Rex Energy Corporation

Rex Energy — Investor Presentation (April 2013)

39 slides from Rex Energy's investor presentation, Apr 23, 2013

  1. Slide 1: Rex Energy Corporate Presentation

    Exhibit 99.2 Rex Energy Corporate Presentation April 2013 Responsible Development of America’s Energy Resources Rex Energy Corporation | 476 Rolling Ridge Drive | State College, PA 16801 P: (814) 278-7267 | F: (814) 278-7286 E: [email protected] www.rexenergy.com

  2. Slide 2: Forward Looking Statements and Presentation of Information

    Forward Looking Statements and Presentation of Information Forward-Looking Statements Statements in thispresentationthatarenothistorical factsare“forward-looking statements”withinthemeaningofSection27AoftheSecurities Actof 1933,asamended,andSection21Eof the Securities Exchange Act of 1934, as amende

  3. Slide 3: Estimates Used in This Presentation

    Estimates Used in This Presentation Hydrocarbon Volumes The SEC permitspublicly-reporting oil and gas companiesto disclose“provedreserves”in their filingswith the SEC. “Provedreserves”are estimatesthat geologicaland engineering datademonstrate withreasonable certaintyto be recoverable in futureyears

  4. Slide 4: Developing Liquids-Rich Asset Base

    Developing Liquids-Rich Asset Base Focused on developing our liquids-rich acreage in the Appalachian and Illinois Basins • Appalachian Basin:Targetingwetgaswindows inthePennsylvaniaMarcellusandOhioUticaShales • Illinois Basin: Conventional infill and enhanced oil recovery activity; 100% oil producti

  5. Slide 5: Operational Highlights

    Operational Highlights Maximizing Resource Potential • Large resource base with ~ 900 potential drilling locations focused in the Appalachian with an estimated 5.0 Tcfe of net resource potential (assuming full ethane recovery) • Exposure to emerging oil play in the Illinois Basin • Strong dry gas ec

  6. Slide 6: Financial Highlights

    Financial Highlights Strong Balance Sheet • Entered 2013 with ~$284 million of liquidity; Pro forma liquidity $344 million including March 2013 redetermination Active Hedging Program • For 2013, approximately 97% of natural gas hedged with $4.29 floor; 97% of 2013 oil production hedged with $88.46 f

  7. Slide 7: Growing Proved Reserves Through the Drill Bit

    Growing Proved Reserves Through the Drill Bit Proved Reserves Growth (Bcfe) 700 618.1 600 500 400 366.2 300 201.7 200 125.2 100 66.0 0 2008 2009 2010 2011 2012 Oil and NGLs Natural Gas Proved Reserves PV-10 Year (2) % Proved Developed Drill-Bit F&D ($/Mcfe) All-In F&D ($/Mcfe) (Bcfe) (Millions) (1)

  8. Slide 8: Proved Reserve Summary

    Proved Reserve Summary 12/31/12 Proved Reserves and PV-10 (1) Oil NGL Gas Total SEC PV-10 NYMEX PV-10 Reserve Category MMbbl MMbbl Bcf MMBoe $MM $MM PDP 8.4 10.1 138.7 249.4 $417.7 $505.8 PDNP 0.8 0.1 3.0 8.5 12.0 10.2 Proved Developed 9.2 10.1 141.7 257.9 $429.7 $516.0 PUD 0.2 21.5 230.0 360.1 70.8

  9. Slide 9: Liquids-Rich Non-Proven Resource Potential

    (1) Liquids-Rich Non-Proven Resource Potential We have identified approximately ~900 gross potential non-proven proved and drilling locations in our liquids-rich Appalachian Basin properties Additional oilresourcepotentialthroughourIllinoisBasinASPdevelopment andconventional infill/ recompletion pro

  10. Slide 10: 2013 Capital Budget Program

    2013 Capital Budget Program Budgeted $255-275 million of operating capital expenditures for 2013 ~86% of 2013 Budget Directed Towards Liquids-Rich Areas In Appalachia Basin, 2 operated rigs running with 30 wells planned; in Illinois Basin, 1 rig with 28 wells planned Expected Production Growth: 34%-

  11. Slide 11: Consistent Production Growth

    Consistent Production Growth (1) 61% CAGR ; Q1 2013 production ~ 29% liquids MarkWest Bluestone Plant Addition field compression 1st Sarsen plant starts in Butler Country (1) Based on the CAGR in annual production from 2009 to 2012.. 11

