Noble Energy — Investor Day (November 2011)
188 slides from Noble Energy's investor day presentation, Nov 15, 2011
Slide 1: Noble Energy Analyst Conference November 15, 2011
Noble Energy Analyst Conference November 15, 2011
Slide 2: Forward-looking Statements and Non-GAAP Measures
2 Forward-looking Statements and Non-GAAP Measures This presentation contains certain "forward-looking statements" within the meaning of the "safe harbor" provisions of the Private Securities Litigation Reform Act of 1995. Words such as "anticipates," "believes," "expects," "intends," "will," "shoul
Slide 3: Agenda
3 Agenda November 15 Analyst Conference Company Overview Chuck Davidson Chairman and CEO Operations Summary Dave Stover President and COO Financial Review Ken Fisher SVP and CFO DJ Basin Ted Brown SVP U.S. - Northern Region Marcellus John Lewis VP U.S. - Southern Region Break
Slide 4: Agenda
4 Agenda November 15 Analyst Conference Gulf of Mexico John Lewis VP U.S. - Southern Region West Africa Rodney Cook SVP International Eastern Mediterranean Rodney Cook SVP International Exploration Susan Cunningham SVP Exploration Closing Remarks / Q&A Chuck Davidson
Slide 5: Overview
Overview Chuck Davidson Chairman and CEO
Slide 6: Noble Energy in 2011
Noble Energy in 2011 Positioned for a decade of growth Five Core Areas All with Substantial Growth Each with double-digit production growth Proven reserves projected to increase 150% over 5 years Multiple Major Projects Coming on Stream Starting NOW! Large and Growing Portfolio of High Return Reinve
Slide 7: Key Accomplishments
Key Accomplishments Substantial progress in a short period 1/11 Aseng Online 270 MMBoe Reserves Add $3 B Liquidity 1st Deepwater GOM Permit (Santiago Disc.) Carla Discovery Alen Sanction 7/11 1/12 7/10 U.S. Onshore Deepwater GOM W. Africa E. Mediterranean Tamar Sanction Leviathan Discovery Accelerat
Slide 8: Leveraging Our Recent Accomplishments
Leveraging Our Recent Accomplishments Five-year outlook even better than before Exploration Success and Marcellus Addition Providing New High-return Investment Opportunities 5-year capital investment increased from $13 B to $24 B Projected Production Growth Rate has Increased from 10% to 17% per Yea
Slide 9: Debt-adjusted Growth per Share
Debt-adjusted* Growth per Share Dramatic progress in just one year * Terms defined in appendix Compound Annual Growth Rate Reserves Production Cash Flow 2010 Analyst Day (2010 - 2015) 0.05 0.1 0.18 2011 Analyst Day (2011 - 2016) 0.0001 0.0001 0.0001 Reserves per Share Production per Share Cash Flow
Slide 10: Debt-adjusted Growth per Share
Debt-adjusted* Growth per Share Dramatic progress in just one year * Terms defined in appendix Compound Annual Growth Rate Reserves Production Cash Flow 2010 Analyst Day (2010 - 2015) 0.05 0.1 0.18 2011 Analyst Day (2011 - 2016) 0.18 0.15 0.22 Reserves per Share Production per Share Cash Flow per Sh
Slide 11: Key Outcomes by 2016
Key Outcomes by 2016 Superior operational and financial performance 17% CAGR to 490 MBoe/d 20% CAGR to 2.7 BBoe 5-Yr F&D of $10/Boe Production Reserves Transparent Growth Profile for the Next Decade $1.4 B Free Cash Flow* in 2016 Portfolio Flexibility BTax Cash Margin* Up 15% to $44/Boe ROACE 17% in
Slide 12: Conference Themes
Conference Themes Depth and Quality of Opportunities Material in scale and scope Value of a Diversified Portfolio Retaining flexibility and balance Capacity and Capabilities of Organization Allowing Capture of Full Value Sustainability of Exploration Success Depth and quality of prospect inventory T
Slide 13: Operations Summary
Operations Summary Dave Stover President and COO
Slide 14: Operating Strategy
2 Operating Strategy Focus on Five Core Operating Areas DJ Basin, Marcellus, Deepwater GOM, Eastern Mediterranean and West Africa Convert Discovered Resources to Production Excel on major project execution Accelerate U.S. onshore developments Test Significant Exploration Opportunities Build off succ
Slide 15: Environment, Health and Safety Initiatives
3 Environment, Health and Safety Initiatives Creating value through responsible leadership Global EHS Management System Local Stakeholders Engagement Deepwater Well Control Containment System Participant in Carbon Disclosure Project Comprehensive Water Management Strategy Secure reliable supply Incr
Slide 16: Operational Highlights - U.S.
4 Operational Highlights - U.S. DJ Basin Record well results De-risked Wattenberg horizontal program Accelerating activity levels Marcellus Results already better than expected Activity accelerating Prepared to operate Deepwater GOM Significant near-term production growth Gunflint appraisal proceedi
Slide 17: Operational Highlights - International
5 Operational Highlights - International West Africa Aseng on production with world-class project execution Alen development benefitting from Aseng experiences Testing exploration potential Eastern Mediterranean Tamar on schedule and on budget Appraisal of Leviathan discovery Gas commercialization p
Slide 18: Proved Reserves, Risked and Unrisked Resources
6 Proved Reserves* Risked Resources Unrisked Resources Proved Reserves 1159 1159 1159 Discovered Unbooked 3314 3613 Core Area Exploration 2192 5315 New Play Types 738 3897 14.0 7.4 1.2 Risked Net DJ Basin 1335 Marcellus 1253 Deepwater GOM 641 Eastern Med 2475 West Africa 632 Other 476 New Venture 59
Slide 19: Net Risked Resource
7 Net Risked Resource Substantial growth and de-risking in opportunity set 2008 2010 2011 Proved Reserves 880 870 1159 Discovered Unbooked 871 1318 3314 Core Area Exploration 1198 1995 2192 New Play Types 0 0 738 45% 2.9 7.4 4.2 75% Net Risked Resource (BBoe)
Slide 20: Net Risked Resource Changes Since 2010
8 Net Risked Resource Changes Since 2010 High-quality investment opportunities Proved Proved2 Disc2 Disc Unbooked Core Area Expl New Play Types Other May-10 Resources 0.87 0 0 1.318 1.996 0 Leviathan 4.184 0 0 0 0 0.572 Wattenberg Niobrara 4.756 0 0 0 0.415 Marcellus JV 5.171 0 0 0 0 0 1.253 Other 6
Slide 21: Proved Reserves Outlook
9 Proved Reserves Outlook Increasing 150% over the next five years All-in Reserve Replacement* Proven track record over last 5 years Expecting performance to accelerate 177% 20% CAGR 1.1 2.7 Proved Reserves (BBoe) 400% * Term defined in appendix
Slide 22: Production Outlook
10 Production Outlook Growth in all core areas 2011 2012 2013 2014 2015 2016 Base 198 165 115 91 83 78 Onshore Horizontal 9 35 72 118 163 196 Offshore Major Projects 12 24 49 76 87 150 Other Development 1 30 38 37 43 49 Exploration 1 1 2 5 9 15 17% CAGR MBoe/d Note: Non-core divestitures assumed eff
Slide 23: Onshore U.S. Divestments
11 Onshore U.S. Divestments Results in highly concentrated operations Less than 10% of Global Portfolio 23 MBoe/d of current net production 88 MMBoe net proved reserves ~70% natural gas, 30% liquids Expect to conclude in 2012 Maintaining Focus on Core Areas Reallocating resources to areas where NBL
Slide 24: Volume Profile
12 Volume Profile Maintaining diversified commodity exposure U.S. Contribution Increases from 53% to 66% US Gas Alba Intl Gas WTI Brent 29 15 17 20 19 U.S. Gas Intl Gas WTI 2011 US Gas Int'l Gas Alba Liquids 39 16 6 20 19 U.S. Gas Intl Gas WTI 2016 Brent, LLS Brent, LLS Alba LNG Gas Alba LNG Gas
Slide 25: Capital Investment Outlook
13 Offshore Major Projects Ongoing Development Exploration Other Development East 6361 11280 4023 5034 Capital Investment Outlook Annual organic cash capital* grows from $3 to $5 B Onshore Horizontal Developments Offshore Major Projects Other Development Exploration 2011 2012 2013 2014 2015 2016 2.8
Slide 26: Capital Changes Since 2010
14 Capital Changes Since 2010 Increases driven by success * Term defined in appendix 2010 Analyst Day Marcellus Niobrara Eastern Med Other 2011 Analyst Day Base 2587 4456 Spacer 2587 3601 4309 4455 Plus 746 708 439 Minus 293 Plus 2 268 Horizontal Niobrara De-risked Leviathan Discovery, Eastern Med.
