Kodal Minerals Plc · LSE:KOD

Kodal Minerals — Shareholder Meeting (September 2022)

13 slides from Kodal Minerals's shareholder meeting presentation, Sep 29, 2022

  1. Slide 1: Kodal Minerals Plc AGM Presentation

    Kodal Minerals Plc AGM Presentation 29 September 2022

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this document (“Presentation”) and the presentation made to you verbally has been prepared by Kodal Minerals PLC (the “Company”). Kodal Minerals PLC is a UK company quoted on AIM, a market operated by London Stock Exchange plc. This Presentation has not been f

  3. Slide 3: Kodal's Immediate Focus

    KODAL MINERALS Kodal’s Immediate Focus: “Progressing a fast-track option to realise our goal of in Mali. Through the development of a DMS plant, Kodal has a of the continuing buoyant lithium market.” AGMPRESENTATION | 29.09.2022| 01.

  4. Slide 4: Flagship Bougouni Lithium Project: DMS update

    FLAGSHIP BOUGOUNI LITHIUM PROJECT September 2022: DMS update Kodal has reviewed opportunities to accelerate the development of Bougouni Updated feasibility study (‘DMSU”) is indicating the following parameters: © Commence mining at Ngoualanawith process recoveries up to /1% via through a faster buil

  5. Slide 5: DMS Cash Flow Model

    DMS CASH FLOW MODEL Fast Track development scenario for DMS option - Construction and commissioning time for a mining operation based on a DMS plant is estimated at 12 months, compared to 22 months for a full flotation plant Model Inputs: Variable Units DMSU Case Mine Life Ore Tonnes Mined Lithium G

  6. Slide 6: Planned Infrastructure

    PLANNED INFRASTUCTURE Basic design concept for modular crushing facility complete Basic design and layout for DMS processing plant complete New access road concept design complete, providing a direct route to the national highway Samples collected for confirmatory metallurgical testwork with potenti

  7. Slide 7: Estimated C1 cash costs

    o o o Estimated C1* cash costs of US$431 per tonne of concentrate

  8. Slide 8: Mineral Resource Estimate and Expansion

    FLAGSHIP BOUGOUNI LITHIUM PROJECT Mineral Resource Estimate and Expansion - 350km? project area with potential to host multiple open pit lithium operations - JORC mineral resource of 21.3Mt at 1.11% LigO. 11.6Mt at 1.13% LizO indicated & 9.7Mt at 1.08& LizO inferred Multiple pegmatite veins require

  9. Slide 9: Lithium Demand - How Many More Mines Are Needed?

    LITHIUM DEMAND - HOW MANY MORE MINES ARE NEEDED? Benchmark: Lithium Forecast — To meet the world’s lithium ‘wa ate requirements would require /4 new H OW MANY M I N ES sl lithium mines with an average size of fo} DO WE NEED? 7 45,000 ma rr ording to Benchma 1 including forecast volumes from recycled

  10. Slide 10: Gold Exploration

    KODAL MINERALS Kodal Minerals Plc Gold Exploration “Applying proven exploration techniq ues to known gold discoveries to prove up a significant gold resource inventory in West Africa.”

  11. Slide 11: Gold Projects in Excellent Mining Locations

    GOLD PROJECTS IN EXCELLENT MINING LOCATIONS Advanced project at Fatou and Nielle with potential for Gold Resource definition FATOU PROJECT NIELLE PROJECT Southern Mali Northern Cote d'Ivoire Resource definition and expansion Confirmation and extension of mineralisation, targeting maiden JORC resourc

  12. Slide 12: Focus on Development of Bougouni Lithium Project

    KODAL MINERALS - FOCUS ON DEVELOPMENT OF BOUGOUNI LITHIUM PROJECT Kodal Minerals - Activity and Budget Recent News flow and Upcoming Activity Bougouni DMS Option ° Confirmatory Metallurgical testwork * Engineering detail design * In-fill drilling to improve JORC categories DMS Study | Highly attract

  13. Slide 13: Contact details

    BERNARDAYLWARD SP ANGEL ST BRIDES PARTNERS. la Chief Executive Officer Broker Financial PR &IR "e) DAL E: [email protected] E: richard. [email protected] E: [email protected] MINERALS