BHP Group Ltd · ASX:BHP
BHP — Corporate Update (November 2026)
84 slides from BHP's corporate update, Nov 23, 2026

Slide 1: Copper South Australia: Unlocking a world-class copper province
Copper South Australia: Unlocking a world—class copper province Olympic Dam November 2026

Slide 2: Disclaimer
Disclaimer 2 Copper South Australia site tour | November 2026 The information in this presentation is current as at 23 November 2026 . It is in summary form and is not necessarily complete . It should be read together with the BHP Results for the year ended 30 June 2026 . Forward—looking statements

Slide 3: Acknowledgement of Kokatha Country
Acknowledgement of Kokatha Country 3 A New Chapter Presten Warren

Slide 4: Copper South Australia site tour: Day 1 at a glance
The attractiveness of copper and BHP’s tier 1 copper portfolio T he people, communities and partnerships that we rely on Copper SA’s evolution into an integrated and high—performing asset Our approach to delivering on our strategy The strategy and projects that will deliver Copper SA’s potential Cop

Slide 5: Copper South Australia site tour: Day 2 at a glance
Copper South Australia site tour: Day 2 at a glance 5 Copper South Australia site tour | November 2026 Kirsty Liddicoat General Manager Prominent Hill Vinod Perera General Manager Carrapateena Jim McCluskey General Manager Planning, Technical & Environment Meet the team Carrapateena Olympic Dam Anka

Slide 6: Copper and its place within BHP
Copper and its place within BHP Geraldine Slattery Minerals Australia President Olympic Dam

Slide 7: BHP's portfolio sits within attractive mining jurisdictions
Jansen Vicuña JV Chilean copper Resolution JV Samarco JV Antamina JV BHP’s portfolio sits within attractive mining jurisdictions 7 Copper South Australia site tour | November 2026 Australia Copper South Australia Building a world class copper province Western Australia Iron Ore World’s lowest cost m

Slide 8: Commodity selection drives value in mining
Commodity attractiveness Steep cost curve 1 Scale / size (US$) 2 Demand drivers Copper Copper SA Chile Copper ~300 bn Electrification Digitisation / data Increasing living standards Population growth Iron ore WAIO ~180 bn Urbanisation Population growth Steelmaking coal BMA ~65 bn Urbanisation Popula

Slide 9: Accelerating demand and declining production drive a copper supply deficit
0 10 20 30 40 50 2001 2006 2011 2016 2021 2026 2031 2036 Existing mines and expansions Copper scrap Total demand 0 10 20 30 40 50 2001 2006 2011 2016 2021 2026 2031 2036 Traditional end uses Non-traditional Total demand 2040 Accelerating demand and declining production from existing mines are expect

Slide 10: New mine supply is becoming more challenging
…and new mine supply is becoming more challenging 10 Copper South Australia site tour | November 2026 Capital cost inflation, grade decline, increasing complexity and resource nationalisation are contributing to an increase in the cost of new supply Capital intensity of copper projects 1 (US$k/t Cu,

Slide 11: BHP is already the world's largest listed copper producer
0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 First Quantum KGHM Antofogasta Rio Tinto Southern Copper Zijin Glencore Anglo Teck Freeport McMoran BHP todayBHP FY35 BHP FY35 1 BHP today BHP is already the world’s largest listed copper producer… 11 Copper South Australia site tour | November 2026 BHP pr

Slide 12: Pathway to grow to 2 Mtpa Cu by 2035
0.0 0.5 1.0 1.5 2.0 2.5 3.0 FY26 Vicuña Stages I+II Copper SA Phase 1 (~500 ktpa Cu) Escondida New Concentrator SCPY, ripios and Cerro Colorado Others net of grade decline Mid 2030s Copper SA Phase 2 (up to 650 ktpa Cu) Vicuña Stage III Additional options Resolution 5 Antamina Life Extension Increas

