Slide 1: El Paso E&P Company Haynesville Field Trip
El Paso E&P Company Haynesville Field Trip October 15, 2009
Slide 2: Cautionary Statement Regarding Forward-Looking Statements
2 Cautionary Statement Regarding Forward-Looking Statements This presentation includes certain forward-looking statements and projections. The company has made every reasonable effort to ensure that the information and assumptions on which these statements and projections are based are current, reas
Slide 3: Our Purpose
3 Our Purpose El Paso Corporation provides natural gas and related energy products in a safe, efficient, and dependable manner
Slide 4: Our Vision & Values
4 the place to work the neighbor to have the company to own Our Vision & Values
Slide 5: El Paso Exploration & Production
El Paso Exploration & Production 5 Domestic Low to medium-risk repeatable plays 98% drilling success rate Growing unconventional inventory International 2 large development projects in Brazil Significant onshore exploration potential in Egypt with two recent S. Alamein discoveries Central Western Gu
Slide 6: El Paso Exploration & Production
El Paso Exploration & Production 6 Western Division Central Division Gulf Coast Division
Slide 7: Arklatex - Significant Resource, Consistent Production Growth
Arklatex-Significant Resource, Consistent Production Growth Value Upside: Haynesville Cotton Valley Horizontal Infill drilling Reduced costs 1,050 operated wells 175 MMcfe/d production 76% avg. WI 10+ years R/P 958 undeveloped locations* 1.3 Tcf of risked undeveloped resource* 2006 2007 2008 2009E E
Slide 8: Haynesville Overview
Haynesville Overview Excellent position in the heart of the play Results among best in industry Continuing to improve Resource and production potential is significant 8
Slide 9: Haynesville Formation
Haynesville Formation Interstate Pipelines ? Exploration & Production
Slide 10: Haynesville Shale Underlies Traditional Producing Horizons
LOWER CRETACEOUS TRAVIS PEAKE (HOSSTON) UPPER JURASSIC MIDDLE JURASSIC UPPER TRIASSIC LOUANN GR LOUARK GROUP COTTON VALLEY SANDTONE EAGLE MILLS WARNER LOUANN SALT SMACKOVER BUCKNER HAYNESVILLE "COTTON VALLEY" LIME HAYNESVILLE SHALE BOSSIER COTTON VALLEY SANDSTONE SCHULER HAYNESVILLE SHALE BOSSIER SH
Slide 11: Haynesville Shale - Targeting Right Interval
TOP OF HAYNESVILLE UPPER HAYNESVILLE MIDDLE HAYNESVILLE LOWER HAYNESVILLE POROSITY INDICITIVE OF A CARBONACEOUS SHALE WITH LOW CLAY CONTENT HAYNESVILLE LIME RESERVOIR PROPERTIES Horizontal drilling target zone (30') 150' - 300' GROSS THICKNESS BRITTLE SHALE WITH LOW CLAY CONTENT POROSITY: 8% - 18% 1
Slide 12: Sabine Uplift Area Haynesville Gross Isopach
SABINE UPLIFT AREA WITH COMPLEX GROWTH FAULTS HAYNESVILLE GROSS ISOPACH El Paso HSVL well El Paso lease position Current prospective area Other key properties: Gas content Rock properties Porosity Thickness Not Only Indicator of Performance Haynesville wells IP ^15 MMcfe/d 12
Slide 13: Excellent Haynesville Position
13 13 Excellent Haynesville Position Marion Red River Claiborne Webster Bossier Gregg Caddo Harrison Rusk Shelby Desoto Panola Bienville Haynesville Shale El Paso acreage El Paso horizontal Haynesville wells Current prospective area Haynesville wells IP ^15 MMcfe/d EP Program Statistics Net risked r
Slide 14: Greater Holly Haynesville Project
Greater Holly Haynesville Project Haynesville Wells EP Producing EP WO Completion EP Drilling Industry Wells Hamilton 12H#1 Miller Land 10H#1 A Greene 22H#1 Gamble 24H#1 Weathers 14H#1 JR Gamble 11H#1 AV Young 7H#1 Blake 10H#1 Ray Oden 35H#1 Fingerle 25H#1 EP MGMT 14H#1 Travis Lynch #4H Gamble 21H#1
Slide 15: Haynesville Shale Day IPs
Haynesville Shale 30 Day IPs 11 wells with 30 days or more production Optimizing completion performance 15
Slide 16: Haynesville Shale Production Growth