Slide 27: Major Development Project Line-up
15 Major Development Project Line-up High value growth Bubble Size Represents Relative Full-cycle NPV Gas Oil LNG Predominant Product .... Year of First Significant Production
Slide 28: Keys to NBL's Success
16 Keys to NBL's Success Executing Major Projects Leveraging learnings across all projects Clearly Defined Objectives Experienced and Empowered Project Teams Integration across disciplines Partnering with key contractors and suppliers Rigorous and Disciplined Project Management Practices Front-end l
Slide 29: Major Project Impact
17 Major Project Impact Generates significant production and cash flow Projects Projected Net Impact in 2016 Production 340 MBoe/d Operating cash flow* $5 B Free cash flow* $1.6 B Self-funding Over Five Years 2011 2012 2013 2014 2015 2016 Offshore Investment 1.144 0 0.921 0 0.695 0 1.001 0 1.192 0 0
Slide 30: Operations Summary
18 Operations Summary Risked Resources Six Times Proved Reserves Project Execution on Track Reserves Projected to Increase 150% by 2016 Production Projected to More than Double Over the Next Five Years Portfolio Remains Well Balanced and Diversified
Slide 31: Financial Review
Financial Review Ken Fisher, SVP and CFO
Slide 32: Financial Imperatives
2 Financial Imperatives Built capital structure to support business value creation Ensure Ability to Fund Attractive Opportunities Through the Commodity Cycle Long-cycle, long-life major projects Onshore horizontal programs Material organic exploration Proactively Manage Enterprise Risks Maintain Ro
Slide 33: Discretionary Cash Flow Growth
3 Discretionary Cash Flow* Growth Projected 22% CAGR to 2016 2011 2012 2013 2014 2015 2016 DCF 2470 2922 3278 4038 4822 6708 $B * Term defined in appendix
Slide 34: Capital Structure
4 Capital Structure Robust to ensure delivery of value Strong Liquidity... Robust to Commodity Price Cycle Conservative Balance Sheet and Investment Grade Rating Maintain Baa2 / BBB ratings Proactive Funding Strategy Cash on hand and operating cash flow Upsized credit facility Debt market funding En
Slide 35: Financial Position - 3Q 2011
5 Financial Position - 3Q 2011 Moving forward from a position of strength $1.3 B Cash on Hand $3.0 B Liquidity Strong Ratios Debt-to-book capital 34% Net debt-to-book capital 26% Investment Grade Rating Moodys: Baa2 / stable outlook S&P: BBB / stable outlook Favorable Leverage to Peers Notes: Total
Slide 36: Liquidity
6 Liquidity Maintaining strong liquidity Note: Methodology per S&P liquidity descriptors document dated July 2, 2010 Note: Data as of 2Q 2011 NBL A B C D E F Cash as % of Total Assets 0.1065 0.1826 0.04 0.072 0.086 0.07 0.028 Unused Credit Facility as % of Total Assets 0.1465 0.0701 0.18 0.11 0.096
Slide 37: Credit Facility Renewal
7 Credit Facility Renewal Scaled up to meet growth funding needs New Facility Closed During October 2011 $3.0 B facility $1.0 B accordion feature 5-year term International funding capability Attractive, flexible funding source Facility Size to Company Size Correlation 2100000000 3000000000 400000000
Slide 38: 2012 Outlook
8 2012 Outlook Maintaining strong position moving forward 3Q 2011 2012 Projected Liqudity = Cash + Unused Credit Facility Capacity 2952 3396 Q3 2011 2012 Projected Debt-to-cap 0.34 0.32 Net Debt-to-cap 0.26 0.29 FFO-to-debt 0.61 0.68 $B Liquidity* Debt-to-cap and FFO*-to-debt * Terms defined in appe
Slide 39: Enterprise Risk Management
9 Enterprise Risk Management Integrated program across entire company Proactive Program in Place... Identify, Quantify, Prioritize, Manage and Mitigate Key Risks Linked to Key Business Processes Portfolio risks Annual budget / long range plan Exploration / New Ventures Major projects Global drilling
Slide 40: Commodity Hedging
10 NBL Peers NBL Peers NBL Peers % Hedged 0.5 0.37 0.49 0.3 0.35 0.06 Commodity Hedging Proactively hedged through 2013 4Q11 2012 2013 Global Oil NBL Peers NBL Peers NBL Peers % Hedged 0.6000232827 0.44 0.37 0.38 0.25 0.15 4Q11 2012 2013 U.S. Gas Year Downside Protection Ceiling 2011 $80.32 $95.55 2
Slide 41: Cash Flow at Risk Modeling
11 Cash Flow at Risk Modeling Robust across a wide range of business scenarios Monte Carlo Simulation 5,000 scenarios Commodity Price Range Oil: $52 - $195 / Bbl Gas: $2.92 - $8.31 / MMBtu Implied Commodity Price Volatilities Business Scenarios Production uncertainty CAPEX overruns Project delays In
Slide 42: Financial Projections - Liquidity
12 Financial Projections Targeting strong liquidity as company scale grows 2009 2010 2011 2012 2013 2014 2015 2016 Liquidity* 2732 2830 3532 3396 3000 3000 3500 4471 NBL Liquidity Target 1500 1500 2000 2500 3000 3000 3500 4000 $B * Term defined in appendix
Slide 43: Financial Projections - Credit Metrics
13 Financial Projections Maintaining metrics well within investment grade range 2009 2010 2011 2012 2013 2014 2015 2016 Net Debt-to-cap 0.14 0.15 0.28 0.29 0.34 0.37 0.38 0.31 Debt-to-cap 0.11 0.1 0.06 0.03 0.02 0.01 0.01 0.02 Incremental Debt-to-cap Due to Liquidity Targets 0.02 0.02 0.03 2009 2010
Slide 44: Financial Summary
14 Financial Summary Continued Strong Financial Discipline Deploying growth capital at attractive returns Proactively Managing Capital Structure and Business Risks Maintaining Ample Liquidity and Conservative Balance Sheet for Financial Flexibility Well-positioned to Fund Growth and Exploration Prog
Slide 45: Denver-Julesberg Basin
Denver-Julesberg Basin Ted Brown SVP U.S. - Northern Region
Slide 46: DJ Basin
2 DJ Basin Dramatic growth underway Leader in Innovation and Technology Application Significant Resource Potential Now Being Exploited Operational Performance Continues to Improve Defined Development Plan to Accelerate Activity Expanding Niobrara Play into Northern Acreage
Slide 47: NBL's Top Ten Niobrara Breakthroughs
3 NBL's Top Ten Niobrara Breakthroughs A leader in the horizontal play Best Producing Well in Wattenberg Proved Horizontal Viability in Vertically Developed Areas Longest Extended Reach Lateral Record Drill Time Partnered with Industry to Establish New Field Rules Testing 80-acre Density First EcoNo
Slide 48: DJ Basin Position
4 DJ Basin Position Double-digit production growth over next five years Provides Huge Potential Over 840,000 net acres Net risked resources of 1.3 BBoe Significant Future Growth Strong production base of 67 MBoe/d, net with 54% liquids Active vertical and horizontal development programs Expect 15% 5
Slide 49: DJ Basin Resource Opportunity
