  1. Slide 1: Deutsche Bank Alternative Energy, Utilities & Power Conference

    Slide 1: Deutsche Bank Alternative Energy, Utilities & Power Conference

    Deutsche Bank Alternative Energy, Utilities & Power Conference New York, NY May 12, 2011 1

  2. Slide 2: Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995

    Slide 2: Safe Harbor Statement under the Private Securities Litigation Reform Act of 1995

    “Safe Harbor” Statement under the Private Securities Litigation Reform Act of 1995 This presentation contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934. Although AEP and each of its Registrant Subsidiaries believe that their expectations are

  3. Slide 3: Nick Akins, President

    Slide 3: Nick Akins, President

    Nick Akins, President 3

  4. Slide 4: Domestic Generation Fleet

    Slide 4: Domestic Generation Fleet

    Domestic Generation Fleet Generation Capacity by Fuel Type 2010 Generation Production by Fuel Type Based on 39,910 MW Based on 173.2 TWh Pumped Pumped Storage/Hydro/ Nuclear Storage/Hydro Wind/Solar 9.0% 0.5% Nuclear 7% 5% Nat. Gas/Oil 8.0% Nat. Gas/Oil 23% Coal/Lignite 65% Coal/Lignite 82.5% Genera

  5. Slide 5: Emissions Reductions since 2000

    Slide 5: Emissions Reductions since 2000

    Emissions Reductions since 2000 U.S. Power Plant SO2 Emissions AEP SO2 Emissions 11.2 10.6 10.2 10.6 10.3 10.2 1,020 997 9.4 924 937 in million U.S. tons 8.9 915 900 in thousand U.S. tons 853 7.6 749 55% 5.7 49% 638 reduction reduction 457 since 2000 since 2000 2000 2001 2002 2003 2004 2005 2006 200

  6. Slide 6: AEP Generation Capacity

    Slide 6: AEP Generation Capacity

    AEP Generation Capacity East Capacity – 27,253 MW West Capacity – 11,677 MW AEP Ohio, APCo, I&M, AEG, KPCo, Wind, Solar, Hydro PSO, SWEPCO, TNC, Wind Wind Renewables 9% Coal 5% 38% Nuclear Coal Source 8% Coal Source NAPP 46% NG CAPP 30% PRB 75% 11% PRB 22% Lignite 25% Others 2% Avg. Delivered Cost A

  7. Slide 7: Pending EPA Regulations

    Slide 7: Pending EPA Regulations

    Pending EPA Regulations TRANSPORT RULE MERCURY AND HAP MACT  Proposed Transport Rule (July 2010) limits utility SO2 and NOx  Proposed rule issued in March 2011 emissions  Final HAP regulations must be issued by November 2011  SO2 and NOx subject to caps in 2012, with further SO2 reductions requi

  8. Slide 8: Anticipated EPA Timeline for Retrofits or Replacement

    Slide 8: Anticipated EPA Timeline for Retrofits or Replacement

    Anticipated EPA Timeline for Retrofits or Replacement Transpo P,E&C Compliance rt INFEASIBLE CONSTRUCTION HAPs P,E&C Compliance TIMELINES Coal Ash P,E&C Compliance Water – 316(b) P,E&C Compliance 2011 2012 2013 2014 2015 2016 2017 2018 Rule Finalization P,E&C (Permitting, Engineering & Construction)

  9. Slide 9: AEP Coal Fleet Assessment

    Slide 9: AEP Coal Fleet Assessment

    AEP Coal Fleet Assessment 2012 – 2020 Least Exposed Operating Company MW Range of Capital ($Millions) (1) (1) The impact of all proposed rules APCo 3,353 continues to be CSPCo 1,277 Proposed Rules Low High under review. Ohio Power 5,687 Project scope and (2) Water Rules $ 5 $ 9 technical 42% assessm

  10. Slide 10: Key Takeaways

    Slide 10: Key Takeaways

    Key Takeaways  Established track record of constructing state of the art pollution control equipment – 9 scrubbers on 7,900 MW’s between 2003-2011(12,000+ scrubbed in total) – 12 SCR’s on 11,000+ MW’s between 2001-2011  We are supportive of Clean Air Act, but it must be under a feasible timetable

  11. Slide 11: Appendix

    Slide 11: Appendix

    Appendix 11

  12. Slide 12: Earnings and Dividends

    Slide 12: Earnings and Dividends

    Earnings and Dividends On-Going EPS History Since 2004 Dividend History Since 2004 $/share $/share 3.60 2.00 3.40 .1% % 4.0 $1.84 = 4 1.80 R $3.24 = 3.20 C AG $3.10 GR $1.71 CA$1.58 $1.64 $3.03 $1.64 $3.00 $2.97 3.00 1.60 $2.77 $1.50 2.80 $2.73 $1.40 $1.42 2.60 1.40 2.40 $2.33 1.20 2.20 2.00 1.00 20

