Titan Minerals Ltd · ASX:TTM

Titan Minerals — Investor Presentation (September 2021)

16 slides from Titan Minerals's investor presentation, September 2021

  1. Slide 1: Developing the Dynasty Gold Project in Ecuador's southern Andean copper-gold belt

    Developing the Dynasty Gold Project in Ecuador’s southern Andean copper-gold belt Investor Presentation September 2021 ASX:TTM

  2. Slide 2: Disclaimer and Forward-Looking Statements

    DISCLAIMER AND FORWARD-LOOKING STATEMENTS NOTES TO MINERAL RESOURCES NOT FINANCIAL PRODUCT ADVICE The Mineral Resource Estimates for the Dynasty Gold Project and Jerusalem Project are not reported in accordance with the JORC Code This presentation does not it constitute financial product advice and

  3. Slide 3: Potential World Class Assets

    Potential World Class Assets Dynasty – Flagship Asset  Foreign Current Resource: 2.1Moz (14.4Mt @ 4.5 g/t Au)(1)  Previous small-scale mining operation  High-grade mineralisation from surface Linderos  Part of the prolific Miocene metallogenic belt  High-grade epithermal gold discovery with cop

  4. Slide 4: Investment Highlights

    Investment Highlights Undervalued Upcoming Highly Regarded Experienced Board World Class Projects Asset Base Work Plan Jurisdiction and Management  Dynasty –  Restructure complete  12,000m drilling at  Strong support from  MD Laurie Marsland Drilling in Progress for Dynasty in progress Lasso Go

  5. Slide 5: Corporate Overview

    Corporate Overview Key Executives & Management Technical Team Peter Cook Non-Exec Chairman Laurence Marsland – Managing Director Michael Skead – Executive V.P. Exploration  Mechanical engineer with 30 years experience in  Geologist with over 30 years of experience in Laurence Marsland Managing Dir

  6. Slide 6: Road Map

    Road Map Dynasty – Drilling Dynasty – Drilling Dynasty –Resource Update Metallurgical Studies Dynasty – Delineation Drilling •12,000m campaign •Drilling continues on •JORC compliant resource •Commence preliminary •In-fill and extension drilling on completes extension targets at estimation following

  7. Slide 7: Operational and Corporate Achievements

    Operational and Corporate Achievements May 2021 July 2021 Corporate May 2020 July 2020 October 2020 Titan Acquires Titan hires Freddy Villao Titan divests out Established social license within Titan completes US$15m 100% of Core Gold – VP Government Affairs of Peru majority of the communities sale o

  8. Slide 8: Dynasty Gold Project – A New Dawn

    Dynasty Gold Project – “A New Dawn”  139km2, 100% holding (5 concessions)  Foreign Resource: 2.1Moz (14.4Mt @ 4.5 g/t Au)(1)  Mineralisation open along strike and at depth  Close to Infrastructure  Permitted for drilling, with substantial growth potential  Channel sampling and field mapping ac

  9. Slide 9: Recent Results are Confirming Previous Resource

    Recent Results are Confirming Previous Resource  Over 140 veins have now been delineated – 30% increase  Increased vein density supports open pit mining  Lateral extensions of up to 160m for some mineralised zones  Confirmation of gold mineralisation over a vertical depth of 450m, a further 150m

  10. Slide 10: Dynasty Gold Project – Bulk tonnage potential

    Dynasty Gold Project – Bulk tonnage potential  Assay results demonstrate high-grade gold mineralisation outside of existing resource Cerro Verde  Cerro Verde – open along strike and at depth  High density veining supports potential for bulk tonnage mining over some areas  3 years of small-scale

  11. Slide 11: Linderos Project – Copper porphyry and epithermal gold style mineralisation

    Linderos Project – Copper porphyry and epithermal gold style mineralisation  143km2, 100% owned (4 concessions)  Part of the prolific Miocene metallogenic belt  High sulphidation gold system on the margin of a Cu-Mo porphyry  Located 20km southwest of flagship Dynasty  Mineralisation is hosted

  12. Slide 12: Linderos Project – Historic drill results

    Linderos Project – Historic drill results  Copper Ridge – Historical drill results: - 99.75m @ 0.26% copper from 255m drilled depth – ERIKA01 - 84.85m @ 0.32% copper (from surface to end of hole) – ERIKA02 - 20m @ 0.21% copper from 181m to EOH (open at depth) – ERIKA02A - 77.05m @ 0.19% copper (fro

  13. Slide 13: Copper Duke Project – Tier 1 Potential

    Copper Duke Project – Tier 1 Potential  130km2, 100% holding (13 concessions)  18km east of Dynasty  Multi-phase outcropping porphyry targets, including: - Porphyry copper-gold mineralisation - Epithermal gold bearing quartz-magnetite vein systems  Open-ended surface geochem anomalism in soil an

  14. Slide 14: Copper Duke Project – Geophysics

    Copper Duke Project – Geophysics  Magnetic anomalies correspond with high-grade gold and copper geochemistry associated with porphyry style mineralisation observed at surface  Airborne Survey confirmed and extended a corridor hosting multiple clusters of intrusive centres  Clusters of intrusion r

  15. Slide 15: Jerusalem Gold Project

    Jerusalem Gold Project High-grade gold and silver asset  100% owned 2.25km2 (1 concession)  High-grade vein mineralisation from surface  Historical diamond drillhole dataset of 47 diamond holes totalling 13,383m  Total Foreign Resource: 1.2 Moz gold @ 14.5g/t and 8.6Moz silver at 98g/t(1) - Meas

  16. Slide 16: Laurence Marsland, Managing Director

    Laurence Marsland Managing Director +61 8 6555 2950 [email protected] titanminerals.com.au

Titan Minerals — Investor Presentation (September 2021) on 6ix