5 1st Qtr 2nd Qtr 3rd Qtr East 573 964 203 DJ Basin Resource Opportunity Net risked resources increased over 60% to 1.3 BBoe Horizontal Niobrara Driving Growth Further exploitation in vertically developed areas of Wattenberg field Multi-well pads lower cost Extended reach laterals improve F&D Potent
Slide 50: Wattenberg Horizontal Niobrara
6 Wattenberg Horizontal Niobrara Entire area de-risked for development Superior Acreage Position Over 400,000 net acres 58 Producing Wells To-date 18 MBoe/d gross, 14 MBoe/d net All Areas Delivering Positive, Repeatable Results Average EUR of 310+ MBoe Extended Economic Area by 67% Full-scale Develo
Slide 51: Early Results
7 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 Early Results 284.3478261 393.38840
Slide 52: 1/1/2010 1/2/2010 1/3/2010 1/4/2010 1/5/2010 1/6/2010 1/7/2010 1/8/2010 1/9/2010 1/10/2010 1/11/2010 1/12/2010 1/13/2…
8 1/1/2010 1/2/2010 1/3/2010 1/4/2010 1/5/2010 1/6/2010 1/7/2010 1/8/2010 1/9/2010 1/10/2010 1/11/2010 1/12/2010 1/13/2010 1/14/2010 1/15/2010 1/16/2010 1/17/2010 1/18/2010 1/19/2010 1/20/2010 1/21/2010 1/22/2010 1/23/2010 1/24/2010 1/25/2010 1/26/2010 1/27/2010 1/28/2010 1/29/2010 1/30/2010 1/31/20
Slide 53: Recent Results Exceeding Previous Type Curves
9 Note: Wells costs $4.7MM, and reference price case. See appendix. Recent Results Exceeding Previous Type Curves Technical and Operational Learnings Enhancing Economics High Liquid Content Benefits Each Area Liquid Content by Area High GOR Area Core Area Extension Area Crude Oil 0.198 0.432 0.659 N
Slide 54: Wattenberg Horizontal Niobrara Drilling
10 Wattenberg Horizontal Niobrara Drilling Continuous improvement Fit-for-purpose Rigs Spud to Rig Release Down Over 30% Pad Drilling Improving Efficiencies 1Q09 4Q09 1Q10 2Q10 3Q10 4Q10 1Q11 2Q11 3Q11 Spud to RREL 18.44 20.34 17.08 18.6 16.74 15.74 14.87 14.26 12.21 Days Spud to Rig Release Date 1Q
Slide 55: Wattenberg Horizontal Niobrara Field Tests
11 Wattenberg Horizontal Niobrara Field Tests Proof of concepts yield confidence and ability to deliver High Density Areas - No Interference Extended Reach Lateral - Better Capital Efficiency More Frac Stages - Improving Recovery Low GOR Extension Areas - Strong Returns 3D Seismic Data - Understandi
Slide 56: Horizontal Drilling in High Density Areas
12 Horizontal Drilling in High Density Areas Lack of interference proves it is working Greeley
Slide 57: Repeatable Gemini Type Well
13 Repeatable "Gemini" Type Well Substantial potential within vertically developed areas Tanner K33-65HN NBL 100% WI 5,300 ft. lateral with 21-stage completion Drilled between 10 existing vertical wells Encountered original reservoir pressure Heitman 5 UPRC 8F UPRC 7F UPRC 6F UPRC 5F Sandau 12F Webe
Slide 58: Extended Reach Lateral Results
14 Extended Reach Lateral Results Encouraging 20% improvement in F&D costs Wells Ranch AE29 - 68HN NBL Operated with 100% WI Spud to rig release in 17 days 9,120 ft. lateral with 39-stage completion Early Results Suggest 20% Improvement in F&D Cost D&C $7.5 MM EUR indications of 600+ MBoe 10% of Hor
Slide 59: Target Multiple Stacked Pay Zones
15 Target Multiple Stacked Pay Zones Niobrara B and C chalks Codell sandstone Possibly Greenhorn chalks Detailed Subsurface Understanding Identify faults to optimize lateral length and placement Drives a fully integrated development plan Multiple zones, multiple wells per section Capture 3D Over Ent
Slide 60: DJ Basin Niobrara Comparison
16 DJ Basin Niobrara Comparison Niobrara contains significant amounts oil and gas Property Niobrara Eagleford Bakken Depth 5,500 - 8,200 ft. 6,000 - 8,000 ft. 7,000 - 11,000 ft. Thickness 250 - 350 ft. 200 - 300 ft. 75 - 150 ft. Porosity 7 - 12% 4 - 15% 8 - 12% TOC 1.5 - 10% 5% 9% Ro 0.7 - 1.4% 0.5
Slide 61: Historical Wattenberg Development Plan
17 Historical Wattenberg Development Plan Increased vertical density yielded a low recovery factor Conventional Plan of Development - Increase Vertical Well Density Early Approach 32-acre Well Spacing (20 Wells per Section) 2006 COGCC Rule Change Allowed 20-acre Well Spacing (32 Wells per Section) E
Slide 62: Wattenberg Current State
18 Wattenberg Current State Adding horizontal wells with 160-acre spacing X BHL SHL G E M I N I 1% 5% 10% 60% 40% 20% 100% 80% OOIP Recovery Early Success with Gemini in Heavily Drilled Section (18 wells) Demonstrated Repeatability with Over 50 Wells Completed Average EUR 310+ MBoe 2,000+ Locations
Slide 63: Wattenberg Future State
19 1% 5% 10% 60% 40% 20% 100% 80% OOIP Recovery Niobrara Wattenberg Future State Pad drilling, 80-acre spacing and EcoNodes Currently Evaluating Viability of 80-acre Horizontal Well Spacing Piloting 9 horizontal wells in 1 section, 2 pads Testing 300 and 600 ft. lateral spacing Utilizing Multi-well
Slide 64: Drilling Pads with EcoNode Centralized Facilities
20 Drilling Pads with EcoNode Centralized Facilities Providing operational efficiency Efficient Pad Concept with Facilities on Central Site Water Pumped to Well Pads for Drilling and Hydraulic Fracturing Produced Fluids Delivered to EcoNode Facility by Pipeline 8-well pad with EcoNode in background
Slide 65: Wattenberg Horizontal Niobrara Development Plan
21 Wattenberg Horizontal Niobrara Development Plan Addressing the supply chain increases the certainty of execution Approximately 3,900 Potential Locations Rig Count and Completions to Double within Two Years Contracts awarded for new build rigs Dedicated crews and equipment Sand procured Aligned wi
Slide 66: DJ Basin Takeaway Capacity
22 DJ Basin Takeaway Capacity Third parties expanding to meet producer's needs Natural Gas Processing Expansions DCP completed Mewbourn II expansion, next is LaSalle for 100 MMcf/d by mid 2013 Others expected to add 500 MMcf/d of capacity by mid 2014 Incremental NGL transport being developed in conj
Slide 67: Central DJ Basin - Niobrara
23 Central DJ Basin - Niobrara Significant acreage position outside Wattenberg Approximately 440,000 Net Acres Low entry cost - $480 per acre Largely operated by NBL Capitalizing on Industry Knowledge to Expand Success Continue to Appraise N. Colorado and S. Wyoming Drill 2 wells in 4Q 2011 Plan for
Slide 68: DJ Basin Production Outlook
24 DJ Basin Production Outlook Liquids content and horizontal activity drives growth Horizontal Production Increases Nine Times Liquid Production Doubles 2012 - 2016 Capital $8 B Horizontal Vertical Other East 5329 1888 840 Horizontal Other Vertical 2011 38% 16% 46% 2016 53% 13% 34% Product Mix Crud
