Aker Solutions Asa · OSL:AKSO

Aker Solutions Asa — Investor Day (December 2012)

5 slides from Aker Solutions Asa's investor day presentation, Dec 5, 2012

  1. Slide 1: Maintenance, Modifications and Operations

    Preferred partner Extending the life of the fields Maintenance, Modifications and Operations Capital Markets Day, 5 December 2012 Tore Sjursen | Head of MMO © 2012 Aker Solutions Slide 83 5 Dec 2012 Capital markets day Preferred partner Maintenance, modifications and operations (MMO) Key services ■

  2. Slide 2: MMO market CAGR in our regions of interest: 5-8%

    MMO market CAGR in our regions of interest: 5-8% Atlantic ~6% Norway ~6% Canada 25 19 1,6 2,1 2012 2017 United ~5% 2012 2017 Malaysia ~8% Kingdom 22 17 9 6 Gulf of ~5% Mexico 2012 2017 2012 2017 1,4 1,7 Brunei Australia ■ Aims to double their ■ Large upcoming LNG 2012 2017 production capacity develo

  3. Slide 3: Northern ambitions and strong coastal presence

    Northern ambitions and strong coastal presence ■ Engineering hub in Tromsø Tromsø established earlier this year ■ More than 60 employees today – between 200-300 in 2015 Sandnessjøen ■ Will be important for arctic developments ■ Engineering and fabrication capabilities in Sandnessjøen ■ New office op

  4. Slide 4: Brunei contract overview

    Brunei contract overview ■ Management contractor for Brunei BSP overview: Shell Petroleum Co Sdn Bhd's (BSP) ■ Dominant E&P in Brunei Darussalam offshore construction and maintenance ■ 244 offshore structures services ■ 817 producing wells, 2 200km pipelines ■ Five year contract (+ two year option)

  5. Slide 5: Next Step | Australia?

    Next Step | Australia? “The FLNG facility itself will be 488m long and 74m wide, and when fully loaded will weigh around 600 000 tonnes - roughly six times as much as the Prelude FLNG largest aircraft carrier. Some 260 000 tonnes of that weight will consist of steel - around five times more than was

Aker Solutions — Investor Day (December 2012) on 6ix