Haynesville Shale Production Growth 16 Rigs 1 1 2 2 2 3 3 3 5 5 5 5 Gross Actual Volumes Forecasted Gross Volumes Range 6 new wells on line by year end Net volumes ~ 60%-65% of gross Volumes to increase sharply by year-end
Slide 17: Haynesville Improved Performance
17 Haynesville Improved Performance 17 First 3 wells Mid 4 wells Last 4 wells Execution Cost Well Design Well Productivity 69 55 101 13 11 8 9 11 3,758 3,885 3,951 9 17 21 3 6 7 *As of September 17, 2009 12
Slide 18: Shifting Capital to Haynesville Program
Shifting Capital to Haynesville Program Five of nine rigs operating in Haynesville Economic well below $4.00 gas prices Sufficient takeaway capacity Leveraging existing infrastructure Have secured several long-term firm commitments 18
Slide 19: Operations Update
Operations Update Interstate Pipelines ? Exploration & Production
Slide 20: El Paso Ahead of Curve on Drilling Performance
El Paso Ahead of Curve on Drilling Performance Haynesville Shale Bossier Shale Building Curve Drilling In Lateral MWD Motor Spud to total depth in as few as 30 days for a 4,000' lateral (16,100' total depth well) 20
Slide 21: Haynesville Wellbore Schematic Example
Haynesville Wellbore Schematic Example 21 TOC @ 8,000' (est) 9-5/8" 40# K-55 @ 2,169' MD Total measured depth: 16,100' True vertical depth: 11,800' Lateral Length: 4,000' 12 stages Fracture treatment: 380,000 lbs per stage 3-1/2 hrs. pump time per stage Avg. treating rate: 80 bpm Avg. treating press
Slide 22: Drilling Cost & Performance Continue to Improve
Drilling Cost & Performance Continue to Improve 22 Experienced staff very skilled at horizontal drilling and working with high pressure wells Optimal performance in vertical portion of hole through drilling curve section with PDC vs. insert bits 1 directional bottom hole assembly through curve and l
Slide 23: Haynesville Fracture Stimulation
Haynesville Fracture Stimulation On average: 18 - 2,000 hp pumps 60+ 500 bbl frac tanks, on and off location 40 ton, ~110' crane ~40 People on location Up to 10 miles of water transfer lines 23
Slide 24: Haynesville Completion Procedure
Haynesville Completion Procedure Clean out well with coil tubing unit and perforate for first stage Move in frac equipment and treat first stage Move in high pressure lubricator and pump down isolation plug and perforate for stage 2 Treat stage 2 Repeat this process for all planned frac stages After
Slide 25: Haynesville Completion Comparison
Haynesville Well Stages: 10-14 Avg rate: 80 bpm Avg pressure: 11,000 psi Total prop: 4.5 MM lbs Prop/stage: 380,000 lbs Total fluid: 160,000 bbls Total fluid/stage: 550,000 gal Total days: 20 Haynesville Completion Comparison Vertical CV/Hosston Well Stages: 5-9 Avg rate: 45 bpm Avg pressure: 3,600
Slide 26: El Paso Delivering Industry-leading Haynesville Cycle Time
El Paso Delivering Industry-leading Haynesville Cycle Time Days (Spud to First Sales) EP Wells 2009 Wells Completed (Louisiana Only) Ray P Oden 35H #1 49 Days 26 As of September 30, 2009 Days
Slide 27: Ray P Oden 35H #1 Spud to 1st Sales - Best Well To-date
Ray P Oden 35H #1 Spud to 1st Sales-Best Well To-date 27
Slide 28: Improving Operations Performance
Improving Operations Performance Gregg Reduced drilling days to 30-35 days Improved drill plan and bit selection Reduced completion days to 20 days Use of pump down plugs and perforating Smaller OD plugs have reduced failures from 30% to 5% Water transfer units utilized rather than haul fluid Improv
Slide 29: Summary
Summary Excellent position in the heart of the play Results among best in industry Continuing to improve Premier asset in E&P company Resource and production potential is significant Will apply experience to Eagle Ford shale 29
Slide 30: El Paso E&P Company Haynesville Field Trip
El Paso E&P Company Haynesville Field Trip October 15, 2009