Montero Mining And Exploration Ltd. · TSXV:MON

Montero Mining And Exploration — Investor Presentation (April 2012)

28 slides from Montero Mining And Exploration's investor presentation, April 2012

  1. Slide 1: Rare Earths: Define, Develop, Refine

    RARE EARTHS: Define Develop Refine TSX.V : MON

  2. Slide 2: Disclaimer

    Disclaimer This presentation contains certain statements that may be deemed “forward-looking statements”. All statements in this release, other than statements of historical fact, that address events or developments that Montero expects to occur, are forward-looking statements. "Forward-looking stat

  3. Slide 3: Who we are

    Who we are •Mining Resource at Wigu Hill, Tanzania FOCUS •Refining: rare earths for sale •Fast-track to STRATEGY production TSX.V : MON •Low cost producer TEAM •Experience in rare earths •Active in Africa >30yrs 3

  4. Slide 4: Capital Structure

    Capital Structure Listed on the TSX.V as MON February 2011 @ C$ 0.50 as at January 31, 2012 Shares Outstanding 54.7 Million Fully Diluted 71.4 Million Warrants 6.4M @ $0.70 /5.2M @ $0.80 52 week high/low C$ 0.89 / 0.18 Director and officers 11.5% Broker and Institutional Support: Haywood Securities

  5. Slide 5: Management & Directors

    Management & Directors Dr. Tony Harwood – President and CEO, Director Toni Chapman – Chief Financial Officer, Director • Economic geologist with 30 years of exploration • 20 years financial and administration experience and mining experience • Previous experience includes: former CFO - Tri Origin •

  6. Slide 6: Increased demand for new sources of REEs globally

    China produces 2011: China ~97% of RARE EARTHS REDUCES exports of Rare Earths INCREASED demand for new sources of REE’s globally 6

  7. Slide 7: Rare Earths for a green energy economy

    Rare Earths for a green energy economy UV Resistant & Optical Glass Why we Polishing Compounds Fertilizer need Rare Medical tracers Colourants & Sensors Earths CATALYSTS Processing of Chemicals • Sustainable Catalytic Convertors Gasoline Refining Processing Environment ELECTRONIC LCD Monitors / TV S

  8. Slide 8: Africa's #1 REE Producer

    STRATEGY - Define a road to Production DEFINE DEVELOP REFINE • World-class Wigu Hill • Target: mining • Target: Production of REE Project operation in 2013 saleable Rare Earth • NI 43-101 Compliant • Small-scale mine Products in 2013 Resource 3.3Mt @ • Annum production to • Hydrometallurgical 2.6% L

  9. Slide 9: World Class Rare Earth Deposit: Wigu Hill

    DEFINE Wigu Hill Rare Earth Project World Class • First identified in 1950’s as a high-grade deposit (USGS) Rare Earth • Large carbonatite complex (6.4km x 3.2km) Deposit • Bastnaesite mineralization – “Mountain Pass” look-a-like Values up to • Low uranium (avg. <5ppm) Low thorium (avg. <127ppm) 27.

  10. Slide 10: Location and Infrastructure

    DEFINE LOCATION • 170km from seaport India, Korea, Dar es Salaam Japan China • 12km from Tazara railway (rail siding) export Dar es INFRASTRUCTURE Salaam export • Tanzania, stable, mining friendly country South • Good Infrastructure, Africa rail, port, labour 10

  11. Slide 11: Wigu Hill – Multiple Targets

    DEFINE Wigu Hill – Multiple Targets 11

  12. Slide 12: Wigu Hill – Mineralized Dikes

    DEFINE Wigu Hill – Mineralized Dikes Target Mine Area 12

  13. Slide 13: Wigu Hill Drilling

    DEFINE Wigu Hill Drilling Drilling to • Drilling to define inferred resource = 2,224m (21 holes) - completed define a • Twiga infill drilling = 895m (17 holes) completed LARGER • Drilling at Tumbili and Nyati targets = 2,555m (11 holes) completed resource • 5,000m drilling program for Target 10Mt @

  14. Slide 14: Mine

    MINE High purity Bastnaesite concentrate Target Resource 10Mt@ 5%TREO • Bastnaesite Sales • Montero Refinery & REE Chemical Sales 14