  12. Slide 12: Butler Operated Area Midstream Capacity

    Butler Operated Area Midstream Capacity MWE –Sarsen & MarkWest Y-Grade Pipeline Bluestone Processing MarkWest Energy Keystone - Processing Complex Complex Sarsen 40 MMcf/d In Service Bluestone I 50 MMcf/d In Service Bluestone II 120 MMcf/d 2Q14 NGL Pipeline 1Q14 REXX Butler Operated Acreage Mariner

  13. Slide 13: Ohio Utica Midstream Providers

    Ohio Utica Midstream Providers Mariner West MarkWest EnergyCadiz - Processing Complex Pipeline Interim Refrigeration 60 MMcf/d In Service Cadiz I 125 MMcf/d 2Q13 REXX Carroll Cadiz II 200 MMcf/d 2Q14 County Acreage Blue Racer East Initial Truck/Rail Loading 3Q13 Ohio Pipeline NGL Pipeline Mid-2013 M

  14. Slide 14: 2013 Hedging Summary

    1 2013 Hedging Summary 100% $88.46 X $96.46 $4.29 X $4.51 61% of Total NGL Volumes Hedged 90% $5.00 80% $80.63 X ~ 32% of all NGL components $102.36 $2.11 hedged at $55.36/Bbl 70% $4.51 X $5.34 $1.66 60% $0.98 $93.02 50% 40% $3.87 30% $1.58 20% 10% 97% 97% 79% 65%4 32%4 64%4 0% 2 3 Oil (/bbl) Gas (/

  15. Slide 15: Butler Operated Area

    Butler Operated Area Overview Butler Operated Area (70% WI) ~69,400 gross / ~48,400 net acres in Butler, Beaver and Lawrence counties Grubbs 2H Burgh 2HD ~57wells producing from the wet gas window of the Marcellus Shale Perry 1HD Plesniak Pad (3H, (1) through improved “Super-frac (2)” well 9H) Incre

  16. Slide 16: Super-Rich Wet Gas Upside

    (1) Super-Rich Wet Gas Upside $7.00 $6.48 $0.27 $6.00 $5.36 $5.00 $2.61 $1.76 $4.00 $4.00 $3.00 $4.00 $2.00 $3.60 $3.60 $1.00 $0.00 Dry Gas 1,250 BTU 1,300 BTU Gas NGLs Condensate Assumptions: $4.00 HH, $90.00 WTI, 50% WTI for NGLS; $80.00 condensate. 1,250 BTU: ~1.6 GPM. 1,300 BTU: ~2.4 GPM. 10 Bbl

  17. Slide 17: Evolution of Butler Marcellus Development

    Evolution of Butler Marcellus Development Improving welldesignsareresulting EURs(1) andreturnsoncapital inincreased Ethane Uplift and Improving Well Design Transportation Efficiencies ~ 9.7 Bcfe 4.0 Bcfe EUR 5.3 Bcfe EUR ~ 7.0 Bcfe EUR EUR(2,3) Year-End 2010 Year-End 2011 Year-End 2012 Pro Forma Pro

  18. Slide 18: Butler County Marcellus Economics

    Butler County Marcellus Economics Butler Area (Operated) Assumptions Butler County Wet Gas Type Curve 7,000 Super-frac completion method yields attractive IRRs 6,000 in current price environment 5,000 4,000 3,000 (1) ~7 Bcfe EUR without Ethane 2,000 1,000 0 Enhanced IRRs with full Ethane Recovery, 0

  19. Slide 19: Ohio Utica – Warrior North Prospect

    Ohio UticaWarrior – North Prospect Overview Warrior North Prospect ~16,100 gross / ~15,900 net acres in Carroll County, OH (100% WI) CHK Coniglio 6H: 1.1 Mboe/d First well, Brace #1H, into sales in Q3 2012 REXX G. Graham 1H, 1,094 boe/d 24-hour sales rate REXX Brace 1H 2H Micro-seismic confirms“Supe