Slide 69: DJ Basin Positioned for dramatic growth
25 DJ Basin Positioned for dramatic growth 1.3 BBoe of Net Risked Resources Horizontal Resource Potential Could Increase Through Tighter Well-spacing Increase Niobrara recovery to 6 - 12% OOIP Production Doubles in Five Years Liquid Percentage Climbs to Over 65% Leader in Innovation and Technology A
Slide 70: Marcellus
Marcellus John Lewis VP U.S. - Southern Region
Slide 71: Marcellus
2 Marcellus Great strategic fit for NBL High-quality, Well-positioned Asset Lowest cost U.S. gas play Innovative JV Structure and Aligned Partner Manageable Multi-year Development Plan Operating results already showing improvement Ready to initiate NBL operations and transfer multi-disciplinary expe
Slide 72: Marcellus JV Position
3 Marcellus JV Position Significant scale and impact Large Acreage Position Within Marcellus Fairway 50% of 628,000 net acres Located in both wet and dry gas windows High NRI (~88%) 87% of Acreage Held by Production Allows flexibility in development and lowers cost Requires fewer permits and smaller
Slide 73: Benefits of Partnering with CNX
4 Benefits of Partnering with CNX Built in efficiencies to jump-start operations Well-established Appalachian Operator Experienced Land and Permitting Staff Excellent Safety and Environmental Record Unique Synergies Coordinated Long-term Development in Coal Areas Access to existing water supply sour
Slide 74: Marcellus Sweet Spot
5 Marcellus Sweet Spot Initial activity concentrated in SW PA Industry Recognized Sweet Spot in SW PA Key Geologic Attributes Systematic Development and Expansion Adds Efficiency Continue to Test Other Acreage for Future Development SW PA Sweet Spot Dry Gas Wet Gas
Slide 75: Early Results Exceeding Expectations
6 Early Results Exceeding Expectations New pad adding significant production Hutchinson 10-well Pad Initial production rates 5 - 12 MMcf/d 5 wells 5 - 8 MMcf/d 5 wells 9 - 12 MMcf/d Potentially Extends Sweet Spot Further North Pad Location SW PA Sweet Spot Dry Gas Wet Gas
Slide 76: Marcellus Well Results Comparison
7 Marcellus Well Results Comparison CNX wells improving, now exceeding industry average CNX Wells in SW PA Yield 21% More Production Over 500 Days Mcf/d Gross Wellhead Gas Production CNX Avg. 2010-2011 (39 laterals ~2,859 ft.) Comp. Avg. 2009-2010 (103 laterals ~2,800 ft.) CNX Avg. 2008-2009 (13 lat
Slide 77: Marcellus Individual Well Economics
8 Marcellus Individual Well Economics Innovative deal structure maintains returns at low gas price 2.5 3 3.5 4 5 6 7 7.5 SW PA Dry (6 Bcf) 10.2 15.8 21.8 SW PA Dry (7 Bcf) 14.9 21.9 29.3 SW PA Dry 6 Carry 12.4 21.1 31 41.9 SWPA Dry 7 Carry 17.4 28.5 41 56 No Carry Carry Note: Assumes $6 MM well cost
Slide 78: Marcellus Drilling and Completion Cost
9 Marcellus Drilling and Completion Cost Lateral lengths increasing while gaining efficiencies 2009 2010 2011 Lateral 2200 2400 3850 Drilling 200 190 166 Completion 300 235 220 Lateral Length Ft. 2009 2010 2011 Lateral 2200 2400 3850 Drilling 200 190 166 Completion 300 235 220 17% Improvement $/Ft.
Slide 79: Marcellus JV Work Process
10 Marcellus JV Work Process Utilize major project expertise Long-term, Systematic Approach Joint rolling 3-year plans Systematic development of wells and infrastructure Semi-annual Best Practices Workshops Defined joint technical committees Set targets for improvement Ongoing knowledge transfer to
Slide 80: Marcellus JV Drilling Plan
11 Marcellus JV Drilling Plan Controlled and steady ramp-up 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 CNX 103 148 198 221 236 236 236 236 236 236 NBL 37 79 120 133 141 141 141 141 141 141
Slide 81: NBL's Near-term Drilling Plan
12 NBL's Near-term Drilling Plan HBP and fee acreage enables efficient development Focused Infrastructure Development Pad Drilling Locations Identified Through 2015 2012 39 wells drilled with 1 rig ramping to 3 rigs 2013 81 wells drilled with 3 rigs ramping to 4 rigs Marshall County Washington Count
Slide 82: CNX's Near-term Drilling Plan
13 CNX's Near-term Drilling Plan Pad drilling for efficiency and cost control N Nineveh 2 N Nineveh 1 Morris Rutan CNX's 2012 and 2013 Drilling Program Focused on Greene and Washington Counties in PA Water and Gathering Lines Connect with NBL Operated Area OH PA WV MD VA Wet Gas Dry Gas
Slide 83: Water Sourcing Plan for SW PA
14 Water Sourcing Plan for SW PA Supply established and infrastructure build out underway Sufficient for 16 Frac Stages per Day Moving Water by Pipeline Reduces environmental and safety risk Smaller activity footprint Improves efficiency of completion operations Lowers overall costs External source
Slide 84: Gas Gathering System Plan for SW PA
15 Gas Gathering System Plan for SW PA Systematic expansion to stay ahead of drilling activity Gas Gathering System Installed or Under Construction to Support 2012 Drilling Pad Drilling Allows for Lower Number of Permits, Efficiency and Reduced Costs Early Infrastructure Development Creates Backbone
Slide 85: NBL's Impact on JV
16 NBL's Impact on JV Applying our core competencies and transferring learnings Experience with Wattenberg Unconventional Reservoirs Integrated Subsurface Approach Project Management Skills Supply Chain Management Complementary EHS Culture
Slide 86: NBL Operational Readiness
17 NBL Operational Readiness Prepared for operations January 1 Opened Office in Canonsburg, PA Core Operations Staff on the Ground Designed Organization and Processes Using Wattenberg Best Practices Service Contracts Established and Long-lead Material Ordered First Operated Rig Starts in January Lev
Slide 87: 2011 Marcellus JV Production
18 2011 Marcellus JV Production Net NBL production has doubled since initial announcement MMcf/d Announcement Closing Today Year-end MMcf/d 35 50 69 82 Announcement 8/18/2011 Closing 9/30/2011 Today 11/15/2011 Projected 12/31/2011 Net Production 35 50 69 ~ 80
Slide 88: Marcellus JV Production Outlook
19 Marcellus JV Production Outlook Rapid growth with long plateau 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 CNX and NBL 39 103 241 420 610 763 898 903 891 921 942 NBL Net Production MMcfe/d 2012 - 2016 Capital $6 B Drilling Carry Facilities Other Capital 4061 1350 468 165 Facilities Dri
Slide 89: Marcellus
20 Marcellus Fifth impact area for NBL Unique Opportunity in Lowest Cost Gas Play Synergies and Alignment Between CNX and NBL Enhances Value Net Production Reaches 600 MMcfe/d in 2015 7.4 Tcfe of Net Risked Resources and Growing Operational Learnings will Improve Results Over Time