  13. Slide 13: American Electric Power

    Slide 13: American Electric Power

    American Electric Power Generation owned11 (GW) Generation owned (GW) Southern 42.9 Serving electric customers in Co NextEra 11 states 42.7 Energy AEP 39.9 Duke 38.5 One of the largest Energy U.S. electricity generators Transmission miles11 (‘000s) Transmission miles (‘000s) A EP 39.0 Southern 27.0

  14. Slide 14: Highly Diversified Regulated Utility Platform

    Slide 14: Highly Diversified Regulated Utility Platform

    Highly Diversified Regulated Utility Platform 2010 On-Going Earnings 2010 Retail Load Contribution Public Service of Kentucky Southwestern Oklahoma Power 3% Wholesale * 10% Electric 6% Power 11% Residential Ohio Power 30% 24% Texas Industrial 8% 33% All Others Columbus 5% Southern Power Indiana & 17

  15. Slide 15: Environmental Project Status Report

    Slide 15: Environmental Project Status Report

    Environmental Project Status Report MW Plant Name Capacity SCR Status FGD Status East Plants Amos 1 800  In-service  In-service Amos 2 800  In-service  In-service Amos 3 1300  In-service  In-service Big Sandy 2 800  In-service Cardinal 1 600  In-service  In-service Conesville 5 375  In-ser

  16. Slide 16: Turk Plant

    Slide 16: Turk Plant

    Turk Plant  John W. Turk Jr. Ultra-Supercritical Coal Plant is a base load 600-MW advanced coal combustion plant. Located in Arkansas. SWEPCo owns 73 percent or roughly 440 megawatts of the total unit.  The cost of the plant and related transmission is anticipated at $1.7 billion with AEP’s share

  17. Slide 17: Summary of ESP Filing - Continued

    Slide 17: Summary of ESP Filing - Continued

    Summary of ESP Filing - Continued  Pre-tax earnings impact from proposed ESP (excluding potential earnings impact from trackers)  Net base $54MM or 1.4% in year 1 (2012)  Net base $106MM or 2.7% in year 2 (2013) 2012 2013 2014 Revenue $/MWh % Revenue $/MWh % Revenue $/MWh % Proposed ESP Changes B

  18. Slide 18: Price to Compare

    Slide 18: Price to Compare

    Price to Compare Proposed SSO Rates Redesigned To Resemble Market Pricing Structures 100 90 80 $/MWh 70 60 50 40 CSP RS OP RS CSP GS1 OP GS1 CSP GS2 OP GS2 CSP GS3 OP GS3 CSP GS4 OP GS4 Tariff Class 2012 Rates before ESP 2012 ESP Rates 2013 ESP Rates Rates do not reflect mitigation impact of market

  19. Slide 19: Market Transition Rider – Mitigates the Initial Impact of Rate Realignment

    Slide 19: Market Transition Rider – Mitigates the Initial Impact of Rate Realignment

    Market Transition Rider – Mitigates the Initial Impact of Rate Realignment Three‐Year Market Transition Plan Summary of AEP Ohio ESP Generation Rate Changes Illustration of Market Transition Rider on ESP Generation Rate CSP Current CSP New Increases Customer Class Customer Class 2012 Increase 2013 I

  20. Slide 20: List of ESP Riders – Existing and Proposed

    Slide 20: List of ESP Riders – Existing and Proposed

    List of ESP Riders – Existing and Proposed Line Rate Mechanism Abbreviation Bypassable Distribution Notes 1 Current Riders 2 Universal Service Fund Rider USF -- Yes 3 Advanced Energy Fund Rider AEF -- Yes Expired 12/31/2010 4 kWh Tax Rider kWh Tax -- May be self-assessed under specific terms 5 Provi

  21. Slide 21: Summary Rate Case Information

    Slide 21: Summary Rate Case Information

    Summary Rate Case Information AEP Ohio Distribution Rate Case – Docket #351/352-EL-AIR On February 28, 2011, AEP Ohio filed a distribution base rate case with the Public Utilities Commission of Ohio requesting a net increase of $93.8 million, and requesting authority to recover previously approved r

  22. Slide 22: Summary Rate Case Information

    Slide 22: Summary Rate Case Information

    Summary Rate Case Information APCo Virginia Base Rate Case – Docket #PUE-2011-00037 On March 31, 2011 APCo filed an update to its pre-biennial base rate case for recovery of generation and distribution costs requesting an increase of $75 million ($126 million total increase less $51 million associat

  23. Slide 23: Approved Rate Bases & ROEs

    Slide 23: Approved Rate Bases & ROEs

    Approved Rate Bases & ROEs Jurisdiction Rate Base Approved ROE Approved Debt/Equity Effective Date APCo-Virginia * 10.53% 58/42 8/1/2010 $2,060MM APCo-West Virginia $2,428MM 10.00% 57/43 3/30/2011 KPCo-Kentucky $995MM 10.50% 57/43*** 6/30/2010 I&M-Indiana $2,000MM 10.50% 44/56 3/4/2009 I&M-Michigan