Slide 13: Funded entirely from Copper's operating cash flows
…and funded entirely from Copper’s operating cash flows 13 Copper South Australia site tour | November 2026 Tier 1 asset scale and high margin performance means our copper business break—even is forecast to be below long run consensus p rice Free cash flow (FCF 3 ) break—even copper price 4 (US$/lb)

Slide 14: Key takeaways
Key takeaways 14 Copper South Australia site tour | November 2026 BHP is the largest copper producer 1 , with a pathway to increase attributable copper production to 2 Mt by 2035 2 We have plans to double copper production at Copper SA to 650ktpa by 2040 2 Supply from existing copper mines is expect

Slide 15: Introduction to Copper South Australia
Introduction to Copper South Australia Olympic Dam Anna Wiley Copper South Australia Asset President

Slide 16: Copper SA: A world class copper, gold and uranium asset
Escondida Los Bronces Underground La Granja Buenavista Vicuña BHP Peers Copper SA Kamoa—Kakula Pebble Morenci Oyu Tolgoi Tenke Fungurume Polar Division Grasberg Collahuasi Quebrada Blanca Copper SA: A world class copper, gold and uranium asset 16 Copper South Australia site tour | November 2026 A wh

Slide 17: A uniquely OECD-located, fully integrated facility
A uniquely OECD—located, fully integrated facility… 17 Copper South Australia site tour | November 2026 C opper SA has three operating sites including an integrated smelter and refinery located within a stable region (i) Figures represent the approximate distance of each power transmission line. BHP

Slide 18: A locally based workforce with deep expertise
…with a locally based workforce with deep expertise 18 Copper South Australia site tour | November 2026 A highly skilled, diverse local workforce collaboratively developing exciting future pathways in our region • ~8,000 employees and contractors • ~1.1% of South Australia’s workforce 1 • ~40% contr

Slide 19: Success is everyone going home safe and well
Our approach: Build capable people, engineer risk out of work, and simplify how safety is managed Success is everyone going home safe and well 19 Copper South Australia site tour | November 2026 Our people Empower capability • “Safety Starts with Me” program • BOS continuous improvement • Leaders vi

Slide 20: We have integrated Carrapateena and Prominent Hill
We have integrated Carrapateena and Prominent Hill 20 Copper South Australia site tour | November 2026 Carrapateena and Prominent Hill provide scale and improved operating flexibility EBITDA synergies of >US$130 m per annum through: Realised synergies are 2.5x original estimate 1 Additional integrat

Slide 21: Diversified markets for copper and by-products
Diversified markets for copper and by—products 21 Copper South Australia site tour | November 2026 We sell a range of high—quality products providing optionality in terms of product strategy Copper concentrate Copper cathode Uranium oxide Refined precious metals • High grade Cu content: 30 — 50% 1 •

Slide 22: Our growth strategy for Copper SA
Our growth strategy for Copper SA reflects a better understanding of the asset and a focus on long term value creation Our vision for Copper SA has evolved 22 Copper South Australia site tour | November 2026 A staged growth program creates optionality Bulk mining will unlock substantial incremental

Slide 23: Strategic development decisions made and under study
We have already made several strategic development decisions 1 , with two key decisions under study and yet to be made A number of strategic decisions have already been made 23 Copper South Australia site tour | November 2026 Mining Open—cut Underground Selective only Selective + bulk mining Process

Slide 24: Copper SA's development is aligned with BHP's strategy
Copper SA’s development is aligned with BHP’s strategy 24 Copper South Australia site tour | November 2026 Copper SA’s growth strategy is key to BHP’s commitment to winning the next decade... and beyond Delivering disciplined programmatic growth Leverage the resource Accelerating performance Deliver

Slide 25: Improving operational and financial performance
Improving operational and financial performance Jane Kuang Minerals Australia Vice President Finance Olympic Dam

Slide 26: BOS and technology are improving operational stability
BOS and technology are improving operational stability… 26 Copper South Australia site tour | November 2026 BOS integration is well advanced at Copper SA and we are leveraging technology to accelerate performance improvement Operational Excellence Index (OEI) 1 0 10 20 30 40 50 60 70FY20 FY21 FY22 F