  20. Slide 20: Ohio Utica – Warrior South Prospect

    Ohio UticaWarrior – South Prospect Overview Warrior South Prospect ~6,700 gross / ~4,100 net acres in Guernsey, Noble and Belmont GPOR –Ryser 1-25H: Rate of 2.9 Mboe/d; Counties, OH (63% WI) 73% Liquids Joint Development Agreement with MFC Drilling and ABARTA GPOR –Clay 1-4H: Oil & Gas Co. Rate of 2

  21. Slide 21: Warrior South Industry Results Comparison

    Warrior South Industry Results Comparison > 65% Liquids Lateral Shrink Gas Oil NGL Boe/d (Full Ethane Boe/d assuming Company Well Name (feet) BTU % (Mcf/d) (Bbls/d) (Bbls/d) Recovery) % Liquids 3,500’Lateral* GPOR Groh 1-12H 5,414 1,247 18% 2,296 1,186 367 1,935 80% 1,251 Onega Commissioners PDCE 3,

  22. Slide 22: Illinois Basin Overview

    Illinois Basin Overview Illinois Basin Overview (1) NetAcres ~27,000 Rex Energy is one of the largest producers in the ProvedReserves (2) (MMBoe) 9.2 (2) basin, producing approximately 2,179 net Bbls/d of oil Lawrence Field PV-10($MM) $222.2 (2) %Oil 100.0% ~27,000 net acres %Developed (2) 99.6% (1)

  23. Slide 23: Marcellus Non-Operated Overview

    Marcellus Non-Operated Overview Overview Marcellus Non-Operated Sizeable acreage position with ~44,400 gross / ~16,900 net acres(1) in Westmoreland, Clearfield and Centre Counties, PA Westmoreland County: ~6 Bcf(2);EUR attractive economics at $4.00 / MMcfe Clearfield-Centre County Non- Operated Area

  24. Slide 24: Lawrence Field

    Lawrence Field Implementing ASP flood operations in Lawrence field Lawrence Field ASP acreage in Lawrence County, IL Middagh Pilot Perkins-Smith Middagh Pilot 58 Acres 15 Acres Oil cuts in the Pilot increased from 1.0% to ~12.0% in total unit, with individual wells experiencing oil cuts above 20% Pe

  25. Slide 25: Appendix

    Appendix Responsible Development of America’s Energy Resources

  26. Slide 26: First Quarter and Full Year 2013 Guidance

    First Quarter and Full Year 2013 Guidance First Quarter Full Year 2013 2013 Average Daily Production 71.5 –73.5 MMcfe/d 90.5 –94.5 Mmcfe/d Lease Operating Expense $13.0 –$14.5 million $58.0 –$62.0 million Cash G&A $5.8 –$6.8 million $26.0 –$29.0 million Capital Expenditures N/A $230.0 $250.0 - milli

  27. Slide 27: Butler Operated Area Stacked Pays

    Butler Operated Area Stacked Pays Stratigraphic Column 2012 2013 Rhinestreet Shale • Frac one legacy vertical well to test gas quality and• No planned drilling in 2013 given Marcellus / Burkett liquids potential development Reservoir 4 200’thick (4,500’to 5,800’ deep) Burkett Shale • Drilled 4 locat

  28. Slide 28: Marcellus Super Frac Completion Optimization Process

    Marcellus “Super Frac” Completion Optimization Process Drushel 3H (150 ft design) “Super Frac”: • Job Performed: Apr. 2011; On Prod: 680 Days Lateral Spacing: 450 600- feet apart • Lateral Length: 3,000’ ; 21 Stages Type curve validates lower initial first year decline Behm 1H (150 ft design) “Super

  29. Slide 29: Marcellus Non-Operated Overview

    Marcellus Non-Operated Overview • Sizeable acreage position with 44,400 gross / 16,900 1 netacresinWestmoreland, Clearfield andCentre Marcellus Non-Operated Counties, PA 2 • Westmoreland County:~6BcfEUR; attractive economics at $4.00/ MMcfe • Clearfield-Centre Counties: 12,200 gross acre block: 6,50

  30. Slide 30: Westmoreland County Marcellus Economics

    Westmoreland County Marcellus Economics Westmoreland County Dry Gas Type Curve Westmoreland County (Non-Operated) 5,000 4,500 Assumptions 4,000 3,500 • Well costs of ~$5.8 million per well 3,000 • Lateral length of 3,500 ft. 2,500 2,000 • EUR of ~6.0 Bcf per well 1,500 • As of year end 2012 reserves