Slide 90: Gulf of Mexico
Gulf of Mexico John Lewis VP U.S. - Southern Region
Slide 91: Gulf of Mexico
2 Gulf of Mexico NBL committed to the deepwater Deepwater Returning to a "New" Normal NBL Led the Industry Back Progress Occurred on Numerous Fronts During the Moratorium Development Projects Will Soon Deliver Significant Value Exploration Portfolio is Robust and has Matured
Slide 92: Deepwater Gulf of Mexico
3 Deepwater Gulf of Mexico A "New" normal A "New" normal A "New" normal
Slide 93: Deepwater Gulf of Mexico: NBL led the industry back
4 Deepwater Gulf of Mexico NBL led the industry back NBL Industry Firsts Post Macondo 1st blowout preventer certification 1st completion permit 1st drilling permit 1st new production from exploration (Santiago) Organized and Led the Development of Helix Subsea Containment System (HWCG) Solicited and
Slide 94: Galapagos Subsea Development
5 Galapagos Subsea Development Significant progress in the last year 132 MMBoe Gross Resources 36 MMBoe, net NBL 29% Average WI Operates Santa Cruz and Santiago Accomplishments Over the Last Year Drilled the Santiago discovery well Preformed completions at Isabela and Santa Cruz Advanced host facili
Slide 95: Galapagos Field Layout
6 NaKika Isabela Santiago Santa Cruz Galapagos Field Layout Subsea tieback development 6,500 ft. water depth Dual 8 in. pipe-in-pipe flowlines Initial 3-well development
Slide 96: Galapagos Production Outlook
7 Galapagos Production Outlook Sustained production plateau Net Production 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2010 Base 5.069 8.557 9.809 8.965 11.633 11.438 9.406 7.593 8.271 7.197 2.997 Base Case 0 9.244 8.136 11.024 9.41 12.798 10.558 8.604 7.086345426
Slide 97: Galapagos Project Economics
8 Initially Three Well Subsea Tieback Base Case Economic Summary Net resources 36 MMBoe Net capital $462 MM F&D $12.70/Boe AT ROR 41% Life cycle AT NPV10 $0.8 B Point forward AT NPV10 $1.1 B Upside Recovery Adds 15 MMBoe net resources and $0.6 B AT NPV10 Galapagos Project Economics Strong cash flow
Slide 98: Galapagos Additional Resource Potential
9 Galapagos Additional Resource Potential Complementary follow-on upside Four Offsets Identified To-date Oil and gas potential 40 MMBoe gross mean resource potential Shallow Zone Upside Discovered in Santa Cruz Confirmed as oil in Santiago 25 MMBoe gross mean resource potential MC 562 MC 563 MC 519
Slide 99: Gunflint Discovery
10 Gunflint Discovery NBL's largest GOM find to-date NBL Operated with 26% WI Complex Subsalt Miocene Structure Encountered Over 550 ft. of Net Pay High-quality Sands Porosity 20 - 26% Permeability 200 - 1,000 millidarcy Progress Made in the Last Year Signed unitization agreement Advanced appraisal
Slide 100: Gunflint Well Log
11 M-53 M-48 M-50 M-54 Gunflint Well Log Over 550 ft. of net pay
Slide 101: Gunflint Discovery
12 Gunflint Discovery Finalized equity determination Interest Holders in All Gunflint Area Blocks Agreed to Final Joint Equity NBL Designated as Operator with 26% WI Added Blocks 992 and 993 to the Project Area Advantages to Early Equity Agreement Saves 1 - 2 years of post appraisal negotiations pri
Slide 102: Gunflint Appraisal Program
13 Gunflint Appraisal Program Determining the ultimate size Gross Resources of 70 - 500+ MMBoe Appraisal Activity First appraisal well to spud in December 1 - 2 additional wells to fully evaluate Scalable Development Plan Economically viable with existing discovered resources Front-end conceptual st
Slide 103: Gunflint Production Outlook
14 Gunflint Production Outlook Significant impact 2016 2017 2018 2019 2020 2021 250 MMBoe Case 34.6 29.2 23.3 17.8 12.8 8.3 520 MMBoe Case 0 5.7 11.7 17.2 22.4 26.7 MBoe/d Net Production Facility Limited
Slide 104: Gunflint Economics
15 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Base AT Cash Flow* 513 483.5 383.3 301.5 222.7 146.9 Base Cum AT Cash Flow -0.043 -0.043 -0.046 -0.077 -0.143 -0.285 -0.477 -0.699 -0.186 0.297 0.68 0.982 1.205 1.352 Upside Recoveries Cash Flow 0 0 0 0 0 0 -0.699 110 265.4 360
Slide 105: Deep Blue Prospect
16 Deep Blue Prospect Sidetrack data being reviewed NBL Operated with 33.75% WI Original Well Encountered Hydrocarbons Multiple high-quality reservoirs Excellent hydrocarbon fluid properties Sidetrack has Reached Total Depth Found high-quality reservoirs Additional hydrocarbons encountered Louisiana
Slide 106: Deepwater GOM Prospect Inventory
17 Deepwater GOM Prospect Inventory Focus on subsalt Miocene 0 - 100 101 - 200 201 - 530 0 - 100 101 - 200 201 - 530 Structure Amplitude Prospect Gross Size (MMBoe) 39 prospects 2 BBoe net unrisked mean resources 500+ MMBoe net risked mean resources
Slide 107: Deepwater GOM Exploration Value
18 Development ScenarioPrimary Prospect Type Total Portfolio Subsea Tieback Amplitude Play Subsea TiebackSubsalt Miocene Stand AloneSubsalt Miocene Number in NBL's Portfolio 39 9 7 23 Total Gross Unrisked Mean Potential (BBoe) 6.0 0.5 0.6 4.8 Average Chance of Drilling 59% 37% 36% Prospect Class Tot
Slide 108: Deepwater Exploration Prospects for 2012 and 2013
19 Deepwater Exploration Prospects for 2012 and 2013 Multiple options for one-rig program Amplitude Subsalt Dirac Sailfish Troubadour Big Bend Floreana Silvergate Genovesa Talon Palladium Ness Deep Top Aleutian Madison Clingmans Dome Dantzler 6 amplitude with 32 MMBoe net risked resources 8 subsalt
Slide 109: Deepwater GOM Production Outlook
20 Deepwater GOM Production Outlook Development and exploration growth contributors 2011 2012 2013 2014 2015 2016 Base 14173 8600 1615 1661 3875 1362 Development 536 2722 1864 1102 970 263 Galapagos 0 8295 7575 10350 16179 14783 Exploration tiebacks 0 0 1593 5860 7329 Gunflint 0 34638 Net Production
Slide 110: Gulf of Mexico: Converting resources to value
21 Gulf of Mexico Converting resources to value NBL Excels as an Explorer in the Deepwater Deepwater Major Projects Build Off International Learnings and Processes to Deliver Execution Excellence Two Development Projects Online in 2012 Contributing 13 MMBoe/d, Net Nearly 500 MMBoe Net Risked Potenti
Slide 111: West Africa
West Africa Rodney Cook SVP International
Slide 112: West Africa
2 West Africa Building long-term value Existing Core Assets Providing Strong Cash Flows Initial Major Projects Focused on Liquid Developments Demonstrating Best-in-class Project Management Capabilities Additional Upside in Douala Basin Progressing Regional Gas Monetization Plans