Slide 27: Recent investment has lifted capacity
Olympic Dam mine Carrapateena Olympic Dam surface …a nd recent investment has lifted capacity 27 Copper South Australia site tour | November 2026 Investment to improve performance at Copper SA has been across the value chain Smelter Campaign Maintenance (2021) Refinery Crane & Capacity (2022) 0 80 1

Slide 28: Production is now more stable and at record levels
01.00 2.00 3.00 4.00 5.00 6.00 0 100 200 300 400 500 600 FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 Olympic Dam (Cu) Carrapateena (Cu) Prominent Hill (Cu) By-products (CuEq) Copper price (RHS) Production is now more stable and at record levels… 28 Copper South Australia site tour |

Slide 29: Cost performance has beaten inflation
…and cost performance has beaten inflation 29 Copper South Australia site tour | November 2026 Integration and productivity improvement has enabled Copper SA to deliver real cost decline, with by—products enhancing margin r esilience Unit costs (US$/lb) 0.00 1.25 2.50 3.75 5.00 FY20 FY21 FY22 FY23 F

Slide 30: A strong foundation for investment
A strong foundation for investment 30 Copper South Australia site tour | November 2026 Copper SA’s renewed operational stability provides confidence to support increased capital investment Operating productivity Capital productivity Net operating cash flow Excess cash Portfolio Buy—backs Acquisition

Slide 31: Enduring connections
Enduring connections Anna Wiley Copper South Australia Asset President

Slide 32: Creating shared value across South Australia
Creating shared value across South Australia 32 Copper South Australia site tour | November 2026 Building trusted partnerships and regional capability that support Copper SA today and into the future • >A$100 m spend with 47 Indigenous suppliers, incl A$65 m with 17 Traditional Owner suppliers ~A$30

Slide 33: Strengthening relationships with Traditional Owners
Strengthening relationships with Traditional Owners 33 Copper South Australia site tour | November 2026 Building enduring partnerships and supporting connection to Country and culture Negotiating contemporary agreements across 6 Traditional Owner groups Partnerships and participation BHP’s ‘Healthy

Slide 34: Partnering for the state's future
Partnering for the state’s future 34 Copper South Australia site tour | November 2026 Modernised regulatory framework for Olympic Dam • Updated Olympic Dam Indenture • Fit—for—purpose regulatory framework within integrated copper province • Greater certainty for long—term investment and development

Slide 35: Well positioned to further decarbonise our operations
Renewable electricity and more efficient material movement support lower operational GHG emissions as the province grows Operational emissions 1.32 Mt CO 2 Renewable electricity Outcome Pathway to 100% renewable electricity from FY30 Structurally abating scope 2 emissions while supporting growth in

Slide 36: Doubling production by 2040
Doubling production by 2040 Anna Wiley Copper South Australia Asset President Olympic Dam

Slide 37: Our strategy to double copper production
0 200 400 600 800 1,000 FY26 PHOX CXP MCG Carra SLC ramp down By 2035 Phase 2 By 2040 Copper By-product (CuEq) Our strategy to double copper production… 37 Copper South Australia site tour | November 2026 We are advancing our strategy to grow Copper SA’s production to ~500 ktpa (~800 ktpa CuEq ) by

Slide 38: A program of integrated projects
…through a program of integrated projects… 38 Copper South Australia site tour | November 2026 A series of complementary projects which have the potential to deliver more value than the sum of their parts CXP Carrapateena Expansion MCG OD Mine & Concentrator Growth Mines and concentrators AKO Ankata

Slide 39: Transforming the way we mine and process
We are transforming the way we mine and the way we process to capture full value from Copper SA …enabled by block caving and two—stage smelting 39 Copper South Australia site tour | November 2026 • Enables large—scale mining • Maximises recovery of the mineral resource • Lowers mining unit costs • F

