3i Infrastructure PLC · LSE:3IN

3i Infrastructure — H1 2021 Earnings Presentation

31 slides from 3i Infrastructure's earnings presentation, Nov 11, 2020

  1. Slide 1: Results for the half year to 30 September 2020

    Results for the half year to 30 September 2020 11 November 2020

  2. Slide 2: Important information

    Important information The sole purpose of this information-only presentation (“Presentation”) is to provide information on a The distribution of this Presentation in certain jurisdictions may be restricted by law. Persons into whose non-reliance basis about 3i Infrastructure plc and its subsidiaries

  3. Slide 3: Consistently strong performance against our objectives

    Consistently strong performance against our objectives Our strategy Our objectives To maintain a balanced portfolio of To provide shareholders with: infrastructure investments delivering an • A total return of 8% to 10% per attractive mix of income yield and capital annum, to be achieved over the ap

  4. Slide 4: Generating value in the current market

    Generating value in the current market Asset intensive, resilient Return companies Mid Market Economic Asset bases that are hard to Infrastructure replicate Large Core Providing essential services Infrastructure Established market positions Operational PPPs Good visibility of future cash Our investm

  5. Slide 5: Resilient to the challenges of Covid-19

    Resilient to the challenges of Covid-19 3.8% Total return on opening NAV Resilient portfolio underpinning growth in net asset value 259.4p NAV per share Good level of income and non-income cash to support the £48m dividend Total income and non-income cash Strong liquidity position to make new invest

  6. Slide 6: Strong return from a diversified portfolio

    Strong return from a diversified portfolio for the half year to 30 September 2020 Total portfolio return 5.5% Infinis 2.5% Tampnet 6.3% Joulz 16.0% Ionisos 8.2% TCR (5.6)% ESVAGT 1.9% Oystercatcher 4.5% Valorem 20.5% Attero (2.9)% Projects 10.6% India Fund 18.5% 6

  7. Slide 7: A well-diversified, balanced portfolio

    A well-diversified, balanced portfolio Utilities Portfolio value by sector India Fund Transportation / 4% Projects Infinis 2% logistics Attero 4% 9% Communications 6% 16% 12% 40% Valorem Healthcare 6% 13% Natural Resources 22% Tampnet / energy Oystercatcher 9% 20 assets 13% Social infrastructure £1.

  8. Slide 8: Engaged asset management approach to positively influence our companies

    Engaged asset management approach to positively influence our companies 1 Strengthen portfolio company management teams 2 Invest and develop companies to support a sustainable future 3 Growing our platform businesses through acquisitions 8

  9. Slide 9: Infinis

    Infinis Generator of electricity • Performed ahead of expectations in the period • Mostly unaffected by the pandemic and continues to benefit from the inflation-linked UK Renewables Obligation Certificate regime until 2027 • Thanks to its near-term hedging strategy, low power prices have had limited

  10. Slide 10: Tampnet

    Tampnet Offshore telecom network • Agreed to acquire BP’s fibre assets in the Gulf of Mexico, securing ownership of a key piece of subsea infrastructure and enabling Tampnet to replicate its successful North Sea business model • The acquisition is expected to complete in 2021 and is value accretive

  11. Slide 11: Joulz

    Joulz Essential energy infrastructure equipment and services • Performed ahead of our investment case again for the year to date with limited impact from Covid-19 • Carve-out from Stedin and the integration of the new electric vehicle charging solutions business acquired in March are progressing wel

  12. Slide 12: Ionisos

    Ionisos Cold sterilisation for the healthcare industry • Performed well during our first year of ownership • Benefited from cold sterilisation being an essential service • Pandemic resulted in reduced demand for surgical, cosmetic and veterinary products but offset by an increase in demand for medic

  13. Slide 13: TCR

    TCR Ground support equipment in airports • Performed broadly in line with our expectations during the first half of the year, as flights resumed slightly earlier than anticipated and operating costs were managed well • Assuming a more prolonged and gradual recovery to previous air traffic levels by

  14. Slide 14: ESVAGT

    ESVAGT Wind farm maintenance support vessels and emergency response vessels • Overall performance improved compared to the same period last year • ERRV fleet seeing lower utilisation, as a result of lower oil prices • Wind farm SOVs largely unaffected by Covid-19 or reduced oil prices £147m • Commit

  15. Slide 15: Oystercatcher

    Oystercatcher Oil product storage terminals • Good first half of the year, outperforming expectations and prior year • Drop in oil prices caused a contango market structure which led to storage rate improvements and customers keen to renew earlier • Negative impact of Covid-19 has been limited to lo

