: Types of contracting in the Regulated Market
Types of contracting in the Regulated Market A–5 A–3 A–1 Adjustment Local Generation New New Energy Existing Auctions Auctions (Distribution Energy Auctions Generation Company Option) Auctions Auctions Objective Expansion Expansion Existing load Adjustment of Existing load current situation Duration

Slide 116: Reserve Auctions
Reserve Auctions Objective: To further increase the security of the System by diversifying supply sources Energy sources: So far specific auctions for Small Hydro Plants (“PCHs”) and plants generating from wind energy and biomass. Contract periods: • Hydro: 30 years • Biomass:15 years • Wind:

Slide 117: Brazilian generation market – 2011
Brazilian generation market – 2011 (% of total installed capacity) Others; 24% Brazil’s installed capacity: 116,657MW (December, 2011) Source: ANEEL, Cemig 117

Slide 118: Brazilian transmission market – 2011
Brazilian transmission market – 2011 (% of Permitted Annual Revenue (RAP)) Others; 4% Total Permitted Annual Revenue : R$ 12.6 billion (11/07 to 12/06) Source: ANEEL, Cemig 118

Slide 119: Transmission regulation is the most successful one
Transmission regulation is the most successful one • Competition for concession contract: – Cap price approach: annual permitted revenue; – Allowed revenue: the winner bid is the lowest revenue earned from users; – 30-year long concession. • Stable Cash flow – Guaranteed contracts signed with users:

Slide 120: Transmission network expansion
Transmission network expansion • Facilities built before 1995: – Concession will expire on July 8, 2015; – 20-year extension may be granted at ANEEL discretion; – Allowed return to be reviewed every four years • Expansion projects can be carried out in three ways: – New concessions to be granted thr

Slide 121: Electricity Distribution: Brazil
Electricity Distribution: Brazil AES RR AP Ashmore Energy Main controlling MA Energisa (Cat-Leo) groups in Brazil CE RN Endesa AM PA PI PB EDP PE State-owned, Federal AC TO AL RO State-owned, Indiv. BA SE MT State Grupo Rede GO Equatorial Energia Brazil Numbers (2009) MG MS NeoEnergia ES Concessio

Slide 122: Brazilian distribution market – 2011
Brazilian distribution market – 2011 % of all electricity distributed to free and captive clients in Brazil) Others; 14% Total: 430,106 GWh Source: EPE, Cemig 122

Slide 123: Electricity Distribution business is the most regulated one
Electricity Distribution business is the most regulated one • Allowed return on asset approach: – Benchmark WACC: 9.95 (real) • Operating expenses: – Full passed through mechanism: – Energy purchase expenses under certain circumstances. – Yearly inflation adjusted; – Tracking account for offsetting

Slide 124: Electricity Distribution Tariff Review Process
Electricity Distribution Tariff Review Process PARAMETERS REVENUE FROM BILLING Special EXPENDITURES TO CONSUMERS Obligations + Reinstatement Depreciated Revenue Captive Consumers Depreciation Installment Residential Assets Rate Remuneration of 4.65% Accumulated Capital Total Assets Base Depreciation

Slide 125: Financial Statements Separated by Company
Financial Statements Separated by Company DEMONSTRAÇÕES SEGREGADAS POR EMPRESA EM 30 DE SETEMBRO DE 2012 ETEP, ENTE, ELIMINAÇÕES / DESCRIÇÃO HOLDING CEMIG - GT CEMIG-D LIGHT GASMIG CEMIG TELECOM SÁ CARVALHO ROSAL OUTRAS TOTAL ERTE, EATE, ECTE TRANSFERÊNCIAS ATIVO 16.012.281 16.265.199 11.818.850 2.9

Slide 126: Appendix
Appendix •Regulatory Framework •Others 126

Slide 127: Glossary
Glossary • Average outage frequency (FEC): Average number of outages suffered in a given period per consumer, in a given group of consumers. • Debt coverage index: Ebitda divided by total financial expenses in the year. This gives a figure for the company’s capacity to pay debt servicing. • Deferred

Slide 128: Glossary
Glossary • The CDE (Energy Development) Account: This is a source of subsidies to make alternative energy sources such as wind and biomass more competitive, and promote universalization of electricity services. It is funded by annual payments made by the concession holders for the use of public asse

Slide 129: Investor Relations
Investor Relations Telefone: (55-31) 3506-5024 Fax: (55-31) 3506-5025 Email: [email protected] Website: http://ri.cemig.com.br 129 129

Slide 130: Notes
CMIG Notes 130

Slide 131: Notes
CMIG Notes 131
Source: Internet Archive copy of ri.cemig.com.br
More decks from Companhia Energetica de Minas Gerais SA
Cemig — Q3 2026 Earnings Presentation18 slides · Nov 13, 2026
Q3 2026 Earnings Presentation18 slides · Sep 30, 2026
Cemig — Q2 2026 Earnings Presentation17 slides · Aug 14, 2026
Q2 2026 Earnings Presentation17 slides · Aug 14, 2026
Energy Co of Minas Gerais — Q1 2026 Earnings Presentation25 slides · Jun 9, 2026
Cemig — Q1 2026 Earnings Presentation20 slides · May 8, 2026