Slide 40: Block caving drives structural mining cost improvement
Block caving drives structural mining cost improvement 40 Copper South Australia site tour | November 2026 Indicative p roduction by mining method ( ktpa ) Transition to block caving increases production while structurally lowering unit costs A structurally more productive operating model Greater fi

Slide 41: Olympic Dam needs a two-stage smelter
Olympic Dam needs a two—stage smelter 41 Copper South Australia site tour | November 2026 Converting to two—stage smelting is essential to unlocking Olympic Dam’s current reserves Olympic Dam SLOS grade and Cu:S ratio (Stoping Cu:S ratio) (OD stoping copper grade) 1.0% 1.5% 2.0% 2.5% 3.0% 3.5% 1.0 1

Slide 42: Olympic Dam's smelter: strategic and economic benefits
Olympic Dam’s smelter: strategic and economic benefits 42 Copper South Australia site tour | November 2026 Presence of radionuclides requires onsite smelting, and the smelter ensures we unlock the full potential of Olympic Dam’s unique resource Economic benefits Strategic benefits T wo—stage smeltin

Slide 43: Phased approach to growth provides flexibility
Phased approach to growth provides flexibility 43 Copper South Australia site tour | November 2026 Copper SA can fully fund Phase 1, reducing its reliance on BHP’s iron ore cash flows and increasing BHP’s capital flexibility 1 Cumulative free cash flow (Phase 1) (US$ bn, real) 2 A lower risk Copper

Slide 44: Delivering on Copper SA's potential
Delivering on Copper SA’s potential 44 Copper South Australia site tour | November 2026 An opportunity to expand Copper SA’s production and lower its costs Copper production Copper cost curve 2 (C1, US$/lb, real) Copper equivalent production 1 (kt CuEq) 0 200 400 600 800 1,000 1,200 1,400 1,600 Copp

Slide 45: A growth program that leverages prior learnings
A growth program that leverages prior learnings 45 Copper South Australia site tour | November 2026 We are applying the lessons of the past to deliver the next stage of Copper SA’s growth Deep market for concentrate creates product flexibility : Strong concentrate sales enables capital efficient exp

Slide 46: A phased and integrated series of investments
A phased and integrated series of investments Carrapateena Jim McCluskey Copper South Australia General Manager Planning, Technical & Environment

Slide 47: Phase 1: Growing to ~500 ktpa Cu and ~800 ktpa CuEq
CXP Carrapateena Expansion MCG OD Mine & Concentrator Growth Mines and concentrators AKO Ankata ODD Future Olympic Dam block caves (incl. OD Deeps) Mines and concentrators Enabled by Northern Water Project and upgrades to power and non—processing infrastructure SRE SRE Stage 1 ~1,100 ktpa concentrat

Slide 48: Phase 1: Prominent Hill Expansion (PHOX)
Phase 1: Prominent Hill Expansion (PHOX) 48 Copper South Australia site tour | November 2026 FY26 actual Post ramp up Mine production (Mtpa) 4.4 7.5 Concentrator capacity (Mtpa) 11 11 Avg mining costs (US$/lb Cu produced) 2 2.8 2.3 Avg copper feed grade (% Cu) 2 0.8% 0.9% Mine life (years) 9 ~20 3 P

Slide 49: Phase 1: Carrapateena Expansion (CXP)
Phase 1: Carrapateena Expansion (CXP) 49 Copper South Australia site tour | November 2026 FY26 actual Post ramp up Mine production (Mtpa) 6.4 12 Concentrator capacity (Mtpa) 7 12 Avg mining costs ( US$/lb Cu produced ) 3 1.7 0.7 Avg copper feed grade (% Cu) 3 1.2% 1.1% Mine life (years) 16 ~30 4 Pro

