Gmv Minerals Inc · TSXV:GMV

Gmv Minerals — Investor Presentation (October 2021)

23 slides from Gmv Minerals's investor presentation, October 2021

  1. Slide 1: On the Path to Arizona's Next Gold Mine

    TSXV: GMV | OTCQB: GMVMF | FSE: G3MN On the Path to Arizona’s Next Gold Mine October 2021

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement Information set forth in this presentation may contain forward-looking statements. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address a company's expected future business and financial

  3. Slide 3: Capital Structure

    Capital Structure As of June 21st 2021 TSX.V: GMV Stock Symbol OTCQB: GMVMF Shares Issued and Outstanding 69,679,540 Warrants 3,963,542 Options 5,905,000 Fully Diluted 79,548,082 Shareholder Breakdown Largest Shareholder Group 58% 7 shareholders own 35M of 60M shares I&O Retail 22% Management & Advi

  4. Slide 4: Investment Highlights

    Investment Highlights 1. High Quality Gold Asset: Focused on developing the 100% owned Mexican Hat Gold Project in S.E. Arizona 2. Positive Preliminary Economic Assessment: November 2020: Reports 10-year mine life, low CAPEX & very strong NPV 3. Developing Ounces-in-the-Ground: Mexican Hat: USD$153

  5. Slide 5: Mexican Hat Project

    Mexican Hat Project Arizona, USA

  6. Slide 6: Mexican Hat

    Mexican Hat Project Overview ✓ The project spans ~5,000 acres, forming one of the most promising gold development opportunities in the western USA ✓ The project is a low sulphidation, structurally controlled epithermal gold deposit ✓ Primary mineralization consists of oxides with gold in a metasomat

  7. Slide 7: Mexican Hat PEA Highlights

    Mexican Hat PEA Highlights November 2020 Pre-tax and at USD$1,600 oz/year price TSXV: GMV | OTCQB: GMVMF | FSE: G3MN 7

  8. Slide 8: PEA Summary

    PEA Summary: ✓ Current mine life of 10 years with a 1-year pre- production period – OPEN TO EXPANSION ✓ Life of mine (LOM) head grade of 0.58 g/t gold ✓ Low LOM Strip Ratio of 1.87 ✓ Average Annual Gold Production of 52,250 ounces ✓ Base case: USD$1,600 oz gold ✓ Pre-tax IRR-39.4% Payback-2.8 years

  9. Slide 9: PEA Price Sensitivity Table

    PEA Price Sensitivity Table USD $1,900 USD $2,100 Post Tax Pre Tax Post Tax Pre Tax IRR 44.50% IRR 58.50% IRR 53.6% IRR 70.0% *NPV 0% $ 264,330 *NPV 0% $ 375,720 *NPV 0% $ 338,128 *NPV 0% $ 478,713 -5% $ 182,492 -5% $ 265,668 -5% $ 237,204 -5% $ 342,041 -8% $ 146,778 -8% $ 217,612 -8% $ 193,177 -8%

  10. Slide 10: GMV Valuation Vs Peers

    GMV Valuation Vs Peers TSXV: GMV | OTCQB: GMVMF | FSE: G3MN 10

  11. Slide 11: Mexican Hat Constrained Pits

    Mexican Hat Constrained Pits • Mexican Hat Mine development envisions two pits. • The southeast pit will be mined first, followed by the larger pit to the north. TSXV: GMV | OTCQB: GMVMF | FSE: G3MN 11

  12. Slide 12: Cross Section of Deposit

    Cross Section of Deposit • Section 30/90 of Mexican Hat Deposit showing all drill holes with assays • 2021 planned drill holes marked in green TSXV: GMV | OTCQB: GMVMF | FSE: G3MN 12

  13. Slide 13: Current Resource Estimate

    Current Resource Estimate An updated Mineral Resource Estimate prepared by Tetra Tech Inc. (Tetra Tech) and DRW Geological Consultants Ltd. with an effective date of June 22, 2020 was used in the PEA. Category Cut-off (g/t Au) Grade (Au, g/t) Tonnes Gold Oz Strip Ratio Inferred 0.20 0.58 36,733,000

  14. Slide 14: Infrastructure & Permitting

    Infrastructure & Permitting ✓ Paved road access from Old Ghost Town Road ✓ The Courtland-Pearce, Ghost Town Trail Road extends along the western project area along with an active power line ✓ Cochise power plant (Apache) located 30 miles from Mexican Hat Project Arizona, USA ✓ Water accessibility fr

  15. Slide 15: Mexican Hat Timeline – 2021

    Mexican Hat Timeline – 2021 Q1 Q2 Q3 Q4 Baseline Studies Continue water sampling, plus update of hydrologic, cultural, and environmental studies for permitting Expansion Drilling 12 drill holes, 3,000m Conversion Drilling 30-35 drill holes, 7,000m of In-fill drilling to convert inferred mineralizati

  16. Slide 16: Expansion Drill Program

    Expansion Drill Program ✓ Q2 2021 – 12 drill holes 3,000 metres includes North and Southeast drilling ✓ Significant exploration potential exists along strike and down dip on the principal controlling structure outside of the current resource area ✓ Specific portions of this arcuate fault that can be

  17. Slide 17: Conversion Drill Program

    Conversion Drill Program A total of up to 38 diamond drill holes are designed to provide full coverage of the entire Mexican Hat deposit at 100 m +/- centers. This will: • Assist in the QA/QC of the historic drill results by twining or near twinning a large number of holes enabling conversion of som

  18. Slide 18: Board & Management

    Board & Management Management Board of Directors Advisors Ian Klassen, B.A. (Hons.) Alistair MacLennan Dr. Roger Newell, Ph.D President & CEO Chairman (former Chief Geologist, Newmont Mining) Michele Pillon Ian Klassen, B.A. (Hons.) Chief Financial Officer President & CEO Joel Schneyer, M.S., M.A.,

  19. Slide 19: Investment Highlights

    Investment Highlights 100% interest in Mexican New PEA completed Over 688,000 ounces of Hat Gold Property in a 10-year mine life and gold in an Inferred Resource key, mining-friendly greatly reduced capex with updated resource jurisdiction of the USA calculation Excellent metallurgical Project is op

  20. Slide 20: President & CEO Ian Klassen

    President & CEO Ian Klassen, B.A. (Hons.) (604) 899-0106 [email protected] Head Office Suite 280-1090 WGeorgia St. Vancouver, BC. V6E 3V7 gmvminerals.com TSXV: GMV | OTCQB: GMVMF | FSE: G3MN 20

  21. Slide 21: Appendix

    Appendix

  22. Slide 22: Heap Leach Benefits

    Heap Leach Benefits ✓ Well established process ✓ Low capital investment and operating costs ✓ Fast payback ✓ No tailings disposal ✓ Lower energy and water requirements ✓ Viable in a wide range of climates ✓ Simple setup and operation 22

  23. Slide 23: Recovered Gold Grades of Selected Heap Leach Gold Mines

    Recovered Gold Grades of Selected Heap Leach Gold Mines TSXV: GMV | OTCQB: GMVMF | FSE: G3MN 23

GMV Minerals — Investor Presentation (October 2021) on 6ix