Slide 113: West Africa: Key position of value for NBL
3 West Africa Key position of value for NBL West Africa Bioko Island Cameroon Block O 45% WI Block I 38% WI YoYo Mining License 50% WI Alba Field 34% WI Methanol Plant 45% WI LPG Plant 28% WI Equatorial Guinea Tilapia PSC 50% WI
Slide 114: Alba Field
4 Alba Field Base asset with strong cash flow Current Net Volumes 20 MBbl/d, 244 MMcf/d 2010 Net Reserves 59 MMBbl Liquids, 869 Bcf Natural Gas Natural Gas Commercialized with LPG Processing and Sales to Methanol and LNG Plants Low Unit Costs LOE: $3.55/Boe DDA: $2.10/Boe * Term defined in appendix
Slide 115: West Africa Operated Discoveries
5 West Africa Operated Discoveries Setting the stage for growth 305 MMBoe Net Discovered Resources 111 MMBbl liquids and 1.17 Tcf gas High deliverability reservoirs Project Lineup Aseng - first oil November 2011 Alen - sanctioned, first oil 4Q 2013 Diega - evaluating development options Carla - rece
Slide 116: Aseng Field
6 Aseng Field Breakthrough execution increases project value Development Cycle Times Discovery to production less than 5 years Sanction to production under 3 years First Oil Seven Months Ahead of Schedule Value enhancement of $80 MM net AT NPV10 First oil November 6, 2011 Capital Investment 13% unde
Slide 117: Aseng Field Layout
7 3,000 ft. water depth Two, four-slot manifolds Four production risers Gas lift provided in umbilicals Aseng Field Layout Seven months ahead of schedule
Slide 118: Aseng Project Philosophy
8 Aseng Project Philosophy Achieving a breakthrough outcome Proven Project Management Team Cohesive and Fully Integrated Technical Organization Win-win Incentive Programs with Suppliers Extensive Pre-planning and Testing Proactive Safety Programs Rigorous Cost Control and Scheduling Extensive Peer R
Slide 119: Aseng Safety Performance
9 Over 10.5 MM man hours with no major accidents Total recordable incident rate (TRIR) of 0.21 Only 408 total man hours lost for all incidents Aseng FPSO Safety Award Ceremony Best-in-class safety record in all aspects of the project
Slide 120: Aseng Project Philosophy - Subsurface
10 Aseng Project Philosophy - Subsurface Disciplined front-end loading yields world-class execution Rigorous Appraisal Program Evaluate, test, core and sample appraisal wells early in program Appraisal and Development Programs Reduced Uncertainty and Optimized Well Placement for Ultimate Recovery 3
Slide 121: Aseng Subsurface Results
11 Aseng Subsurface Results Resource estimate growing with development 43 MMBbl Net Resource for Oil Recovery Phase 128 Bcf net gas resource Five Horizontal Producers, Three Water and Two Gas Injectors Pressure Maintenance System to Maximize Recovery High Deliverability Reservoir Requires Fewer Well
Slide 122: Aseng FPSO
12 Aseng FPSO On location in Equatorial Guinea 1,089 ft. long and 184 ft. wide 80 MBbl/d oil treating capacity 120 MBbl/d total fluids production 150 MBbl/d water injection 160 MMcf/d gas injection 170 MMcf/d gas production 1.6 MMBbl storage
Slide 123: Aseng Production Outlook
13 2012 2013 2014 2015 2016 17.096 17.03 15.241 14.09 12.06 MBbl/d Net Crude Oil Production Aseng Production Outlook Providing immediate value-added growth
Slide 124: Aseng Economics
14 Aseng Economics Strong cash flow generation Economics Summary Net resources 43 MMBbl Initial rate 17 MBbl/d, net Net capital $0.5 B F&D $11/Bbl LOE $21/Bbl (includes FPSO lease cost of $10.50/Bbl) No value assigned to natural gas Life cycle AT NPV10 $1.1 B Point forward AT NPV10 $1.8 B Upside Per
Slide 125: Transferring Aseng's Learnings
15 Transferring Aseng's Learnings Ensuring success at Alen, Tamar, Leviathan and Gunflint Appraisal Disciplined appraisal program designed to address geologic complexity Planning Cohesive multi-discipline teams with cradle-to-grave approach Early concept selection with thorough regional selection pr
Slide 126: Alen Field Layout
16 Alen Field Layout Designed as regional gas hub Platform water depth 238 ft. 40 MBbl/d liquid handling 440 MMcf/d gas reinjection 50,000 hp of compression Deck lift weight 11,400 tons Quarters for 84 people
Slide 127: Alen Project
17 Alen Project Liquid-rich development Project Sanctioned December 2010 Operated by NBL with 44.7% WI, post unitization On Schedule for First Production in 4Q 2013 Initial rate 37 MBbl/d gross, 20 MBbl/d net Resource Estimate Increased to 264 MMBoe Gross 83 MMBoe, net (34 MMBbl liquids) Implementin
Slide 128: Alen Drilling and Subsurface Plans
18 Alen Drilling and Subsurface Plans Maximizing reservoir productivity 34 MMBbl Net Liquid Resources 295 Bcf net gas resources High Deliverability Reservoir Avg. permeability 2 darcy Avg. porosity 25% Able to Increase Liquids Recovery Optimize placement of the 3 producers, 3 gas injectors Utilize g
Slide 129: Alen Project
19 Alen Project Wellhead jacket installation complete Wellhead jacket installed Wellhead platform under construction
Slide 130: Alen Development Timeline
20 Alen Development Timeline On schedule and on budget First Production Hookup and Commissioning Subsea Infrastructure and Delivery Development Drilling and Completions Wellhead Module and Central Production Platform Wellhead Jacket Project Sanction Plan of Development and FEED Work 2011 2012 2013 P
Slide 131: Alen Production
21 2013 2014 2015 2016 2017 5.217 16.132 13.953 12.175 10.611 MBbl/d Net Crude Oil Production Alen Production Early liquids production with gas-cycling
Slide 132: Alen Economics
22 Alen Economics Strong cash flow contributor Economics Summary Net resources 34 MMBbl Initial rate 37 MBbl/d gross, 20 MBbl/d net Net capital $0.7 B F&D $21/Bbl LOE $8.50/Bbl No value assigned to natural gas Life cycle AT NPV10 $0.7 B Point forward AT NPV10 $1.1 B * Term defined in appendix Note:
Slide 133: West Africa - Exploration
23 West Africa - Exploration Replenished inventory of high-quality prospects Superior Knowledge in the Douala Basin 1.5 MM gross acres largely under-explored Extensive seismic coverage Continuing to Mature Deeper Oil Opportunities Net Unrisked Resources of 448 MMBoe in Douala Basin Current Activity
Slide 134: Next Developments
24 Next Developments Production growth enhances value Diega Five wellbores encountered oil and gas Gross resource range 45 - 110 MMBoe, 60% liquids Carla Discovery below Alen field Gross resource range 35 - 100 MMBoe, 80% liquids Subsea Tieback to Aseng Production Growth 2015 and Beyond Next Steps..
