Deep Fission, Inc. · NASDAQ:FISN
Deep Fission — Investor Presentation (November 2026)
15 slides from Deep Fission's investor presentation, November 2026
Slide 1: DeepFission.com November 2026
DeepFission.com NOVEMBER 2026 1
Slide 2: Forward-looking statements
Forward-looking statements This presentation includes forward-looking statements within the meaning of federal securities laws, including the Private Securities Litigation Reform Act of 1995. Forward-looking statements describe future expectations, plans, results or strategies and can often be ident
Slide 3: Less to build. Designed to cost less.
Conventional Above-Ground Pressurized Water Reactor Less to build. Designed to cost less. X Containment Building X Pressurizer X External Backup Power X External Emergency Core Cooling Systems Utility-scale solar is ~7,000 acres per gigawatt. The most recent conventional PWR is ~700 acres per gigawa
Slide 4: Leveraging three mature technologies
Leveraging three mature technologies.* Deep Borehole Drilling Decades-proven commercial drilling techniques for containment one mile underground. Deep Fission aims to simplify Geothermal Technology nuclear reactor deployment— Using established processes for energy deep underground, designed transfer
Slide 5: Gravity does the work. Passive safety by design.
d Gravity does the work. 1 Passive safety by design. The design calls for a large-diameter borehole, cased and cemented from surface to total depth of ~6000 ft, intended to provide continuous passive cooling using the water column above the reactor. We believe this design will 26 reduce the risk of
Slide 6: Targeting first commercial power in 2027 and delivery at scale by 2028
We are targeting first commercial power in 2027 and delivery at Utilities, data centers, and defense are adding load scale by 2028. faster than expected growth in supply.
Slide 7: Building a path to commercial power
Building a path to commercial power. Key updates: Regulatory NSDA approved & published for transparency Commercial Siting Master Energy Purchase Agreement signed in Kansas Fuel Standard LEU contract with Urenco Construction Commercial drilling & non-nuclear testing underway Customers Multi-GWe pipel
Slide 8: From drilling to delivery in months, not years
Our goal is speed at scale: From drilling to delivery in months, not years. 15 MWe 150 MWe 2 GWe 1.5 GWe Targeting six months from Phased deployment of ten reactors, 100 reactors on a single site has the drilling to delivery for one single designed to power an industrial site. potential to power a h
Slide 9: Moving to fill the immediate generation gap
Deep Fission is moving to fill the immediate generation gap. Multi-Gwe generation capacity pipeline. Total pipeline of signed master energy purchase agreement and non-binding letters of intent includes data centers, industrial parks, co-developers and strategic partners. 9
Slide 10: Leveraging mature supply chain
Leveraging mature supply chain Engineering, Drilling & Procurement, Fuel Manufacturing Engineering Construction Completion Construction Enriched uranium MOU Signed Delivered the Designing the manager for the product (EUP) prototype reactor instrument hub + demonstration procured canister electronics
Slide 11: Our Planned Business Model
Project-Level Equity Participation For certain projects, we plan to retain an ownership interest in the project company. If those projects reach commercial operation, we would expect to receive our share of project- level cash flows associated with electricity generation and sale over the operating
Slide 12: Development is already underway
Development is already underway Up to 2 GWe ~6,000 ft. Prototype canister Master Energy Purchase first data acquisition well installation demonstrated Agreement at Great Plains 12
Slide 13: The Deep Fission Advantage
The Deep Fission Advantage (0) 02 Built on proven Speed and technologies capital efficiency 03 04 Execution Modular and underway scalable 05 06 Commercial Technical depth pathway and defensible IP Ee) iA) e = as nN ma = E_. = re _ | = NUTTY
Slide 14: Energy Resilience for All
DeepFission.com Energy Resilience for All
Slide 15: Commercialization Milestones
Commercialization Milestones Regulatory Siting Fuel Construction Commercial Operation Date (COD) Target Completion Date Estimates 2026 2027 2028 S O N D J F M A M J J A S O N D J F M A M J J A NSDA approval Completed Aug 6, 2026 PDSA approval DSA submittal DOE authorization Pilot demonstration NRC l