Slide 50: Olympic Dam: Mine & Concentrator Growth
Olympic Dam: Mine & Concentrator Growth Phase 1: Olympic Dam Mine & Concentrator Growth (MCG) 50 Copper South Australia site tour | November 2026 FY26 actual Post ramp up OD mine production (Mtpa) ~11 ~21 OD concentrator capacity (Mtpa) ~11 ~22 OD avg mining cost ( US$/lb Cu produced ) 3 1.6 1.0 OD

Slide 51: Study options for MCG block cave size
FY26 results basis 1 Current focus of studies 1 We are continuing to study the optimal size for the MCG block cave — a preferred alternative is expected to be determined in the next 12 months Phase 1: Olympic Dam Mine & Concentrator Growth (MCG) 51 Copper South Australia site tour | November 2026 Sc

Slide 52: Phase 1: Smelter and Refinery expansion (SRE)
Project overview 1 • Build new primary flash smelting furnace and acid plant • Convert existing direct — to — blister furnace to become secondary flash converting furnace • Expand capacity of electrolytic refinery and precious metals refinery • Low — capital, future expansion scope included • ~3 yea

Slide 53: Growing gold, uranium and silver
Growing gold, uranium and silver 53 Copper South Australia site tour | November 2026 By — products will increase by ~50% to 300 ktpa CuEq by 2035, improving economics and enhancing margin resilience 1 0 50 100 150 200 250 300 350 400 FY26 FY35 ~FY40 Gold Silver Uranium Copper equivalent production 2

Slide 54: Phase 2: Growing to 650 ktpa copper and 1 Mt CuEq
CXP Carrapateena Expansion MCG OD Mine & Concentrator Growth Mines and concentrators SRE SRE Stage 1 ~1,100 ktpa concentrate Smelter and refinery SCM Smelter Campaign Maintenance ~360 kt cathode ~140 kt copper in concentrate Prominent Hill Expansion (Commissioning) PHOX Product sales Phase 1: Unlock

Slide 55: Phase 2: Growth potential at Olympic Dam
Phase 2: Growth potential at Olympic Dam 55 Copper South Australia site tour | November 2026 Project overview • Stoping (SLOS) can be sustained at 11 Mtpa until 2050+ • Subsequent increase up to 40 Mtpa from underground bulk mining methods are being assessed once SLOS inventories are depleted Potent

Slide 56: Phase 2: Growth potential at Ankata
Phase 2: Growth potential at Ankata (formerly Oak Dam) 56 Copper South Australia site tour | November 2026 Project overview 1 • 8.8 Mt contained copper Mineral Resource assumes bulk underground mining (such as block caving); • 49% larger resource tonnage than Carrapateena • Drilling programs have fo

Slide 57: Phase 2: Creating one of the world's premier copper assets
0 200 400 600 800 1,000 1,200 1,400 1,600 Copper 2035 Escondida Grasberg KGHM Polska Miedz Tenke Fungurume Antamina SA today Buenavista Oyu Tolgoi Las Bambas Cerro Verde Phase 2: Creating one of the world’s premier copper assets 57 Copper South Australia site tour | November 2026 Our development pla

Slide 58: Project execution
Project execution Pedram Ittehadi Copper South Australia Head of Major Projects Prominent Hill

Slide 59: BHP's project execution track record is solid
0% 20% 40% 60% 80% 100%0% 20% 40% 60% 80% 100% BHP’s project execution track record is solid… 59 Copper South Australia site tour | November 2026 • BHP’s project delivery track record is strong – 80% of projects on time and on budget since 2016 – Best of diversified miners • Project execution is inc

Slide 60: Improving our delivery of major projects
…and we are improving our delivery of major projects 60 Copper South Australia site tour | November 2026 While many issues with Jansen were unique to that project, there are valuable lessons for major project delivery What we are doing differently in South Australia Challenges at Jansen • Ineffectiv

Slide 61: A strategic plan that we are already executing
We have a strategic plan that we are already executing 61 Copper South Australia site tour | November 2026 We have awarded >US$ 3 bn of major contracts and have a strategy for the known project execution challenges Carrapateena Crusher 2 Completed Prominent Hill Expansion (PHOX) Commissioning Southe