  16. Slide 16: Attero

    Attero Waste treatment and processing • Continued to perform well operationally • Waste production in the Netherlands has largely recovered, however waste imports from the UK are still below pre-pandemic levels • Plants were able to continue operating at full capacity during the period by drawing wa

  17. Slide 17: Valorem

    Valorem French renewable energy developer • Performed well in the first half of the year, benefiting from favourable wind conditions, good availability and a partial refinancing • All assets continued to operate as normal during the lockdown period and a number of new projects became operational, wh

  18. Slide 18: Projects portfolio

    Projects portfolio • Performed in line with expectations • Availability-based revenues unaffected by the Covid-19 pandemic • In October, agreed acquisitions of several co- shareholders’ stakes for a total equity investment of c.€25m £52m £73m £14m Cost Closing value Cash income and proceeds 18

  19. Slide 19: India Infrastructure Fund

    India Infrastructure Fund • Significant progress made towards realising the remaining assets in the fund • Agreement reached to sell stake in Krishnapatnam Port, for a price significantly above the latest valuation £108m £32m £25m Cost Closing value Cash income and proceeds 19

  20. Slide 20: Outlook

    Outlook 3iN remains well positioned to deliver its objectives Resilient portfolio with strong market positions Strong liquidity to make new investments and invest in our portfolio Continuing to deliver progressive dividend 20

  21. Slide 21: Appendix

    3) Infrastructure plc Si Appendix

  22. Slide 22: Share price continues to outperform

    Share price continues to outperform 5 year share price and NAV performance Total Shareholder Return 3iN FTSE 250 3iN NAV Note: 1. FTSE 250 rebased to 3iN opening share price at 1 October 2015. 2.Total shareholder return shown per annum. 22

  23. Slide 23: FY21 target dividend growth of 6.5%

    FY21 target dividend growth of 6.5% Dividend growth since IPO (pence per share) ▪ Special dividends ▪ Ordinary dividends ▪ FY21 dividend target 41.4 4.2% p.a.1 10.2% 6.4% 6.5% 17.0 6.49 6.70 7.00 7.25 7.55 7.85 8.65 9.20 9.80 5.00 5.30 5.50 5.72 5.94 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17

  24. Slide 24: Portfolio summary

    Portfolio summary 30 September 2020 (£m) Directors' Allocated Directors' Foreign Underlying Portfolio total Investment in Divestment in Accrued income Value valuation 30 foreign Portfolio assets valuation 31 exchange portfolio income return in the the year the year movement movement September exchan

  25. Slide 25: Income in line with expectations

    Income in line with expectations (£m) 0 5 10 15 20 25 30 35 40 Economic infrastructure - interest European projects UK projects Economic infrastructure - dividends Non-income cash Non-portfolio interest Sep-20 Sep-19 25

  26. Slide 26: Discount rate movement

    Discount rate movement The weighted average discount rate is 11.2% Portfolio weighted average discount rate 11.3% 11.2% 10.8% 10.5% 9.9% 10.0% Mar-16 Mar-17 Mar-18 Mar-19 Mar-20 Mar-21 Sep-20 26

  27. Slide 27: Hedging programme mitigates volatility

    Hedging programme mitigates volatility (£m) FX gain before FX gain after hedging hedging ▪ Hedged assets (€/SGD/DKK/NOK) 29 5 Note: SGD exposure is within Oystercatcher, a euro denominated investment. 27

  28. Slide 28: Sensitivities to total return

    Sensitivities to total return Inflation linkage Assets with revenues: 12% Sensitivity +1% point -1% point Directly linked to inflation Change in inflation over £21m £(21)m underlying assumption for next 2 years Partly linked to inflation 88% 1% 1% Foreign exchange 7% GBP Sensitivity +5% -5% EUR/SGD

  29. Slide 29: Introduction and Background

    Introduction and Background Experienced and well resourced team established in 2006 Phil White Managing Partner Stephane Chris Rowland Bernardo Jim Stoner Thomas Fodor James Dawes Scott Moseley Aaron Church Anna Dellis Grand- John Cavill Nigel Middleton Strategy Sottomayor Senior Counsel IR (D) CFO

  30. Slide 30: Governance and fees

    Governance and fees • Independent Chair, five independent non-executive directors and one 3i Group appointed non-executive director • Committed to observe requirements of the AIC Code of Corporate Governance Board of • Responsibilities include: Directors – overall supervision of 3i Investments plc a

  31. Slide 31: 3i Infrastructure plc

    3} Infrastructure plc