Devex Resources Ltd · ASX:DEV

Devex Resources — Uranium Equities — Investor Presentation (December 2009)

21 slides from Devex Resources's investor presentation, Dec 14, 2009

  1. Slide 1: A Near Term Production Focus

    A Near Term Production Focus Pre-Production Technology Development and Brownfields Exploration in World Class Districts Investor Update, December 2009

  2. Slide 2: Disclaimer and Competent Person Statement

    Disclaimer and Competent Person Statement ‰ Forward Looking Statements This Presentation may include statements that could be deemed “forward-looking statements”. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such sta

  3. Slide 3: Key Assets

    Key Assets Opportunities For Near Term Production. • The PhosEnergy Process: provides the opportunity to re-establish uranium from phosphates as a major production source globally. • Historic Nabarlek Uranium Mine: A rare Brownfields exploration opportunity. - past production 24 Mlbs @ 1.84% U3O8.

  4. Slide 4: The PhosEnergy Process

    Uranium Equities The PhosEnergy Process. The PhosEnergy Process

  5. Slide 5: Uranium from Phosphates

    Uranium from Phosphates Proven reliable source of uranium. Uranium Spot Price (US$/lb} US U3O8 Production from Phosphates (Mlb/a) • Over 5 million lb per annum produced globally in ’80’s. ¾ Production ceased in ‘90’s due to high operating cost and low uranium price. • Technological advances and util

  6. Slide 6: Scale of the Opportunity

    Scale of the Opportunity More than $1 billion in potential revenue per annum. • Worldwide 100Mt phosphate processed annually. ¾ 20 million lb of contained U3O8 • 15 - 18% of world’s annual U3O8 production currently going unrecovered. • Multiple potential development opportunities globally. • Major P

  7. Slide 7: The PhosEnergy Process

    The PhosEnergy Process The change required to rejuvenate an industry. • Developed by UEQ in partnership with: • Australian Nuclear Science and Technology Organisation (ANSTO). • A major US based phosphate producer. • PhosEnergy is a new “bolt on process” to recover U3O8 as a by-product at existing p

  8. Slide 8: The Current Position

    The Current Position The Process confirmed to pilot plant scale. • Large scale pilot plant testwork completed, over US$5M invested. • International Patent applications filed. • UEQ partners with Cameco – One of the world’s largest uranium producers • Cameco funding ongoing development through tranch

  9. Slide 9: The Steps to U3O8 Production

    The Steps to U3O8 Production Potentially very short lead time. Timeline to present Conceptual Steps to U3O8 Production Concept UEQ Patents Cameco JV with Decision to Proceed with Development Invests Filed Invests Phosphate Producer ? 1st Commercial Facility? 2006 2007 2008 2009 Bench Scale Testing P

  10. Slide 10: In Summary

    In Summary Provides multiple options to near term production. • Large resources defined and waiting to be exploited. • PhosEnergy operating costs $25 - $30/lb. • Large annual production potential at the lower end of the cost curve. • No effective competition: competing historical process has high op

  11. Slide 11: Brownfields exploration in world class mineral districts

    Uranium Equities Brownfields exploration in world class mineral districts

  12. Slide 12: Alligator Rivers Uranium Field

    Alligator Rivers Uranium Field The place to find world class deposits. • Alligator Rivers: A world class Uranium province. • Jabiluka (360 Mlbs U3O8) • Ranger (194 Mlbs U3O8) • Nabarlek ( 24 Mlbs U3O8) • Koongarra ( 16 Mlbs U3O8) • Analogous to the Athabasca province with an order of magnitude less

  13. Slide 13: A Rare "Brownfields" Exploration Opportunity

    A Rare “Brownfields” Exploration Opportunity “In the shadow of the Headframe.” • Nabarlek Project - Extensive Land Position. - Nabarlek Mine Lease 100%. - West Arnhem Land Joint Venture (40% UEQ : 60% CAMECO). • Nabarlek Mine - Australia’s highest grade uranium mine (1.84% U3O8) closed 1988. • Minim

  14. Slide 14: Targets for immediate drilling

    Targets for immediate drilling Structural targets along mineralised corridor. • Possible extensions to the Nabarlek mineralisation control structure remain untested beneath shallow sandstone cover to the north. • Additional parallel structures obscured by transported soil and laterite to the east. •

  15. Slide 15: N147 Discovery

    N147 Discovery Significant ore grade mineralization. • Significant intercepts: - 21.0m @ 0.374% U3O8 - 36.2m @ 0.172% eU3O8 - 14.5m @ 0.224% eU3O8 - 23.4m @ 0.138% eU3O8 • Open along strike in both directions. • Recent SAM survey shows apparent Nabarlek Mine Lease 1988 oblique dislocation through N1

  16. Slide 16: Coopers Prospect

    Coopers Prospect Large Geochemical anomaly – structural targets. • Significant geochemical anomaly associated with margins of distinct magnetic low. • Peak Value 1544ppm U3O8 (ASX announcement 17/9/2009) • Close proximity to the Nabarlek Mine and the N147 Discovery. Nabarlek Mine Lease 1988 • Struct

  17. Slide 17: Regional Geochemistry

    Regional Geochemistry Major Uranium system with ore grade mineralisation. • Significant ore grade mineralisation defined at N147 prospect. • Widespread uranium anomalism in shallow RAB drilling identifies targets for follow up drilling. • Extensive areas under cover remain to be tested. Nabarlek Min

  18. Slide 18: Brownfields Opportunities

    Brownfields Opportunities Near deposit exploration in large mineral systems. • Rudall Project: (UEQ 40% : Cameco 60%) Tenements adjoining Cameco’s Kintyre Uranium Deposit (70 Mlbs @ 0.38%) • Narraweena: (UEQ 100%) Tenements adjoin and cover extensions to the mineralised host to the Ben Lomond Uraniu

  19. Slide 19: Greenfields Opportunities

    Greenfields Opportunities Third party funded exploration for world class deposits. • Headwaters: (Vale earning 70% : UEQ 30%) Large under-explored tenement position in the Alligator River’s Uranium Field. Widespread uranium occurrences. • Lake Blanche: (Cameco earning 60% : UEQ 40%) exploring for ro

  20. Slide 20: Our Partners

    Our Partners Major industry partners investing in quality assets. Cameco Investment in PhosEnergy Mitsui Investment in the Nabarlek Project Cameco WALJV (UEQ 40%) Vale Headwaters JV (UEQ 30% to BFS) Cameco Rudall River JV (UEQ 40%) Nabarlek Mine Lease 1988 Cameco Lake Blanche JV (UEQ 40%)

  21. Slide 21: ASX:UEQ A$0.18 ≈ A$38 million

    ASX:UEQ Quality assets with near term production focus. 30 Day VWAP A$0.18 Market Capital ≈ A$38 million Cash at Bank ≈ A$11.1 million projected Dec ‘09 Shares on Issue 210 million Fully diluted 225 million Nabarlek Mine Lease 1988

Uranium Equities — Investor Presentation (December 2009) on 6ix