Slide 135: West Africa Production Outlook
25 West Africa Production Outlook Doubling liquids production in three years 1/1/2010 1/1/2011 1/1/2012 1/1/2013 1/1/2014 1/1/2015 1/1/2016 1/1/2017 Alba Liquids 19.9 19.7 18.1 18 14.7 13.3 14.4 12.7 Aseng 1.2 17.1 17 15.2 14.1 12.1 9.3 Alen 5.1 16.2 14 12.2 10.6 Diega 2.1 4 3.25 MBbl/d Net Liquids
Slide 136: Regional Gas Monetization Outlook
26 Regional Gas Monetization Outlook Developing LNG options with governments Approximately 4 Tcf of Gross Natural Gas Resources to Monetize NBL Leading Effort to Create LNG Export Hub in EG Low cost expansion of existing plant Evaluation of available alternatives due YE 2011 SNH / GdF Suez Studying
Slide 137: West Africa: High-impact core area
27 West Africa High-impact core area Leading Operator in the Douala Basin Liquid Projects Producing 46 MBbl/d and Generating ~$1.2 B of AT Annual Cash Flow by 2014 Point forward AT NPV10 of $2.9 B (Aseng and Alen only) Liquid production more than doubles over next two years Project Management Skills
Slide 138: Eastern Mediterranean
Rodney Cook SVP International Eastern Mediterranean
Slide 139: Eastern Mediterranean
2 Eastern Mediterranean A new global gas basin unveiled Best-in-class Operations Providing Reliable Gas Supplies to Israel Tamar Development Rapidly Progressing Leading Operated Position in the Greater Levant Basin Significant additional potential Pursuing LNG Export Options
Slide 140: Eastern Mediterranean Existing asset position
3 Eastern Mediterranean Existing asset position Net Discovered Resources over 8.5 Tcf 1.7 Tcf booked reserves (Tamar) Production, Development Base Mari-B continues to produce with high reliability Noa development adds deliverability in 2H 2012 Tamar on schedule Appraising Leviathan Cyprus A Drilling
Slide 141: Mari-B Field
4 Existing Pipeline Planned Pipeline Mari-B Field Reliable and low cost operations Safe, Reliable Operations Nearly 100% reliability since startup in 2004 Sales Driven by Market Demand Record daily, quarterly and annual sales in 2011 Outstanding Field Performance ~750 Bcf produced to-date Low-cost S
Slide 142: Mari-B Sales Deliverability
5 Mari-B Sales Deliverability Late life decline partly offset with Noa Note: Forecast assumes no curtailment of maximum production at Mari-B Gross Capacity MMcf/d Mari-B wells 9 and 10 Online Compression Noa Online Tamar Online Mari-B wells Decline
Slide 143: Tamar Field Layout
6 Tamar Field Layout Phase 1 maximum deliverability of 1 Bcf/d Tamar Mari-B 5 Subsea Wells Gas Injection at Mari-B for swing sales
Slide 144: Tamar Project
7 Tamar Project Moving ahead on an accelerated timeline Project Sanctioned in 2010 Operated by NBL with 36% WI Adjusted for a Change to the Onshore Delivery Point Remains on Schedule and on Budget All Major Contracts Awarded and Numerous Activities in Progress Resource Estimate Continues to Increase
Slide 145: Tamar Subsurface Update
8 Tamar Subsurface Update Resource estimate growing with development Mean Resource Estimate Grows from 8.4 Tcf to 9.0 Tcf Appraisal drilling Petrophysical analysis Initial Development 6.5 Tcf Gross, 2 Tcf Net Reserves booked to-date 5.4 Tcf gross, 1.7 Tcf net Superior Quality Reservoir Clean sand wi
Slide 146: Tamar Development Progress
9 Tamar Development Progress Delivering a world-class project Over 3.6 MM Man Hours with Best- in-class Safety Record No major accidents, TRIR of 0.16 Project Activity Jacket fabrication 50% complete Platform deck 53% complete Pipe lay 55% complete Onshore facility expansion underway Spare Key Equip
Slide 147: Tamar Project Schedule
10 Tamar Project Schedule Progressing as planned First Production Platform Installation Subsea Infrastructure and Delivery Drilling and Completions Mari-B Brownfield Project Sanction 2011 2012 2013 Project Phase 2010 Platform Construction Onshore Terminal Modification Hookup and Commissioning Today
Slide 148: Tamar Gas Sales
11 Tamar Gas Sales Underpinned by a growing gas market Growing Israel Domestic Gas Demand 1,440 MW of Coal-fired Power Conversion to Natural Gas Already Announced Potential for ~1 Bcf/d of incremental demand by converting coal-fired generation to gas In Final Stages of Negotiation with Israel Electr
Slide 149: Israel Gas Demand Outlook
12 Israel Gas Demand Outlook Robust growth outlook with significant upside potential Base Demand Growth Driven by Power Generation and Industrials Potential for Converting Coal-fired Power Generation to Gas Source: Poten and Partners, Israel MNI, Israel Electric, NBL analysis Annual Average Natural
Slide 150: Tamar Phase Economics
13 Tamar Phase 1 Economics Significant value creation Summary Economics Net reserves 2 Tcf Production plateau over 15 years Net capital $1.1 B F&D $0.60/Mcf LOE $0.30/Mcf 2013 2014 2015 2016 2017 2018 2019 2020 361 651 718 900 900 900 900 900 2004 2005 2006 2007 2008 2009 2010 3Q11 2.71 2.68 2.72 2.
Slide 151: Leviathan Project
14 Leviathan Project World's largest offshore gas discovery in 2010 Discovered YE 2010 NBL operated with 39.66% WI Third Successful Test of Tamar Sand Reservoir in Basin High Quality Reservoir Clean sand with 500 millidarcy permeability and 21% porosity Resource Estimated at 16 Tcf Gross, 5.6 Tcf Ne
Slide 152: Leviathan Commercialization Options
15 Project and Commercial Teams in Place Developing Commercialization Options Israeli domestic market Evaluating early production scenarios Exports via LNG or pipelines Screening Field Development Concepts Subsea tieback to shallow water platform Semi-submersible FPSO Floating LNG Incorporating Tama
Slide 153: Eastern Mediterranean Exploration
16 Eastern Mediterranean Exploration Leading acreage position in an emerging basin Significant Remaining Exploration Potential 12 prospects identified in Tamar sands with unrisked potential over 20 Tcf gross 3.7 BBoe gross unrisked potential in deep oil play Current Activity Cyprus A - drilling Dolp
Slide 154: Post Japan Earthquake Global LNG Demand
17 Post Japan Earthquake / Tsunami Resulting in Increase in Global Gas or LNG Demand Gas to substitute for nuclear power Asia Pacific will pull available LNG supplies to meet incremental demand Global LNG Demand Growth Source: Poten & Partners Increase in Future Global LNG Demand Leviathan-sized res
Slide 155: Eastern Mediterranean LNG
18 Eastern Mediterranean LNG Natural gas export options look encouraging Compelling Case for Natural Gas Exports Government revenues Existing discovered resources exceeds projected domestic needs Additional exploration potential remains Anticipation of export potential will encourage more exploratio
Slide 156: Eastern Mediterranean: World-class portfolio and potential
19 Eastern Mediterranean World-class portfolio and potential Mari-B Continues to Reliably Supply Local Natural Gas Markets Over 8.5 Tcf of Net Resources Discovered Tamar Development on Track for Commissioning Late 2012 Forecasted Israel Natural Gas Base Annual Demand Growth of 10% with Significant U
Slide 157: International Production Outlook
20 International Production Outlook Over a decade of underpinned growth 2012 - 2016 Capital $6.4 B 15% CAGR Over Next Decade from Current Assets and Existing Discoveries* * Excludes Alba LNG Gas, Carla and Cyprus 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Base 61.5 57.6 42.4 25.5 21.8 21
Slide 158: Exploration
Exploration Susan Cunningham SVP Exploration and Business Innovation
Slide 159: Noble Energy Exploration
2 Noble Energy Exploration Leading explorer in the industry The Drivers of Our Success The Results of Our Efforts Greater Potential in the Next Five Years It's repeatable It's sustainable
Slide 160: Exploration and Geoscience Excellence
3 Exploration and Geoscience Excellence Drivers of our success Focused on Identifying Impactful Opportunities with Running Room Applying leading edge technologies throughout program lifecycle Recruiting and retaining high-quality talent Leveraging exploration success Designed Disciplined Processes f
Slide 161: NBL Results Over the Last Five Years
4 NBL Results Over the Last Five Years Exploration process yielded significant discovered resources Discovered Nearly Two BBoe ~2 times 2010 reserves ~25 times annual production Tripled Resource Inventory to Over Nine BBoe Net Unrisked Created Two Core Areas Through Exploration 2006 2007 2008 2009 2
Slide 162: Exploration Success
5 Exploration Success Outperformed peers and super majors from 2006 ^ 2010 Low Finding Cost Moving Resources to Production Quickly ~35% of Expected Production in 2021 Will be from Discoveries Made from 2006 - 2010 Source: Wood Mackenzie 0.25 4.57 1 0.42 3.09 1 0.31 3.13 1 0.41 5.43 1 0.31 0.97 1 0.4
Slide 163: North America Onshore Exploration
6 North America Onshore Exploration Converting ideas into core areas Strategy Focus on liquid-rich unconventional resource plays Leverage learnings, skill sets and best technical practices Early technical investment in exploration to maximize value and identify the sweet spot Investment decisions in
Slide 164: Goshen DJ Basin
7 Goshen DJ Basin Defining the sweet spot in the Niobrara What We Did Acquired over 1,700 sq. mi. of 3D seismic Cut over 3,400 ft. conventional core Drilled exploratory horizontal programs outside of Wattenberg Doubled acreage position What We Know Rock properties variable across basin Multiple Niob
Slide 165: Deepwater Gulf of Mexico 2006
8 Deepwater Gulf of Mexico 2006 Moving to impact opportunities What it Looked Like Four discoveries, two producing Exploited subsea tieback portfolio Amplitude play was 50% of inventory Narrow Azimuth 3D What We Knew Subsalt imaging technology improving High-quality Miocene reservoirs More sand than
Slide 166: Deepwater Gulf of Mexico 2011
9 2006 2011 Deepwater Gulf of Mexico 2011 Integrating technologies and knowledge is the key What We Did Doubled technical staff Grew subsalt inventory Amplitude play is 25% of inventory Moved to wide azimuth 3D Proprietary reprocessing Ramped up regional work during moratorium Focused on Miocene, no
Slide 167: Deepwater Gulf of Mexico 2012-2014 program candidates
10 Blind Faith Field ~ 100 MMBOE Thunderhorse Basin Salt Middle Miocene 18300 18100 Deepwater Gulf of Mexico 2012 ^ 2014 program candidates Amplitude Prospect 55% WI Water depth 7,200 ft. Pg 54% P75 - P25: 20 - 60 MMBoe gross resources Multiple Subsalt Options Rigorously working maturation of subsal
Slide 168: International: Where's the next game-changer?
