  1. Slide 1: NGPL Pipeline Operations Review

    NGPL Pipeline Operations Review Rob Perkins – Vice President, Gas Control Brian Merchant – Director, Gas Control Trennis Curry – Manager, Gas Control Privileged and Confidential

  2. Slide 2: Agenda

    Agenda  Introduction  System Overview  Summer 2020 Review  Outage Summary  Winter 2019/2020 Lookback  Winter Readiness  Storage Update  Contact List 2 Privileged and Confidential

  3. Slide 3: System Overview

    System Overview 3

  4. Slide 4: NGPL System Map

    NGPL System Map • Winter peak day market delivery 5.2 BCF • Storage working cap 288 BCF • Mainline line pack 12.3 BCF Approximate values • Miles of pipe 9,100 • Flow meters 840 • Total HP 1,053,000 •Total compressor stations 53 •Total storage fields 12 Approximate values 4 Privileged and Confidentia

  5. Slide 5: Annual Average Daily Flows - System

    Annual Average Daily Flows - System 2018 2019 2020* Change LDC 2,428 2,344 1,970 -16% Power 629 660 717 9% Pipeline 939 1,020 1,108 9% Interconnects Mexico 241 167 142 -15% LNG 597 849 676 -20% Industrial 62 56 54 -4% TOTAL 4,896 5,096 4,667 -8% Volumes are MDth/d *Through September 5 Privileged and

  6. Slide 6: Annual Average Daily Flows – Market Area

    Annual Average Daily Flows – Market Area 2018 2019 2020* Change LDC 2,423 2,337 1,966 -16% Power 202 251 308 23% Pipeline 143 137 87 -36% Interconnects Industrial 45 42 43 2% TOTAL 2,813 2,767 2,404 -13% Volumes are MDth/d *Through September 6 Privileged and Confidential

  7. Slide 7: Summer 2020 Review

    Summer 2020 Review 7

  8. Slide 8: Summer 2020 Review

    Summer 2020 Review  System and Market Area deliveries are down 10% compared to previous summer.  Significant drop in LNG deliveries.  COVID-19 Impact  Worldwide demand for LNG down (currently recovering)  Weather Events (tropical storms and hurricanes)  Power Plant demand remained strong throu

  9. Slide 9: NGPL Power & CDD’s

    NGPL Power & CDD’s April – September 2020 9 Privileged and Confidential

  10. Slide 10: Summer System Wide Flows

    Summer System Wide Flows 2019 2020* Change LDC 1,872 1,675 -11% Power 753 781 4% Pipeline Interconnects 978 1,068 9% Mexico 175 189 8% LNG 833 453 -46% Industrial 58 52 -10% TOTAL 4,669 4,218 -10% Volumes are MDth/d *Through September 10 Privileged and Confidential

  11. Slide 11: Summer Market Area Flows

    Summer Market Area Flows 2019 2020* Change LDC 1,864 1,672 -10% Power 322 344 7% Pipeline Interconnects 116 57 -51% Industrial 41 43 5% TOTAL 2,343 2,116 -10% Volumes are MDth/d *Through September 11 Privileged and Confidential

  12. Slide 12: Type Integrity O&M

    Type 2020 2019 2018 Integrity 220 254 203 O&M 252 233 207 System Total 472 487 410 Market Area and Storage 71 63 36 Amarillo projects 201 240 200 GC projects 200 184 174 Posted 182 131 119 Posted with Impact 41 38 38 Privileged and Confidential

  13. Slide 13: Managing Outages

    Managing Outages  While some outages are immediate and/or unavoidable, where possible NGPL makes every attempt to minimize the duration of outages and consolidate work to limit the number of outages and minimize the impact to shippers.  Kinder Morgan has dedicated mechanical and project team avail

  14. Slide 14: Integrity-related Testing/Assessment

    Integrity-related Testing/Assessment  The following table shows the typical timeline to receive results after a pig run is completed: 14 Privileged and Confidential

  15. Slide 15: Winter 2019/2020 Lookback

    Winter 2019/2020 Lookback 15

  16. Slide 16: Winter 2019/2020 Lookback

    Winter 2019/2020 Lookback  Natural’s facilities performed well over the winter season  No pressure issues in the Market Delivery Zone  Storage assets were utilized as required  Overall, winter system deliveries were flat compared to previous winter season.  Peak Day Delivery Records  System De

  17. Slide 17: Winter Overview

    Winter Overview For Nov 1 through March 31, HDDs were 92 % of normal For Jan 1 through March 31, HDDs were 87% of normal HDDs- % of Variance Normal from Normal November 168 123% December -162 86% January -181 86% February -70 93% March -148 82% LDC Takes vs HDD’s 17 Privileged and Confidential

  18. Slide 18: Winter System Wide Deliveries

    Winter System Wide Deliveries 2018-2019 2019-2020 Change LDC 3,031 2,755 -9% Power 531 577 9% Pipeline Interconnects 1,044 1,162 11% Mexico 158 70 -56% LNG 795 1,094 38% Industrial 54 57 6% TOTAL 5,613 5,715 2% Volumes are MDth/d 18 Privileged and Confidential

  19. Slide 19: Winter Market Area Deliveries

    Winter Market Area Deliveries 2018-2019 2019-2020 Change LDC 3,025 2,748 -9% Power 123 216 76% Pipeline Interconnects 185 144 -22% Industrial 42 43 2% TOTAL 3,375 3,151 -7% Volumes are MDth/d 19 Privileged and Confidential

  20. Slide 20: Winter Readiness

    Winter Readiness 20

  21. Slide 21: Winter Readiness

    Winter Readiness  Market Area storage projected to be near 117 Bcf on Oct 31st  Market Area maintenance projects to be completed by early November  No expected impact  Expected changes in pipeline flows:  Market area receipts encouraged  Traditional supply basins:  TexOk northbound is at or n

  22. Slide 22: Winter Checklist

    Winter Checklist  Compression  Test run all compressor units prior to increased demand due to colder weather  Storage  All storage fields are ready for winter  Field Storage expected to be above 95% full  Pipeline  Maintain line pack targets by area  Maintain throughput targets  Maintain pr

  23. Slide 23: Storage Update

    Storage Update 23

  24. Slide 24: Gas Storage Inventory Update

    Gas Storage Inventory Update  2020 Update  Strong injections : April through October  Market fields performing as expected  Market storage above 5 year range  Overall injections are near record highs  2021 Winter Outlook  Market fields on pace to achieve target inventory level  Field invento

  25. Slide 25: Contact List

    Contact List 25

  26. Slide 26: NGPL Contact List

    NGPL Contact List Gas Control Transport and Stor Services Account Services Field Operations Emer 800-733-2490 TSS Hotline Dave Weeks Dee Bennett 24 hr.. 713-369-9400 24 hr. 713-369-9683 630-725-3030 815-272-9104 #[email protected] Cell 630-399-1193 Cell 815-693-0517 Trennis Curry 713-369-9378