Slide 1: Japan Investor Meetings
Japan Investor Meetings February 16-17, 2011 1

Slide 2: Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995
“Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934. Although AEP and each of its Registrant Subsidiaries believe that their expectations are

Slide 3: American Electric Power
American Electric Power Generation owned11 (GW) Generation owned (GW) Southern 42.9 Serving electric customers in Co NextEra 11 states 42.7 Energy AEP 39.9 Duke 38.5 One of the largest Energy U.S. electricity generators Transmission miles11 (‘000s) Transmission miles (‘000s) AEP 39.0 Southern Co 27.

Slide 4: Traditional Ratemaking Environment
Traditional Ratemaking Environment Growth in Net PP&E Regulatory Framework Base Rates Net PP&E $40.0 ― Recovery of capital and financing % costs 7.4 G R = $37.2 ― Recovery of set level of O&M costs $35.0 CA $35.7 P &E $34.3 011P $33.0 $30.0 5-2 Recovery of Fuel Costs $ in billions 200 $29.9 $26.

Slide 5: Load Growth
Load Growth Commpound Annual Load Growth - 2006 - 2010 80 CAGR = 2.0% CAGR = 1.1% CAGR = -1.0% 70 64 65 62 59 59 58 60 60 57 57 2006 54 51 50 50 51 2007 TWh 49 50 2008 2009 40 2010 30 20 Residential Commercial Industrial 5

Slide 6: Highly Diversified Regulated Utility Platform
Highly Diversified Regulated Utility Platform 2010 On-Going Earnings 2010 Retail Load Contribution Public Service of Kentucky Southwestern Oklahoma Power 3% Wholesale * 10% Electric 6% Power 11% Residential Ohio Power 30% 24% Texas Industrial 8% 33% All Others Columbus 5% Southern Power Indiana & 17

Slide 7: Domestic Generation Fleet
Domestic Generation Fleet Generation Capacity by Fuel Type 2010 Generation Production by Fuel Type Based on 39,910 MW Based on 173.2 TWh Pumped Pumped Storage/Hydro/ Nuclear Storage/Hydro Wind/Solar 9.0% 0.5% Nuclear 7% 5% Nat. Gas/Oil 8.0% Nat. Gas/Oil 23% Coal/Lignite 65% Coal/Lignite 82.5% Genera

Slide 8: Emissions Reductions since 2000
Emissions Reductions since 2000 U.S. Power Plant SO2 Emissions AEP SO2 Emissions 11.2 10.6 10.2 10.6 10.3 10.2 1,020 997 9.4 924 937 in million U.S. tons 8.9 915 900 in thousand U.S. tons 853 7.6 749 55% 5.7 49% 638 reduction reduction 457 since 2000 since 2000 2000 2001 2002 2003 2004 2005 2006 200

Slide 9: The Pressure on Coal Generation
The Pressure on Coal Generation Key EPA Actions Pending Transport Rule – Proposed July 2010 All Coal Fired Power Plants Clean Air Transport Rule “Coal Ash” Rule – Proposed May 2010 Mo lat tal re Renewable Mandates ion ,T gis en Mercury and other Hazardous igh Le onm Pure Fundamentals Air Pollu

Slide 10: Carbon Capture and Storage
Carbon Capture and Storage PHASE I - Validation World’s first operating CCS facility on a coal fired power plant Gained competitive advantage through technology development Currently testing key performance parameters: auxiliary power, removal efficiency, reliability, CO2 product quality PHASE

Slide 11: Current/Proposed Transmission Projects
Current/Proposed Transmission Projects Pioneer MEC RITELine PATH Prairie Wind 11

Slide 12: Transmission as a Growth Engine
Transmission as a Growth Engine Cumulative Capital Spending, Electric Transmission Texas (ETT) After Ownership Division ($M) Annual Earnings Potential ($M) $7,000 $350 – Growing Rate Base High Case – $1.1B CREZ opportunity; Received $6,000 AEP Transco $300 CCN approval on one CREZ line; 3 PATH + P

Slide 13: Evolving Transmission Regulatory Policy
Evolving Transmission Regulatory Policy Transmission Framework Regulated by the Federal Energy Regulatory Commission Based on Cost of Service Formula Rate Treatment Reduces Regulatory Lag Costs Socialized Beyond Retail Customers Incentive ROEs available – particularly for technology enhanc

Slide 14: AEP's Smart Grid Deployment – Pilot Projects
AEP’s “Smart Grid” Deployment – Pilot Projects Indiana Michigan Power - South Bend Pilot AEP Ohio– central Ohio– (2009-2013) (Completed – September 2010) Awarded US DOE Smart Demonstration Project 10,000 AMI meters 133,000 meters using integrated mesh network Integrated Mesh communication ne

Slide 15: Earnings and Dividends
Earnings and Dividends On-Going EPS History Since 2004 Dividend History Since 2004 $/share $/share 3.60 2.00 3.40 .1% .0 % $1.84 = 4 1.80 4 R $3.24 = 3.20 C AG $3.10 G R $1.71 $3.00 $2.97 $3.03 A $1.64 $1.64 C $1.58 3.00 1.60 $2.77 $1.50 2.80 $2.73 $1.40 $1.42 2.60 1.40 $2.33 2.40 1.20 2.20 2.00 1.0

Slide 16: Capital Expenditures
Capital Expenditures $3,000 $2,900 $2,615 AEP Transco $2,487 $350 $2,500 $160 JV Equity $1 $47 $113 $280 Contributions, net $77 $2,243 $34 AEP River Ops & $50 $223 Other Non-Utility $457 $24 $56 Environm ental $2,000 $303 $319 $256 New Generation $ in millions $62 $263 $82 $133 Corporate/Other $1,50

Slide 17: Long-term EPS Growth Rate
Long-term EPS Growth Rate 4-6% EPS growth 2012-14 – Average annual capital spend between $2.9-3.4B Average Annual EPS Growth – Utility platform replacement capital defined over two periods of about $1.4B (annual depreciation) – Growth in rate base of $1.5-2.0B Period of 4-6% average per year, allo

Slide 18: AEP Highlights
AEP Highlights Premier Utility Platform Traditional and Effective Regulatory Relationships Energy Policy Initiatives Create Technology Deployment and Investment Opportunity Strong Value and Total Return Proposition Mountaineer Plant (WV) 18
Source: Internet Archive copy of test22.aep.com
More decks from American Electric Power Company, Inc.
Q3 2026 Earnings Presentation40 slides · Oct 28, 2026
Q3 2026 Earnings Presentation12 slides · Oct 28, 2026
Q2 2026 Earnings Presentation41 slides · Jul 30, 2026
Q2 2026 Earnings Presentation39 slides · Jul 30, 2026
Q2 2026 Earnings Presentation12 slides · Jun 30, 2026
Q1 2026 Earnings Presentation39 slides · May 5, 2026