Exxaro Resources Limited · JSE:EXX
Exxaro Resources — Kumba Resources — Presentation to the Pretoria Branch of the South African Institute of Mining and Metallurg (September 2002)
45 slides from Exxaro Resources's conference presentation, Sep 19, 2002

Slide 1: Post unbundling and into the future
Post unbundling and into the future Presentation to the Pretoria Branch of the South African Institute of Mining and Metallurgy Dr CJ Fauconnier 19 September 2002 1

Slide 2: Introduction
@@@ KUMBA RESOURCES INTRODUCTION

Slide 3: History
HISTORY • Iscor Integrated steel producer since 1928 Privatised, listed on JSE Securities Exchange – 1989 Strategy – 1994: Mining the vehicle for growth Strategy – 1999: Focus on six strategic business units Re-engineering: 1996 – 2001 • Kumba Formed in July 2001 Unbundled from Iscor a

Slide 4: Shareholder value unlocked
SHAREHOLDER VALUE UNLOCKED Mining SAc Anglo Charter shareholding 8,000 announced leaked 7,000 Iscor and Kumba combined post- 6,000 Unbundling unbundling & separate 5,000 Deal on listing Saldanha Steel Kumba only post- 4,000 unbundling 3,000 2,000 Iscor only post- unbundling 1,000 Iscor pre-unbundlin

Slide 5: Market capitalisation
MARKET CAPITALISATION R billion 25 23.82 20 14.02 15 10.04 10 9,03 7.89 5 9.81 2.98 0 30 Jun 2000 30 Jun 2001 23 Nov 2001 26 Nov 2001 28 Jun 2002 Iscor Kumba 5

Slide 6: Factors affecting value after unbundling
FACTORS AFFECTING VALUE AFTER UNBUNDLING • Re-rating of both companies by the market Greater visibility of mining results Greater recognition of results of re-engineering Higher forward multiples for mining • Buoyant resources market driven by rapid decline of US$/R exchange rate • Recovery in

Slide 7: Overview of Kumba
@@@ KUMBA RESOURCES OVERVIEW OF KUMBA

Slide 8: Business structure
BUSINESS STRUCTURE Kumba Resources Iron ore Coal Base Heavy Industrial Other metals minerals minerals investments Sishen Grootegeluk Rosh Pinah Hillendale Glen Douglas AST Group mine mine mine mine & MSP dolomite mine (30.73%) (95%) (60%) Thabazimbi Leeuwpan Zincor Empangeni Ferrosilicon Ticor Ltd m

Slide 9: South African operations
SOUTH AFRICAN OPERATIONS Iron ore Industrial minerals Sishen mine – 25.9 Mtpa Glen Douglas mine Thabazimbi mine – 2.4 Mtpa Metallurgical dolomite – 542.8 ktpa Total sales – 28.1 Mtpa Aggregate – 649.9 ktpa Exports 19.9 Mtpa Lime – 94.8 ktpa Ferrosilicon plant – 4.3 ktpa Base Metals Rosh Pinah mine Z

Slide 10: Presence in Australia
PRESENCE IN AUSTRALIA Hope Downs (Kumba 49%) Marra Mamba Fe ore Moranbah South 400 Mt reserve 400 Mt resource (Kumba 100%) • 700 Mt Coking coal resource Mincor (Kumba 34%) Mineral Deposits Ltd (MDL) • Miitel/Wannaway (Kumba 15.4%) - Ni Sulphide ops • Hawks Nest Tiwest JV • Reko Diq Cu - 15 ktpa ruti

Slide 11: Sishen iron ore mine
SISHEN IRON ORE MINE eee KUMBA RESOURCES

Slide 12: Sishen iron ore mine
SISHEN IRON ORE MINE 12

Slide 13: Saldanha iron ore export terminal
SALDANHA IRON ORE EXPORT TERMINAL 13

Slide 14: Thabazimbi iron ore mine
THABAZIMBI IRON ORE MINE eee KUMBA RESOURCES

Slide 15: Grootegeluk coal mine
GROOTEGELUK COAL MINE Yo® KUMBA RESOURCES

Slide 16: Leeuwpan coal mine
LEEUWPAN COAL MINE eco KUMBA RESOURCES

Slide 17: Richards Bay coal terminal
RICHARDS BAY COAL TERMINAL 17

Slide 18: Tshikondeni coal mine
TSHIKONDENI COAL MINE UMBA RESOURCES

Slide 19: Rosh Pinah Zn/Pb mine
ROSH PINAH Zn/Pb MINE eee KUMBA

Slide 20: Zincor refinery
ZINCOR REFINERY 20

Slide 21: Hillendale mine
HILLENDALE MINE eee KUMBA

Slide 22: Hillendale MSP
HILLENDALE MSP KUMBA RESOURCES he l= Ma i

Slide 23: Empangeni smelter
EMPANGENI SMELTER eco KUMBA RESOURCES

Slide 24: Glen Douglas
GLEN DOUGLAS eco KUMBA RESOURCES rs Se

Slide 25: China
e ee @@@ KUMBA RESOURCES

Slide 26: Hongye refinery
HONGYE REFINERY e ee @@@ KUMBA RESOURCES

Slide 27: Tiwest Chandala SR plant
TIWEST CHANDALA SR PLANT eee KUMBA RESOURCES

Slide 28: Annual results 2002
@@@ KUMBA RESOURCES ANNUAL RESULTS 2002

Slide 29: Revenue contribution
REVENUE CONTRIBUTION Coal (21%) Iron ore (60%) Base metals (13%) Heavy minerals (3%) Industrial minerals (3%) 29

