Keyera Corp. · TSX:KEY
Keyera — CAPP Scotiabank Investment Symposium 2017
17 slides from Keyera's conference presentation, Apr 11, 2017

Slide 1: CAPP Scotiabank Investment Symposium
CAPP Scotiabank Investment Symposium April 11, 2017

Slide 2: Disclaimer
Disclaimer In the interests of providing Keyera Corp. (“Keyera” or the “Company”) shareholders and potential investors with information regarding Keyera, including Management’s assessment of future plans and operations relating to the Company, this document contains certain statements and informatio

Slide 3: Conservative Financial Strategy
Conservative Financial Strategy % % % cagr cagr distributable cash d i v i d e n d p e r s h a r e 2,3 LT M p a y o u t r a t i o 3 , 4 f l o w p e r s h a r e 1,3 1 Compound annual growth rate from 5/30/2003 to 12/31/2016. 2 Compound annual growth rate from 7/15/2003 to 3/31/2017. 3 Based on divide

Slide 4: Investment Opportunities Continue
Investment Opportunities Continue Millions ANNUAL CAPITAL EXPENDITURES $1,000 $800 $600 $400 $200 $- 1 12/31/12 12/31/13 12/31/14 12/31/15 12/31/16 12/31/17e Growth Capital Upper End of Growth Capital Range Acquisitions Maintenance Capital 1 Estimated growth capital for 2017 includes the pipeline ac

Slide 5: Gathering and Processing Business Unit
Gathering and Processing Business Unit Well maintained, long-life facilities – ~2.9 bcf/d licensed gross capacity1 – 17 active gas plants; 15 operated by Keyera Extensive gathering systems – Significant gathering pipelines tied into existing gas plants – >5,000 kilometres of pipelines operated by Ke

Slide 6: Simonette Liquids Handling Expansion Project
Simonette Liquids Handling Expansion Project Enables Keyera to handle growing volumes of condensate and improve liquids recoveries for customers Facilities include above-ground storage, truck loading, redesigned existing condensate stabilization and other new services Upon completion by mid-2018 for

Slide 7: Wapiti Area Gathering & Processing Complex
Wapiti Area Gathering & Processing Complex Proposed sour Montney gas gathering and Producers active in the Wapiti area: processing complex: • • Apache CNRL • Conoco ̶ Keyera acquired the Wapiti plant site and a successfully • Encana • NuVista tested acid-gas injection well in 2016 • Paramount • Seve

Slide 8: Liquids Business Unit
Liquids Business Unit S T O R AG E SPEC PRODUCT M AR K E T I N G F R AC T I O N A T I O N T R AN S P O R T A T I O N >520,000 bbls of gross N G L M I X T R AN S P O R T A T I O N w orking tank capacity ~2300 ethane AB O V E G R O U N D propane condensate BUTANE BELOW GROUND ~90,000 bbls/d of net ~13

Slide 9: Keylink NGL Gathering Pipeline System
Keylink NGL Gathering Pipeline System New NGL gathering solution for liquids egress and network integration: – NGL gathering pipeline system strengthens Keyera’s value chain by connecting eight Keyera gas plants to the Rimbey energy complex – NGLs can be fractionated at Rimbey or at Keyera Fort Sask

Slide 10: Expanding Underground Storage at KFS
Expanding Underground Storage at KFS Underground storage capacity expansion project: – 14th cavern washing completed in 4Q16; recently brought online1 – 15th cavern currently being washed; expected in-service in 1H181 – Drilled well bores for 16th and 17th caverns in 3Q16; washing of the 16th cavern

Slide 11: Extensive, Flexible Condensate Infrastructure
Extensive, Flexible Condensate Infrastructure Most connected condensate hub in Western Canada Keyera’s Condensate Network Major oil sands delivery options: – Polaris – Access – Grand Rapids – Norlite – FSPL – South Cheecham Supply through multiple receipt points: – Local fractionators and refineries

Slide 12: Multi-Purpose Terminals Across Alberta
Multi-Purpose Terminals Across Alberta Josephburg Rail Terminal 22,400 bbls/d rail capacity1,2 Alberta Crude Terminal 40,000 bbls/d gross rail capacity (20,000 bbls/d net)1 Keyera Edmonton Terminal South Cheecham Rail & Truck Terminal 34,000 bbls/d rail capacity1 24,000 bbls/d gross rail loading cap

Slide 13: Undeveloped Land for Future Growth
Undeveloped Land for Future Growth 132 undeveloped acres 1290 undeveloped acres 166 undeveloped acres Close 350 undeveloped acres proximity to pipelines and railroads Keyera holds salt rights beneath most of these lands Keyera’s Hull Terminal in Texas Keyera Fort Saskatchewan (KFS) Keyera Josephburg

Slide 14: Hull Terminal and Pipeline System
Hull Terminal and Pipeline System Rail, truck and pipeline terminal handles Proposed system flow by 2018 NGL mix, propane, butane and iso-butane Acquired a 88-kilometre, 6-inch pipeline system for US$24 million in 2016 Reactivating and connecting the pipeline system for an estimated cost (incl. thir

Slide 15: Investment Summary
Investment Summary TOTAL RETURN OF A $100 INVESTMENT IN KEYERA Per Share DISTRIBUTABLE CASH FLOW, Payout (split-adj.) Ratio and THE S&P/TSX COMPOSITE INDEX 1 PAYOUT RATIO & DIVIDENDS PER SHARE $3.00 100% $1,100 $2.75 90% $2.50 80% $2.25 $900 70% $2.00 $1.75 60% $700 $1.50 50% $1.25 40% $500 $1.00 30

Slide 16: A Well Positioned Midstream Company
A Well Positioned Midstream Company NGL networked fractionation gas plants & cavern & gathering storage systems capacity industry Alberta leading EnviroFuels condensate iso-octane system business strong diversified balance sheet customer base & low payout & service ratio offering Operational and Fin

Slide 17: Contact Information
Contact Information Lavonne Zdunich, CA Director, Investor Relations & Communications Nick Kuzyk, MBA Manager, Investor Relations 888-699-4853 Keyera Corp. [email protected] 144 4 Avenue SW Suite #200 - West Tower Calgary, Alberta T2P 3N4 www.keyera.com 17
Source: Internet Archive copy of cgycxsfp001.keyera.com
More decks from Keyera Corp.
Corporate Update (November 2026)31 slides · Nov 16, 2026
Investor Presentation (September 2026)43 slides · Sep 4, 2026
Investor Presentation (June 2026)43 slides · Jun 18, 2026
Investor Presentation (May 2026)20 slides · May 2026
Q4 2025 Earnings Presentation21 slides · Feb 12, 2026
Investor Presentation (November 2025)21 slides · November 2025