  1. Slide 1: 2014 RFM Grower update

    2014 RFM Grower update RFM Almond Fund 2006 (AF06) RFM Almond Fund 2007 (AF07) RFM Almond Fund 2008 (AF08) August 2014

  2. Slide 2: Agenda

    Agenda  Industry outlook  2013 harvest overview  Grower distributions  Projects outlook  Spanish almond industry study tour  Conclusion 2

  3. Slide 3: Industry outlook

    Industry outlook  Global demand for almonds has now surpassed global production and consumption is increasing  2013 Californian crop was approximately 2 billion pounds (up 6.7% from 2012) and 2014 crop estimated at 2.1 billion pounds  Californian drought is causing concern around the reliability

  4. Slide 4: Industry outlook

    Industry outlook SOURCE: Almond insights 2013-14, Almond Board of Australia 4

  5. Slide 5: Industry outlook

    Industry outlook SOURCE: Almondco 5

  6. Slide 6: 2013 harvest overview

    2013 harvest overview Almond Fund year 2006 2007 2008 Project year 8 7 6 Yield - t/ha 3.62 4.26 4.11 Almond price - ($/kg) $6.63 $6.63 $6.67  Observations – First mature crop – Yield out performance against industry average – High crackout ratio (kernel to field weight) 6

  7. Slide 7: 2014 distribution (2013 harvest)

    2014 distribution (2013 harvest) Almond Fund year 2006* 2007 2008 Management Fee -$220.66 -$238.99 -$238.99 Licence Fee -$1,347.64 -$1,166.50 -$1,166.91 Operating Costs -$3,691.93 -$3,446.41 -$3,206.10 Performance fee n/app -$144.91 -$202.33 Total costs (inc. GST) -$5,260.23 -$4,996.81 -$4,814.33 Pl

  8. Slide 8: 2014 harvest update

    2014 harvest update Almond Fund year 2006 2007 2008 Project year 9 8 7 Estimated yield - t/ha 3.20 3.42 3.14 Almond price - ($/kg) $8.50 $8.50 $8.50  Observations – Smaller crop following large 2013 crop (biennial bearing) – High yield compared to industry standard for 2014 – 90% hulling and shelli

  9. Slide 9: 2015 cash flow estimates

    2015 cash flow estimates Almond Fund year 2006 2007 2008 Project year 9 8 7 Yield - t/ha 3.20 3.42 3.14 Almond price - ($/kg) $8.50 $8.50 $8.50 Pre-tax Grower cashflow (ex GST) $1,637 $1,540 $1,250 GST -$479 -$442 -$419 Disclaimer The information included in the above table is not a financial foreca

  10. Slide 10: Communications

    Communications  April – harvest update  June – harvest completion  August – adviser and investor teleconferences  October – periodic and distribution statement  March and September – half and full year financials made available on RFM website 10

  11. Slide 11: 2015 key projects

    2015 key projects  Key projects for FY15 include: – frost fans installation – drip tube replacement – new bore – fences – irrigation system upgrade – harvest equipment  Frost fans provide a significant enhancement to the ongoing risk management of the orchard 11

  12. Slide 12: 2015 outlook

    2015 outlook  Excellent bud development  All varieties showing positive initial signs  Increased tree bulk  Anticipating higher water usage (and delivery costs) and have available substantial carryover water  Plan to use contract shake and catch machine to assist harvest speed 12

  13. Slide 13: Spanish almond Industry Study Tour

    Spanish almond Industry Study Tour Presented by: Daryl Winter August 2014

  14. Slide 14: Spanish almond industry insights

    Spanish almond industry insights  Almond Board of Australia conducted tour  12 local growers and representatives  Toured around Catalonia in north east Spain  Objectives included increased awareness of global market and industry collaboration

  15. Slide 15: Almond world production

    Almond world production Production (%) Production (tonnes of kernel) Countries 1990-99 2000-10 2012 2013 1. USA 71.9 80.0 857,000 907,000 2. Australia 0.0 2.4 49,896 69,627 3. Spain 16.9 6.3 46,103 32,053 Other 11.2 11.3 - -

  16. Slide 16: Examples of old orchards

    Examples of old orchards

  17. Slide 17: Examples of new orchards

    Examples of new orchards

  18. Slide 18: Sophisticated propagation

    Sophisticated propagation

  19. Slide 19: New infrastructure ideas

    New infrastructure ideas 19

  20. Slide 20: Conclusion

    Conclusion  First distributions for all projects to be processed in October following project audits  2013 and 2014 harvests outperformed industry average  All orchards now mature  Industry fundamentals positive - evidenced in price  Early signs suggest a good crop for 2015 20

  21. Slide 21: Disclaimer

    Disclaimer RFM AFSL 226701 as Responsible Entity (RE) for RFM Almond Fund 2006 (ARSN 117 859 391), RFM Almond Fund 2007 (ARSN 124 998 527) and RFM Almond Fund 2008 (ARSN 127 947 960), has prepared this presentation based on information available to it. Although all reasonable care has been taken to

Rural Funds Management — Corporate Update (August 2014) on 6ix