Slide 62: Grouping projects by work type to extract synergies
Phase 1 Capex: US$5.8 – 7.5bn Phase 1 Capex: US$3.2 – 4.1bn Capex: Sustaining and growth Mines and Concentrators Smelter Enabling projects Grouping projects by work type to extract synergies 62 Copper South Australia site tour | November 2026 We have separated upcoming projects into 3 core work type

Slide 63: Partnering with the best
Partnering with the best 63 Copper South Australia site tour | November 2026 Our delivery partners have proven capability across underground, processing, engineering design and delivery 1 Core work types | Project partners Block caves : Worley has direct experience with recent block cave operations

Slide 64: Modularisation and standardisation
Install predictably Modularisation and standardisation 64 Copper South Australia site tour | November 2026 Modularisation, pre — fabrications and replication reduce site labour, interfaces and schedule risk, and enhance safety Faster Reduce bespoke design/engineering and speed up installation Cheape

Slide 65: Key takeaways
Key takeaways 65 Copper South Australia site tour | November 2026 BHP has a strong project execution track record We have secured tier 1 partners with proven capability in block caving and smelter design and construction We are embedding lessons from Jansen across our projects portfolio, including i

Slide 66: BHP Summary
BHP SUMMARY

Slide 67: Our strategy to double copper production
Our strategy to double copper production 67 Copper South Australia site tour | November 2026 We have a strategy to deliver 500 ktpa Cu (~800 ktpa CuEq) 1 by 2035 and ~650 ktpa Cu (~1 Mtpa CuEq) by 2040 1 Copper South Australia production (ktpa) 14 – 17% Internal rate of return 2 US$18 – 23 k/t Capit

Slide 68: Key messages
Key messages Copper South Australia site tour | November 2026 68 A strong plan to double copper production by 2040 through block caving and two-stage smelting Copper SA is a more stable and consistent operation, providing a stronger basis for investment Tier 1 resource, 100% owned We have a strategy

Slide 69: BHP
BHP

Slide 70: Footnotes
Footnotes 70 Copper South Australia site tour | November 2026 Copper and its place within BHP Slide 7 – BHP’s portfolio sits within attractive mining jurisdictions (1) First production from Jansen Stage 1 is expected to be delivered in mid — CY 27 . Jansen Stage 2 production is expected in FY 31 . F

Slide 71: Footnotes (continued)
Footnotes (continued) 71 Copper South Australia site tour | November 2026 Introduction to Copper South Australia Slide 16 – Copper SA: A world class copper, gold and uranium asset (1) Mine life is estimated based on Ore Reserves and Mineral Resources and subject to conversion of resources into reser

Slide 72: Footnotes (continued)
Footnotes (continued) 72 Copper South Australia site tour | November 2026 A phased and integrated series of investments Slide 47 – Phase 1: Growing to ~500 ktpa Cu and ~800 ktpa CuEq (1) See ’Forward — looking production information : assumptions and copper equivalent methodology’ on slide 73 . Proj

Slide 73: Forward-looking production information and copper equivalent methodology
Footnotes 73 Copper South Australia site tour | November 2026 Forward — looking production information, assumptions and copper equivalent methodology Only information expressly identified as production guidance or a production target constitutes BHP production guidance or a production target, as app

Slide 74: Abbreviations and Glossary
Abbreviations and Glossary 74 Copper South Australia site tour | November 2026 AKO Ankata NPI Non — Process Infrastructure BC Block Cave OEM Original Equipment Manufacturer BOS BHP Operating System OD Olympic Dam Copper SA Copper South Australia ODD Olympic Dam Deeps Cu:S Copper to Sulphur ratio PEA

Slide 75: We are sequencing our major projects
We are sequencing our major projects Illustrative timeline Maturity CY26 CY27 CY28 CY29 CY30 CY31 CY32 CY33 CY34 CY35+ Phase 1 Growth Projects Prominent Hill Expansion (PHOX) Transforming Prominent Hill from truck haulage to shaft hoisting Smelter Campaign Maintenance 2027 (SCM27) Major 6 — yearly m