  31. Slide 31: Liquids Production Ratios

    Liquids Production Ratios Current Liquids Sales Ratio Liquids Sales Ratio With Full Ethane Sales Natural Iso-Butane Gasoline Butane 3% 7% Ethane 5% Natural 10% Gasoline 18% Iso- Butane 7% Propane 18% Butane Propane Ethane 15% 50% 67% ~1.6 Gallons per ~4.7 Gallons per Wellhead Mcf Wellhead Mcf 31

  32. Slide 32: 2013 Hedging Summary

    2013 Hedging Summary (1) 100% Puts Collars 49% of Total NGL Volumes Hedged Swaps 80% 78% 68% $5.00 ~ 26% of all NGL components hedged at $55.36/Bbl 64% 60% $103.00 $5.34 - $2.11 52% - 51% $79.45 $4.51 $1.66 $0.98 40% $93.02 $4.06 26% 20% $1.58 0% 2013 Oil 2013 Gas 2013 C5+ 2013 Isobutane 2013 Butane

  33. Slide 33: 2014 Hedging Summary

    2014 Hedging Summary (1) 80% Small amount of NGLs hedged in Puts 2014 (8,000 Bbls total) Collars Swaps 60% 60% 54% $90.00 $4.60 - 40% $3.87 $103.32 - 20% 85.01 $4.04 0% 2014 Oil 2014 Gas (2) (3) (/bbl) (/mcf) (1) Percentage hedged based on mid-point of Full Year 2013 production guidance with standar

  34. Slide 34: Current Hedging Summary

    Current Hedging Summary (1) Crude Oil 2Q13 3Q13 4Q13 1Q14 2Q14 3Q14 4Q14 Swap Contracts 120,000 120,000 120,000 -- -- -- -- Volume Hedged $ 93.02 $ 93.02 $ 93.02 -- -- -- -- Price Collar Contracts Volume Hedged 45,000 60,000 60,000 15,000 15,000 15,000 15,000 Ceiling $ 104.33 $ 102.50 $ 102.50 $ 97.

  35. Slide 35: Current Hedging Summary (Cont'd)

    Current Hedging Summary (Cont’d) (1) Natural Gas Hedges 2Q13 3Q13 4Q13 1Q14 2Q14 3Q14 4Q14 Swap Contracts (2) Volume 1,930,000 2,130,000 2,130,000 1,410,000 1,110,000 1,110,000 1,110,000 Price $ 3.85 $ 3.88 $ 3.88 $ 3.96 $ 3.96 $ 3.96 $ 3.96 Collar Contracts Volume 840,000 840,000 840,000 450,000 45

  36. Slide 36: Current Hedging Summary (Cont'd)

    Current Hedging Summary (Cont’d) (1)(2) Natural Gas Liquids 2Q13 3Q13 4Q13 Swap Contracts Propane Volume Hedged (Bbls) 33,000 33,000 33,000 Price per Barrel $ 42.42 $ 42.42 $ 42.42 Price per Gallon $ 1.01 $ 1.01 $ 1.01 Butane Volume Hedged (Bbls) 6,000 6,000 6,000 Price per Barrel $ 66.36 $ 66.36 $

  37. Slide 37: PV-10 Reconciliation

    PV-10 Reconciliation The following table presents a reconciliation of Rex Energy’s PV-10 to its standardized measure of discounted future net cash flows as of December 31, 2012: ($ in thousands) Standardized Measure of Discounted Future Net Cash Flows $ 396,123 Discounted FutureCashFlows from Income

  38. Slide 38: Finding & Development Cost Reconciliation

    Finding & Development Cost Reconciliation December 31, 2010December 31, 2011December 31, 2012 Drill-Bit Capital Deployed $76.3 $192.8 $176.9 Acreage Acquisitions 70.7 78.7 51.0 Equity Method Investments, Noncontrolling Interests and Other 17.5 30.9 11.0 All-In Capital Deployed $164.5 $302.4 $238.9 D

  39. Slide 39: Non-GAAP Financial Measures

    Non-GAAP Financial Measures “EBITDAX” means, for any period, the sum of net income for such period plus the following expenses, charges or income to the extent deducted from or added to net income in such period: interest, income taxes, DD&A, unrealized losses from financial derivatives, the retroac

Rex Energy — Investor Presentation (April 2013) on 6ix