  15. Slide 15: Twiga Zone

    DEVELOP Twiga Zone • Target Area for Mining Twiga Zone Operation – in 2013 • 3.3Mt Resource out on 2,225m shallow drilling at Twiga and Tembo Tembo Zone • 1000m in-fill drilling at 25m intervals completed • High-grade values up Borehole TW003R 20.76m @ 6.23% TREO to 27.25% TREO Incl. 4.03m @ 11.91%

  16. Slide 16: Twiga Zone Resource looking North

    Twiga Zone Resource looking North • Resource at Twiga Zone showing mineralized dikes • Target area for mine 16

  17. Slide 17: Easy to Mine: Bastnaesite Mineralization

    DEVELOP Bastnaesite Mineralization • Highly Mineralized • Surface Exposure • Course Texture • Un-weathered • Low U & Th ! EASY TO Carbonatite dikes MINE contain large REE bastnaesite bearing crystals 17

  18. Slide 18: Experienced Mining Team

    DEVELOP Experienced Mining Team Montero Turgis Build Expertise Expertise mine • Grant Pierce – • 35+ years mine known mine builder building in Africa • Michael Spratley – • Experienced in ex Anglo Gold designing and Target: mining engineer building mines Twiga Zone • 16+ years mine • Scoping study b

  19. Slide 19: Focus: REE Refinery & Hydrometallurgy

    REE REFINERY & HYDROMETALLURGY FOCUS To produce high quality RARE EARTH CHEMICAL PRODUCTS 19

  20. Slide 20: Refinery Test work Objectives

    REFINE Refinery Test work Objectives Develop • Develop and optimise a Refinery flow sheet with a capability in Mintek • Hydro metallurgical scoping RARE EARTH and optimisation studies • Develop saleable products extractive • Take advantage of the first to market opportunity Metallurgy & • Develop a

  21. Slide 21: Experienced Refinery Team

    REFINE Experienced Refinery Team Montero Mintek Rare Earth Expertise Expertise REFINERY • Geoff Skelton – known • >25yrs experience Refinery builder in REE’s Engaging Metallurgical design house • Richard Amata – former • Patented treatment MolyCorp Senior Chemist processes for REE • Mike Freeman pro

  22. Slide 22: Mine to Refinery Flowsheet

    REFINE Mine to Refinery Flowsheet MINE – Minerals Processing REFINERY – Hydro-metallurgical Process Route Bastnaesite Concentrate Leaching Refining Stage 1 Refining Stage 2 XRF sorting Solvent Extraction Screening Sales: Sales >99% Mixed REO & Ce, La, Pr, Nd, Cerium oxide mixed HREO’s Mining 5 -10%

  23. Slide 23: Hydrometallurgical Flow Sheet

    REFINE Hydrometallurgical Flow Sheet HCl NaOH HCl From Gang residue Caustic residue REE ReCl3 Mine LEACH LEACH LEACH solution Filtrate HCI recycle Filtrate NaOH recycle Purification Regeneration Regeneration Precipitation Sales: Mixed REO’s Cerium Oxide Calcine Separation Sales >99% La, Ce, Pr, Nd P

  24. Slide 24: Samples of Saleable REE Products!

    Samples of Saleable REE Products! 24

  25. Slide 25: Target Refinery 5000t/yr

    REFINERY TARGET 5000t/yr* Mixed RE Product *forward-looking statement based on targets 25

  26. Slide 26: Development Plan & Milestones

    Development Plan & Milestones ✓ Completed ✦ In Progress ✓ • NI 43-101 Resource Feasibility Study Mine Construction • Appointments • Resource Target • 60 to 70% interest • Bastnaesite conc. ✦ Scoping Study • EIA, mine & tailings • Drill Program production Complete dam site ✦ Updated Mining Resource M

  27. Slide 27: Value Creation - Fast Track to production

    Value Creation - Fast Track to production 15% Defined Resource PEA PFS DFS Construction Production Production Further Exploration drilling continues to Target *2013 Resource Target* 10% build resource 10Mt at 5% TREO Grade %TREO (increase tonnage) Zandkopsdrift Mountain Pass Mount Weld (Frontier) Be

  28. Slide 28: Thank you

    Thank you Montero Mining & Exploration Ltd. Registered and Records Office: 20 Adelaide St. E, Suite 400 1900-1040 West Georgia Street Toronto, ON M5C 2T6 Vancouver, B.C. V6E 4H3 +1 416 840 9197 [email protected] www.monteromining.com TSX.V : MON @MonteroMining << SCAN ME! - 3D Drill Tour of Wigu