Aureka Limited · ASX:AKA

Aureka — Navarre Minerals — Shareholder Meeting (November 2011)

27 slides from Aureka's shareholder meeting presentation, Nov 25, 2011

  1. Slide 1: 2011 Annual General Meeting Presentation

    2011 Annual General Meeting Presentation Geoff McDermott - Managing Director 25 November 2011

  2. Slide 2: Forward-looking statement & disclaimer

    Forward--looking statement & disclaimer Forward The information contained in this presentation has been provided by Navarre and other sources identified herein. No representation or warranty, express or implied, is made by Navarre or any adviser or any of their respective affiliates or representativ

  3. Slide 3: Our pathway to exploration success

    Our pathway to exploration success Our goal is to define a maiden mineral resource by December 2012 and then to become a low-cost, significant Victorian gold producer. Our pathway is built on four pillars: • Quality assets • Science to reduce time and cost to discovery • Growth in resources • Streng

  4. Slide 4: 2011 milestones

    2011 milestones Focused and streamlined 1) Initial Public Offering completed • Raised $3.5 million & listed on ASX on 31 March 2011 2) Exploration success at Bendigo North Gold Project • Greenfields gold discovery under shallow cover • 10m @ 34.4g Au/t from 37m down-hole in ACT015, incl. 2m @ 161.2g

  5. Slide 5: Investment case

    Investment case • Quality: Portfolio of properties along high-grade mineral corridors below shallow cover in areas that have seen little or no previous exploration • Science: Apply innovative technology and new geological thinking to reduce time and cost to discovery • Growth: Ownership of a potenti

  6. Slide 6: Management team

    Management team Experience & results • Geoff McDermott – Managing Director & CEO • John Dorward – Business Development • Steve Harper – Chief Geologist • Zac Dornom – Project Geologist • Jodi Ford – Financial Controller • Anthea Perry – Administration & Logistics • Board & Management — Combined 55 y

  7. Slide 7: Victorian Projects

    Victorian Projects

  8. Slide 8: Victorian footprint

    Victorian footprint Excellent exposure to gold and base metals growth Ballarat – Bendigo Corridor Bendigo North Project • Quartz Reef & Secondary gold Ballarat South Project • Quartz Reef gold Landsborough Fault Corridor Kingston Project • Quartz Reef gold Grampians –Stavely Corridor Black Ranges Pr

  9. Slide 9: Pathway to exploration success

    Pathway to exploration success Bendigo North (Tandarra) our flagship asset Our goal is to define a mineral resource and then be a significant gold producer by advancing this project sequentially over the near-term. We believe Tandarra has the potential to be a company-maker. This conceptual chart re

  10. Slide 10: Tandarra: An emerging gold district

    Tandarra An emerging gold district • 100% ownership of flagship project • New Farm-in tenements expand our footprint • Optimum position in this emerging gold district • Near surface greenfields gold discovery with potential for open pit mining • Target concept: multiple “Bendigo-style” gold in quart

  11. Slide 11: Tandarra: Best gold prospect in Victoria

    Tandarra Best gold prospect in Victoria • We believe that Tandarra is the highest quality new gold discovery in Victoria in the past 100 years • Our objective is to advance Tandarra to mineral resource status as efficiently as possible • Exploration has identified six high-grade gold (>20g Au/t) int

  12. Slide 12: Tandarra: High-quality project

    Tandarra High-quality project Tandarra drill highlights* Minimum Gold Maximum Gold • Gold results are: moderate to Hole ID Length (m) Assay Range (g Au/t) Assay Range (g Au/t) high-grade; close to surface; ACT024 12.0 0.3 2.8 potentially open-pit mineable; includes 1.0 2.6 26.2 near established infr

  13. Slide 13: Tandarra: Project growth

    Tandarra Project growth 2007 Drilling 2011 Drilling

  14. Slide 14: Tandarra: 2011-12 Strategy

    Tandarra 2011-12 Strategy • $4.2 million exploration program • Resource definition drilling commences on or about 30 November 2011 • 110 line kilometres of geophysics • Targeting maiden resource by • Up to 50,000 metres of drilling December 2012 • Commence geophysics and air-core • Initiate feasibil

  15. Slide 15: Comparison to the Bendigo Goldfield

    Tandarra Comparison to the Bendigo Goldfield Tandarra and Bendigo Goldfield at same scale

  16. Slide 16: Tandarra summary

    Tandarra summary An emerging gold district New greenfields discovery • No previous mining concealed under shallow sands & clays • Multiple lines of reef detected potential for repetition at depth • Potential for secondary gold alluvials, deep leads Near surface mining opportunity from multiple lines

  17. Slide 17: Project Pipeline

    Project Pipeline

  18. Slide 18: Kingston

    Kingston Emerging gold project close to established infrastructure • At-surface, oxide gold mineralisation with shallow high-grade gold intercepts to follow up • 100% owned with dominant position along prospective Landsborough Fault • Historic mining over 1,000 metres of strike to 75 metres deep - h

  19. Slide 19: Kingston

    Kingston Previous high-grade gold intercepts to follow up • Diamond drill program scheduled to commence in December 2011

  20. Slide 20: Black Ranges

    Black Ranges Significant copper-zinc-gold prospect • We believe that the Black Ranges Volcanic rocks are similar in age and geology to Tasmania’s Mt Read Volcanics - host to large deposits such as Mt Lyell, Rosebery, Henty & Hellyer • Under-explored due to poor outcrop and shallow cover • 100% owned

  21. Slide 21: 2011-12 catalysts & milestones

    2011--12 catalysts & milestones 2011 This conceptual chart represents an estimated timeline of the Company’s projects. As new information is received from exploration activities this timeline may be subject to change. To date, there has been insufficient exploration to estimate a mineral resource an

  22. Slide 22: 2012 exploration plan

    2012 exploration plan Poised for growth • Drilling phases at Tandarra, Kingston, Raydarra and Sebastian • Geophysics programs at Tandarra, Kingston, Raydarra and Black Ranges • Resource modelling and grade estimation at Tandarra • Subject to success … bulk sampling, metallurgical test work and comme

  23. Slide 23: For more information contact Navarre Minerals Limited

    For more information contact Navarre Minerals Limited Operations Office: 40 – 44 Wimmera Street Stawell VIC 3380 Tel: 03 5358 8623 Website: www.navarre.com.au Email: [email protected]

  24. Slide 24: Appendix

    Appendix, j < a

  25. Slide 25: Corporate

    Corporate ASX code NML (listed 31 March 2011) Shares on issue 55.8 million Options 1.8 million (unlisted) Share Price 27c (24 November 2011) Market Cap $15 million Cash $5.4 million (30 September 2011) Major Shareholders AuRico Gold (Northgate) 9.3% Board & Management 26.5% Top 20 shareholders 63.5%

  26. Slide 26: Experienced board

    Experienced board Kevin Wilson Chairman Rey Resources, Leviathan Resources, Merrill Lynch, Anglo American Geoff McDermott Managing Director Leviathan Resources, MPI Mines, WMC, Rio Tinto John Dorward Non-executive Director Fronteer Gold, Mineral Deposits, Leviathan Resources, MPI Mines, Bank West Co

  27. Slide 27: Bendigo Goldfield

    Bendigo Goldfield World class gold deposit Source: Catalyst Metals Limited ASX release 20 July 2011

Navarre Minerals — Shareholder Meeting (November 2011) on 6ix