Slide 76: Phase 1 project capex, intensity and timing
Maturity Estimated capital expenditure (US$ bn 1 ) Estimated capital intensity (US$k/CuEq t) Potential FID (year) Potential first production (year) Potential production profile (ktpa CuEq) 2 Indicative IRR at consensus copper price (nominal,%) 3 Phase 1: Mines & Concentrators Prominent Hill Expansio

Slide 77: Copper SA Phase 2 growth creates enduring value
Maturity Estimated capital expenditure (US$ bn 1 ) Estimated capital intensity (US$k/CuEq t) Potential FID (year) Potential first production (year) Potential production profile 2 (ktpa Cu / CuEq) Indicative IRR at consensus copper price (nominal,%) Phase 2: Expanding to 650 ktpa Cu and ~1 Mtpa CuEq

Slide 78: Smelter Campaign Maintenance (SCM27)
Smelter Campaign Maintenance (SCM27) 78 Copper South Australia site tour | November 2026 SCM27 is a critical bridge to two — stage smelting, supporting both operational reliability and long — term growth Project overview • Major lifecycle maintenance program of the OD Smelter • Critical sustaining,

Slide 79: Enabling project: Northern Water Project
Enabling project: Northern Water Project (NWP) 79 Copper South Australia site tour | November 2026 Project overview • Copper SA currently uses ~60 ML/day with ~35 ML/day sourced from the Great Artesian Basin • The Northern Water Project has three parts: – Marine infrastructure – Desalination plant –

Slide 80: Enabling project: Power supply project
Enabling project: Power supply project (PSP) 80 Copper South Australia site tour | November 2026 Existing Partial Upgrade Full Build Transmission capacity (MW) 300 340 780 Critical enabler of the Copper SA growth program, designed to ensure sufficient and reliable power to support production at O ly

Slide 81: Uranium Expansion (Hydromet)
Uranium Expansion ( Hydromet ) 81 Copper South Australia site tour | November 2026 Brownfield expansion replicates Olympic Dam uranium flowsheet at low cost; i ncreases uranium production capacity to ~6 ktpa U 3 O 8 Project overview • Brownfield uranium expansion within broader MCG program • Expands

Slide 82: Competent Person Statement: Copper Mineral Resources
Competent Person Statement: Copper Mineral Resources 82 Copper South Australia site tour | November 2026 Copper Mineral Resources Competent Person Statement The information in this slide relates to Copper Mineral Resources as at 1 September 2026. Mineral Resources are inclusive of Ore Reserves and i

Slide 83: Copper Mineral Resources
Competent Person Statement: Copper Mineral Resources 83 Copper South Australia site tour | November 2026 Deposit Material type Measured Resources Indicated Resources Inferred Resources Total Resources BHP interest % Mt %Cu Mt %Cu Mt %Cu Mt %Cu Contained Metal (Cu kt) Copper operations Escondida Oxid

Slide 84: Copper South Australia Mineral Resources
Competent Person Statement: Copper South Australia Mineral Resources 84 Copper South Australia site tour | November 2026 Deposit Material type Measured Resources Indicated Resources Inferred Resources Total Resources BHP interest % Mt %Cu Mt %Cu Mt %Cu Mt %Cu Contained Metal (Cu kt) Copper gold oper
Source: SEC EDGAR · 6-K filed Nov 23, 2026
More decks from BHP Group Ltd
Technical Presentation (November 2026)86 slides · Nov 23, 2026
ESG Presentation (September 2026)31 slides · Sep 16, 2026
ESG Presentation (September 2026)29 slides · Sep 16, 2026
FY2026 Earnings Presentation58 slides · Aug 18, 2026
FY2026 Earnings Presentation56 slides · Aug 18, 2026
FY2026 Earnings Presentation44 slides · Aug 18, 2026