  24. Slide 24: Detailed Ongoing Earnings Guidance

    Slide 24: Detailed Ongoing Earnings Guidance

    Detailed Ongoing Earnings Guidance 2010A: $3.03 2011E: $3.00 - $3.20 American Electric Power Financial Results for 2011 Guidance vs 2010 Actual 2010 2011 Actual Guidance Performance Driver ($ millions) Performance Driver ($ millions) UTILITY OPERATIONS: Gross Margin: 1 East Regulated Integrated Util

  25. Slide 25: Normalized Load Trends

    Slide 25: Normalized Load Trends

    Normalized Load Trends AEP Residential Normalized GWh Sales AEP Commercial Normalized GWh Sales %Change vs. Prior Year %Change vs. Prior Year 15% 15% 10% 10% 5% 5% 2.1% 1.3% 2.0% -0.3% 0.6% 1.9% 0.7% 0% 0% -1.2% -0.3% -0.4% -1.6% -1.6% -5% -5% 1Q10 2Q10 3Q10 4Q10 2010A 2011E 1Q10 2Q10 3Q10 4Q10 2010

  26. Slide 26: Capital Expenditures

    Slide 26: Capital Expenditures

    Capital Expenditures $3,000 $2,900 $2,615 AEP Transco $2,487 $350 $2,500 $160 JV Equity $1 $47 $113 $280 Contributions, net $77 $2,243 $34 AEP River Ops & $50 $223 Other Non-Utility $457 $24 $56 Environm ental $2,000 $303 $319 $256 New Generation $ in millions $62 $263 $82 $133 Corporate/Other $1,50

  27. Slide 27: Rate Changes

    Slide 27: Rate Changes

    Rate Changes $700 Pending/Future $600 $500 Secured $ in millions $400 $659 $300 $527 $235 $450 $35 $200 $352 $329 $100 $200 $0 2006A 2007A 2008A 2009A 2010A 2011E Note: Rate changes in this chart exclude revenues with offsetting costs Pending/future rate cases includes amounts from the Ohio environm

  28. Slide 28: Cash Flow Guidance

    Slide 28: Cash Flow Guidance

    Cash Flow Guidance $ in millions 2010A 2011E Cash From Operations Income from Continuing Operations $ 1,218 $ 1,499 Depreciation & Amortization 1,641 1,611 Pension Funding (500) (150) Other Cash Flow Items 659 834 Litigation Resolution - (211) Working Capital 279 7 Cash From Operations $ 3,297 $ 3,5

  29. Slide 29: Capitalization & Liquidity

    Slide 29: Capitalization & Liquidity

    Capitalization & Liquidity 70% Total Debt/Capitalization Current Liquidity Summary 65% Liquidity Summary Actual 62.5% (unaudited) 04/25/11 60.7% ($ in millions) Amount Maturity 60% 59.1% 5-Year Revolving Credit Facility $1,500 Jun-13 57.2% 57.2% 57.0% 57.2% 5-Year Revolving Credit Facility $1,454 Ap

  30. Slide 30: Long-term Debt Maturity Profile

    Slide 30: Long-term Debt Maturity Profile

    Long-term Debt Maturity Profile ($ in millions) Year 2011 2012 2013 AEP, Inc. - - - AEP Generating Company $130 - - Appalachian Power $250 $315 $195 Columbus Southern Power - $195 $306 Indiana Michigan Power - $100 $77 Kentucky Power - - - Ohio Power - - $550 Public Service of Oklahoma $75 - - South

  31. Slide 31: Transmission Investment Strategy

    Slide 31: Transmission Investment Strategy

    Transmission Investment Strategy  Near-Term Investment – Electric Transmission Texas (ETT) secures near term investment opportunities, allowing AEP to invest in the large, growth- oriented Texas transmission market. Total capital expenditures of $3 billion with a 9.96% ROE.  Mid-Term Investment –

  32. Slide 32: Texas Transmission Growth Strategy: Near Term Investment

    Slide 32: Texas Transmission Growth Strategy: Near Term Investment

    Texas Transmission Growth Strategy : Near Term Investment Ownership Structure: 50/50 (AEP/MidAmerican Energy Holding Company) Total Project Cost: Over $3 Billion Growing Rate Base: Current rate base is $412 million; expected to grow as follows: 2011: $473 million 2012: $778 million 2013: $1,352 mill

  33. Slide 33: Transco Update

    Slide 33: Transco Update

    Transco Update FERC:  April 2011 -- The Commission finds in the order that the Settlement is just and reasonable and the business plan will provide benefits to AEP operating companies and customers. – ROE order for East Transco’s is 11.49% – ROE order for West Transco’s is 11.20% State Filing Statu

  34. Slide 34: Joint Venture Strategy: Long-term

    Slide 34: Joint Venture Strategy: Long-term

    Joint Venture Strategy: Long-term  Strategy: JV’s secure new investment opportunities with local utilities to diversify AEP’s investment outside AEP’s traditional footprint while providing longer-term incremental earnings. JV projects are well-suited for FERC formula rate recovery mechanism, includ

Source: Internet Archive copy of test22.aep.com