Titan Minerals Ltd · ASX:TTM
Titan Minerals — Investor Presentation (September 2021)
16 slides from Titan Minerals's investor presentation, September 2021
Slide 1: Developing the Dynasty Gold Project in Ecuador's southern Andean copper-gold belt
Developing the Dynasty Gold Project in Ecuador’s southern Andean copper-gold belt Investor Presentation September 2021 ASX:TTM
Slide 2: Disclaimer and Forward-Looking Statements
DISCLAIMER AND FORWARD-LOOKING STATEMENTS NOTES TO MINERAL RESOURCES NOT FINANCIAL PRODUCT ADVICE The Mineral Resource Estimates for the Dynasty Gold Project and Jerusalem Project are not reported in accordance with the JORC Code This presentation does not it constitute financial product advice and
Slide 3: Potential World Class Assets
Potential World Class Assets Dynasty – Flagship Asset Foreign Current Resource: 2.1Moz (14.4Mt @ 4.5 g/t Au)(1) Previous small-scale mining operation High-grade mineralisation from surface Linderos Part of the prolific Miocene metallogenic belt High-grade epithermal gold discovery with cop
Slide 4: Investment Highlights
Investment Highlights Undervalued Upcoming Highly Regarded Experienced Board World Class Projects Asset Base Work Plan Jurisdiction and Management Dynasty – Restructure complete 12,000m drilling at Strong support from MD Laurie Marsland Drilling in Progress for Dynasty in progress Lasso Go
Slide 5: Corporate Overview
Corporate Overview Key Executives & Management Technical Team Peter Cook Non-Exec Chairman Laurence Marsland – Managing Director Michael Skead – Executive V.P. Exploration Mechanical engineer with 30 years experience in Geologist with over 30 years of experience in Laurence Marsland Managing Dir
Slide 6: Road Map
Road Map Dynasty – Drilling Dynasty – Drilling Dynasty –Resource Update Metallurgical Studies Dynasty – Delineation Drilling •12,000m campaign •Drilling continues on •JORC compliant resource •Commence preliminary •In-fill and extension drilling on completes extension targets at estimation following
Slide 7: Operational and Corporate Achievements
Operational and Corporate Achievements May 2021 July 2021 Corporate May 2020 July 2020 October 2020 Titan Acquires Titan hires Freddy Villao Titan divests out Established social license within Titan completes US$15m 100% of Core Gold – VP Government Affairs of Peru majority of the communities sale o
Slide 8: Dynasty Gold Project – A New Dawn
Dynasty Gold Project – “A New Dawn” 139km2, 100% holding (5 concessions) Foreign Resource: 2.1Moz (14.4Mt @ 4.5 g/t Au)(1) Mineralisation open along strike and at depth Close to Infrastructure Permitted for drilling, with substantial growth potential Channel sampling and field mapping ac
Slide 9: Recent Results are Confirming Previous Resource
Recent Results are Confirming Previous Resource Over 140 veins have now been delineated – 30% increase Increased vein density supports open pit mining Lateral extensions of up to 160m for some mineralised zones Confirmation of gold mineralisation over a vertical depth of 450m, a further 150m
Slide 10: Dynasty Gold Project – Bulk tonnage potential
Dynasty Gold Project – Bulk tonnage potential Assay results demonstrate high-grade gold mineralisation outside of existing resource Cerro Verde Cerro Verde – open along strike and at depth High density veining supports potential for bulk tonnage mining over some areas 3 years of small-scale
Slide 11: Linderos Project – Copper porphyry and epithermal gold style mineralisation
Linderos Project – Copper porphyry and epithermal gold style mineralisation 143km2, 100% owned (4 concessions) Part of the prolific Miocene metallogenic belt High sulphidation gold system on the margin of a Cu-Mo porphyry Located 20km southwest of flagship Dynasty Mineralisation is hosted
Slide 12: Linderos Project – Historic drill results
Linderos Project – Historic drill results Copper Ridge – Historical drill results: - 99.75m @ 0.26% copper from 255m drilled depth – ERIKA01 - 84.85m @ 0.32% copper (from surface to end of hole) – ERIKA02 - 20m @ 0.21% copper from 181m to EOH (open at depth) – ERIKA02A - 77.05m @ 0.19% copper (fro
Slide 13: Copper Duke Project – Tier 1 Potential
Copper Duke Project – Tier 1 Potential 130km2, 100% holding (13 concessions) 18km east of Dynasty Multi-phase outcropping porphyry targets, including: - Porphyry copper-gold mineralisation - Epithermal gold bearing quartz-magnetite vein systems Open-ended surface geochem anomalism in soil an
Slide 14: Copper Duke Project – Geophysics
Copper Duke Project – Geophysics Magnetic anomalies correspond with high-grade gold and copper geochemistry associated with porphyry style mineralisation observed at surface Airborne Survey confirmed and extended a corridor hosting multiple clusters of intrusive centres Clusters of intrusion r
Slide 15: Jerusalem Gold Project
Jerusalem Gold Project High-grade gold and silver asset 100% owned 2.25km2 (1 concession) High-grade vein mineralisation from surface Historical diamond drillhole dataset of 47 diamond holes totalling 13,383m Total Foreign Resource: 1.2 Moz gold @ 14.5g/t and 8.6Moz silver at 98g/t(1) - Meas
Slide 16: Laurence Marsland, Managing Director
Laurence Marsland Managing Director +61 8 6555 2950 [email protected] titanminerals.com.au
Titan Minerals — Investor Presentation (September 2021) on 6ix