Slide 30: Highlights
HIGHLIGHTS R million FY 02 FY 01 % Change Revenue 7 182 5 404 33 Net operating profit 1 683 584 188 Headline earnings 1 098 511 115 Debt 1 143 2 541 55 Maiden dividend: 85 cents per share 30

Slide 31: Operating results
OPERATING RESULTS R million R million 8 000 2 000 7 182 7 000 1 750 1 683 6 000 5 404 1 500 5 000 4 395 4 527 1 250 4 000 3 813 1 000 793 3 000 750 624 459 512 2 000 500 1 000 250 0 0 1998 1999 2000 2001 2002 1998 1999 2000 2001 2002 Revenue Net operating profit Compound annual growth rate = 11 % Co

Slide 32: Revenue
REVENUE R million FY 02 FY 01 % Change Iron ore 4 340 2 944 47) Coal 1 489 1 241 20) Base metals 941 945 -) Heavy minerals 227 - -) Industrial minerals 57 71 (20) Other 128 203 (37) Total 7 182 5 404 33) US$/R exchange rate realised 10.18 7.11 32

Slide 33: Operating profit
OPERATING PROFIT R million FY 02 FY 01 % Change Iron ore 1 221 699) 75 Coal 255 100) 155 Base metals 102 98) 4 Heavy minerals 54 -) - Industrial minerals 15 15) - Other 36 (328) - Total EBIT 1 683 584) 188 Total EBITDA 2 137 924) 131 Operating margin (%) 23 11) 109 33

Slide 34: Challenging markets
CHALLENGING MARKETS 22 35 Lump 20 30 18 25 16 Fine 20 14 Source: The TEX Report Source: SA Coal Report 12 15 Jul 1998 Jul 2001 Jun 2002 Jul 1998 Jul 2001 Jun 2002 Iron ore prices (US$/t) Coal export spot price (US$/t) 1 400 110 1 300 100 1 200 1 100 90 1 000 900 80 800 70 700 Source: I-Net Bridge So

Slide 35: Operational excellence
OPERATIONAL EXCELLENCE R million 1 800 1 600 200 1 400 1 200 1 000 958 1 683 800 209 (175) 600 (93) 400 584 200 0 2001 EBIT SA inflation Price Net US$/R Operational2002 EBIT changes changes exchange efficiency rate effect 35

Slide 36: The road ahead
@@@ KUMBA RESOURCES THE ROAD AHEAD

Slide 37: External factors impacting on Kumba strategy going forward
EXTERNAL FACTORS IMPACTING ON KUMBA STRATEGY GOING FORWARD • Commodity markets • Financial and currency markets, especially the US$/R exchange rate • Mineral and petroleum resources development bill Mining charter Money bill • HIV / AIDS • Corporate activity Initiated by Kumba External to Ku

Slide 38: Value drivers
VALUE DRIVERS • In Kumba we believe our future shareholder value will be driven by Operational excellence from globally competitive operations Greater balance in diversified commodity portfolio Prudent geographic diversification Growth from robust pipeline of quality projects Further empow

Slide 39: Preparing for growth
PREPARING FOR GROWTH • Depleting assets must be replaced • Geography cannot be a constraint • Growth aspirations tailored to means • Targets build on existing skills 39

Slide 40: Iron ore projects
IRON ORE PROJECTS R bn • Securing 4th global position 10 Hope Downs (1) • Independent producer 8 • Market diversity Project capital 6 4 • Largest lump producer Sishen South West Africa (1) 2 Hope Downs (2) 0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Financial year 40

Slide 41: Coal projects
COAL PROJECTS R million • Mature industry 250 Grootegeluk semi soft • M&A activity likely coking coal 200 Kalbasfontein • Grootegeluk key to Waterberg Project capital 150 resources 100 Grootegeluk bench 13 • Moranbah South reserve 50 0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Financial year

Slide 42: Base metals projects
BASE METALS PROJECTS R bn • China - fastest growing 2.0 markets - large resource base - Kumba’s established presence Kamoto 1.5 • New Zn process technologies Project capital • DRC - huge potential but stability 1.0 Rosh Pinah (2) a prerequisite Kumbiox (1) • Promising exploration in Namibia 0.5 Kipu

Slide 43: Heavy minerals projects
HEAVY MINERALS PROJECTS R bn • Steady but modest growth 2.0 in TiO2 demand 1.5 • Ticor the partner for growth Project capital 1.0 Centane • Indian Ocean rim the focus Fairbreeze reserve reserve 0.5 Empangeni Empangeni furnace 3 furnace 2 0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Financial

Slide 44: The way forward
THE WAY FORWARD • Kumba’s first year was an excellent year • Business is in good shape • Driving a clear strategy • Exciting growth prospects Our vision is to outperform the mining and mineral sector in creating value for all stakeholders through exceptional people and superior processes I am confid

Slide 45: Harnessing the power of the earth
HARNESSING THE POWER OF THE EARTH 45
Source: Internet Archive copy of exxaro.com
More decks from Exxaro Resources Limited
H1 2026 Earnings Presentation41 slides · Aug 20, 2026
Investor Day (June 2026)100 slides · Jun 22, 2026
FY2025 Earnings Presentation47 slides · Mar 19, 2026
SA Tomorrow Conference 202529 slides · Oct 22, 2025
H1 2025 Earnings Presentation41 slides · Aug 21, 2025
Merger or Acquisition (May 2025)17 slides · May 13, 2025