Tower Resources Plc · LSE:TRP

Tower Resources — Proactive Investors Forum (May 2018)

16 slides from Tower Resources's conference presentation, May 31, 2018

  1. Slide 1: Cameroon: Unlocking value in a producing basin

    Cameroon: Unlocking value in a producing basin Proactive Investors 31 May 2018 © 2018 Tower Resources plc 1

  2. Slide 2: Disclaimer

    Disclaimer Important Notice DISCLAIMER The information contained in these slides has been prepared by Tower Resources plc (the “Company”). This Presentation is being made for information purposes only and does not constitute an offer or invitation for the sale or purchase of securities or any of the

  3. Slide 3: Summary

    Tower Resources Summary Focus on getting into production in Cameroon ! Thali license in shallow water ! 3 discovery wells already drilled by Total ! 39 million bbls (gross) contingent OIP* in Njonji discovery alone ! Numerous prospects for scaling up ! Reprocessed 3D being analysed, well planning un

  4. Slide 4: Capital Structure

    Tower Resources Capital Structure Capital Structure Shareholders Listing AIM Share price 1.725p Market capitalisation ~ £6.5m Issued share capital 377.3m Options & warrants‡ 38.2m (9.3%) Director, staff and 14.7% consultant holdings Average Daily Volume† 1.85 million 12 month low (at close) 0.751p 1

  5. Slide 5: Tower's Team

    Tower Resources Tower’s Team ! Small committed board with significant personal investment ! Jeremy Asher Peter Taylor Graeme Thomson David M Thomas Directors own ~15% of issued share Chairman & CEO Non-Executive Director Non-Executive Director Non-Executive Director capital ! Staff with the company

  6. Slide 6: Thali Block

    Tower Resources Cameroon, Rio del Rey Basin Thali Block THALI PSC © 2018 Tower Resources plc 6

  7. Slide 7: Rio del Rey – proven plays in Niger Delta

    Cameroon, Thali Block Rio del Rey – proven plays in Niger Delta Rio Del Rey Basin Regional Hydrocarbon Provinces Nigeria Cameroon Extensional Province ! Underexplored sub- Mobile Shale Belt RIO DEL REY BASIN basin of the prolific Fold-Thrust Belt > 2 Billion bbl / >1.4 TCF Niger Delta ! >> 34.5 Bill

  8. Slide 8: Proven Oil and Gas on Block

    Cameroon, Thali Block Proven Oil and Gas on Block Low-Risk Fault-Blocks Close to Existing Infrastructure ! 25 MMbbl Dissoni North field lies immediately north of the Thali block DISSONI NORTH 25 MMbbl net reserves • Developed by Perenco – planned to (recoverable) reach 12,500 bpd of 35o API oil ! Si

  9. Slide 9: Significant Exploration Potential in Addition to Near-Term Production

    Cameroon, Thali Block Significant Exploration Potential in Addition to Near-Term Production Turbidites to South-East ! Potential Alba-type plays Deeper Underexplored Sandstone Plays ! Billion barrel fields along trend in Equatorial Guinea ! Similar leads identified in Thali ! Marathon and Exxon oil

  10. Slide 10: Forward Plan

    Cameroon, Thali Block Forward Plan ! Seismic Reprocessing - COMPLETE ! Interpretation & Prospect Inventory - IN PROGRESS ! Drilling ESIA - IN PROGRESS ! Well Planning & Design - IN PROGRESS 2018 Q1 Q2 Q3 Q4+ REPROCESSING KEY G&G (LEGACY 3D SEISMIC DATA) 3D seismic Operations G&G STUDIES (INTERPRETAT

  11. Slide 11: Well placed in areas targeted by Majors

    South Africa Well placed in areas targeted by Majors 2014 Acquisition of Rift Petroleum ! Algoa-Gamtoos (50%, Operator: New Age) ! 3D acquired in 2014 ! 1st Renewal Period of Algoa-Gamtoos granted in Sept 2015, agreed in 2017 – additional geophysical data planned in 2019 ! Oil-majors in neighbouring

  12. Slide 12: Why Zambia? 'There is no oil there….'

    Zambia, Blocks 40 and 41 Why Zambia? ‘There is no oil there….’ ! The Mid-Zambezi Basin: A 25,000+ km2 rift basin with no oil & Historic focus 25-30yrs gas exploration wells, nor even any ago in Luangwa Basin – seismic data Only two wells drilled ! But source rock, reservoir and seals all appear to b

  13. Slide 13: Summary

    Tower Resources Summary Focus on getting into production in Cameroon ! Thali license in shallow water ! 3 discovery wells already drilled by Total ! 39 million bbls (gross) contingent OIP* in Njonji discovery alone ! Numerous prospects for scaling up ! Reprocessed 3D being analysed, well planning un

  14. Slide 14: Appendix

    Tower Resources Appendix ! Cameroon – Thali block history ! Zambia – Play stratigraphy © 2018 Tower Resources plc 14

  15. Slide 15: Thali Block Prospectivity

    Thali Block Prospectivity Exploration history ! Three wells drilled in the 1960-80’s on 2D seismic data ! ERM1 (1967) - oil shows (‘PS.9’ sands) ! EUM1 (1980) - dry ! ISM1 (1981) - dry ! Result: proved the presence of deltaic ’S’ reservoirs ! Reasons for failure: ! Not drilled on structure ! Six wel

  16. Slide 16: Proven Source Rocks & Reservoirs

    Zambia, Blocks 40 and 41 Proven Source Rocks & Reservoirs ! Key play elements proven in Blocks 40 & 41 Play Stratigraphy of Blocks 40 & 41 by initial field work in 2014, additional work in 2015/16: AGE SUPER- (Ma) STAGE GROUP • Widespread source rocks TERT. KALAHARI SSTS JURA. BATOKA BASALT • Excell