11 International Where's the next game-changer? Strategy Focus on high-impact game-changers Leveraging core competencies and learnings Execute superior evaluation process Ability to operate Plan for success What We Did Expanded in Israel and Equatorial Guinea Set up new ventures group Entered Cyprus
Slide 169: Eastern Mediterranean 2006
12 Eastern Mediterranean 2006 1 TCF discovery but limited exploration potential What it Looked Like Sales from first commercial gas discovery (Mari-B) began in 2004 Farmed into Tamar and Dalit concessions mid year 2006 Previous operator exited What We Knew Biogenic gas above salt in Mari-B Reservoir
Slide 170: Eastern Mediterranean 2011
13 Eastern Mediterranean 2011 "More gas than we dreamed of.... oil to be tested" What We Did Captured acreage for running room Acquired proprietary 2,450 mi. of 2D and 2,500 sq. mi. 3D seismic 25 Tcf discovered in three prospects What We Know High-quality reservoirs Biogenic gas above and below salt
Slide 171: Cyprus A Prospect
14 Cyprus A Prospect Largest prospect currently being drilled Summary First well offshore Cyprus NBL operated with 70%* WI 5,500 ft. water depth P75 - P25: 3 - 9 Tcf gross resources 60% probability of success Results impact other leads currently being evaluated 3D Prospects Discoveries *Pending assi
Slide 172: Tanin Prospect
15 Tanin Prospect To be drilled in the Alon A lease, Israel Pre-drill Summary NBL operated with 47% working interest 5800 ft. water depth P75 - P25: 0.8 - 1.2 Tcf Gross Resources 55% probability of success Additional upside possible in area, dependant upon well results Tanin-1 Tanin This area intent
Slide 173: Offshore France
16 Offshore France Building on Eastern Mediterranean knowledge Large Inventory of Structural Prospects and Leads in Rhone Maritime Block Evidence of Potential Gas Reservoirs Final Processing Still to Come Possible 3D Seismic in 2012 Summary NBL operated with 72.5% WI 5,200 - 8,500 ft. water depth 2.
Slide 174: West Africa - Douala Basin 2006
17 West Africa - Douala Basin 2006 High risk stratigraphic play with running room What it Looked Like No nearby wells Belinda gas discovery What We Knew Virtually unexplored basin east of Bioko Island Unproven hydrocarbon basin AVO supported prospects Excellent deepwater sand reservoir Play potentia
Slide 175: West Africa - Douala Basin 2011
18 West Africa - Douala Basin 2011 Multiple discoveries - significant oil potential What We Did Shot 825 sq. mi. 3D Reprocessed 2,285 sq. mi. 3D Established acreage position in Cameroon 6 significant discoveries Created a core area What We Know Stratigraphic traps prolific Multiple productive, high-
Slide 176: Carla Discovery
19 Carla Discovery Expanding West Africa development portfolio Summary AVO supported target below Alen field Drilled to a depth of 11,500 ft. with deepening of Alen development well Encountered oil in high-quality Upper Oligocene interval sands filled to base of sand NBL operated with 51% WI 1,900 f
Slide 177: Cameroon - Bwabe Prospect
20 Cameroon - Bwabe Prospect Largest oil prospect to-date Pre-drill summary Amplitude supported Oligocene oil target NBL operated with 50% WI 1,800 ft. water depth 100+ MMBoe gross resources 25% probability of success Information gained will impact other prospects and leads
Slide 178: Bouma Prospect
21 Bouma Prospect West Africa Exploration Pre-drill Summary AVO supported target Prospect identified from newly acquired Cameroon 3D seismic NBL operated with 50% WI 1,600 ft. water depth P75 - P25: 95 - 400 MMBoe gross unrisked resources 35% probability of success Cameroon Tilapia PSA Bouma This ar
Slide 179: Offshore Nicaragua
22 Offshore Nicaragua World-class opportunity What We Did Shot 3,050 mi. of proprietary seismic Conducted high-quality technical interpretation What We Know 2 MM gross acres NBL operates with 100% WI; seeking partner(s) Similar to 500 MMBoe Malampaya field (Philippines) Model indicates oil potential
Slide 180: Tyra Central Bank Prospect
23 Tyra Central Bank Prospect The reason we acquired the acreage Pre-drill Summary Carbonate reef build-up target NBL operated with 100% WI 1,300 ft. water depth P75 - P25: 100 - 1,000 MMBoe gross resources 20% probability of success Nicaragua Isabel 110 km Tyra Modern Analogue This area intentional
Slide 181: Exploration Performance 2006 - 2011
24 Exploration Performance 2006 - 2011 Leading explorer in the industry Source: Wood Mackenzie Finding Cost ($/Boe) Exploration Peer Group Super Major Noble Energy, Inc. Proportionally Finding More at Lower Cost than the Competition
Slide 182: Exploration and Geoscience Excellence
25 Exploration and Geoscience Excellence We Found It Discovered 2 BBoe at very low cost We are Developing It Rapid discovery to production Executing on time and on budget We are Ready for the Future More than tripled inventory in 5 years Active global 'new ventures' program And Still Building Focus,
Slide 183: Closing Remarks / Q&A
Closing Remarks / Q&A Chuck Davidson Chairman and CEO
Slide 184: Noble Energy: Capitalizing on success
2 Noble Energy Capitalizing on success - driving multi-year value creation Strong and Diversified Portfolio Five core areas - all growing rapidly Deep inventory of investment opportunities Sustainable Industry-leading Exploration Organizational Capability to Execute Robust Financial Framework Highly
Slide 185: Energizing the World, Bettering People's Lives
Energizing the World, Bettering People’s Lives
Slide 186: Appendix
Appendix ——"_—- NBL
Slide 187: Price Assumptions
Price Assumptions Period WTI($/Bbl) Brent ($/Bbl) ace 2011 $90.00 $100.00 $4.25 2012 $90.00 $100.00 $4.50 2013 $90.00 $100.00 $5.00 2014 $90.00 $100.00 $5.25 2015 $90.00 $100.00 $5.50 2016 + +2%/yr +2%/yr + $0.25 / yr ———oroeeeorv['nn ooo ‘ten
Slide 188: Defined Terms
3 Defined Terms Defined Terms