Slide 1: Updates on Luzon Power Situation Outlook for 2022
CD Updates on Luzon Power Situation Outlook for 2022 “OW

Slide 2: Overview
© Overview 01 Background on Luzon Power Supply 02 03 DOE’s Luzon About the Power Situation Interruptible Load Outlook for 2022 Program STRICTLY CONFIDENTIAL— FOR INTERNAL USE ONLY (I) MERALCO

Slide 3: Background on Luzon Power Supply
01. Background on Luzon Power Supply

Slide 4: Luzon Generation Capacity, 2020
TN (I) MERALCO © CD. LUZON GENERATION CAPACITY, 2020 mCoal mOil = Natural Gas mGeothermal mBiomass mHydro mSolar m Wind 17,344 MW INSTALLED CAPACITY Source: DOE List of Existing Plants as of 31Dec2020 15,645 MW DEPENDABLE CAPACITY STRICTLY CONFIDENTIAL— FOR INTERNAL USE ONLY * Installed generating c

Slide 5: Power plant availability is affected by age and fuel source availability
©, CD. MON (J) Meraico |}—— Power plant availability is affected by age and fuel source availability. About 70% of capacity in Luzon is 16 years and older, requiring more frequent maintenance and repair. Around 20% is dependent on the availability of natural resources, further reducing sources that

Slide 6: System Capacity and Demand Profile
>ystem Capacity and Demand Profile Luzon Grid Capacity and Demand for 2007 to 2021 “Rated and Available Capacity Coincident with the date occurrence of the System Peak Demand Peak Demand based on System Peak Aggregate Annual Submission to DOE Growth Rate in %

Slide 7: Days Affected by Yellow and Red Alerts in Luzon
DAYS AFFECTED BY YELLOW AND RED ALERTS IN LUZON Yellow Red 51 22 15 15 9 10 6 7 3 2 4 3 2 1 1 2014 2015 2016 2017 2018 2019 2020 2021 AS OF 31JAN2022 7

Slide 8: Grid Alerts and System Conditions
CD OH (I) MERALCO Grid Alerts and System Conditions Working within normal operating limits of System Frequency, Voltage, and ; (Normal) all transmission line and equipment loading Dispatchable Normal + Operating Margin is sufficient Reserve + Grid configuration allows for interruption and isolation

Slide 9: DOE's Luzon Power Situation Outlook for 2022
02. DOE’s Luzon Power Situation Outlook for 2022

Slide 10: Power Supply Assessment - Power Outlook for CY 2022
seco + Power Supply Assessment - Power Outlook for CY 2022 BASECASE — NO YELLOW ALERT Gross Operating Margin (No Plants on Outage) Ml Operating Margin (MW) SEEBHVOC trom Visayas EB Oirginin U2 Rent Rogudation Reserve Req'd Cantingoney Reserve eit d Dispatchable Reserve DOE Demand Forecast for CY2022

Slide 11: With Revised Maintenance Schedules - Power Outlook for CY 2022
With Revised Maintenance Schedules- Power Outlook for CY 2022 (w/ Forced Outage) Gross Operating Margin (No Plants on Outage) mmm Operating Margin (MW} ummm HVDC from Visayas mame Dinginin Unit 2 SMC Mariveles 1 eereer ner cerrage V7 REV PMS WITH AVE, FO Req'd Regulating Reserve Req'd Contingency Re

Slide 12: Summary of DOE's Luzon Power Situation Outlook for 2022
NOW (I) MERALCO Summary of DOE’s Luzon Power Situation Outlook for 2022 (as of 25 January 2022) ‘ay & = LAT; ot? (Ace Ba e WOKS Cds : * Luzon demand is expected to reach to 12,387 + Luzon demand is expected to reach to 6 . , 12,387 MW (7 6.4%) during Week 21 (May MW (T 6.4%) during Week 21 (May 23-2

Slide 13: About the Interruptible Load Program
03. About the Interruptible Load Program

Slide 14: About the Interruptible Load Program (ILP)
© CD OH (I) MeRALcCO ~|—— About the Interruptible Load Program (ILP) ¢ ILP was promulgated under ERC Resolution No. 8 Series of 2010 and amended by Resolution No. 8 Series of 2013, No. 5 Series of 2015, and No. 3 Series of 2019 ¢ ILP was first implemented in Visayas and Mindanao to ration limited po

Slide 15: About the Interruptible Load Program (ILP)
© CD OH (I) MERALCO About the Interruptible Load Program (ILP) * Customers interested to participate in ILP are required to: (i) provide committed de- loading capacity and preferred de-loading window, (ii) identify contact person/s for notification, and (iii) finalize baseline consumption profile fo

Slide 16: About the Interruptible Load Program (ILP)
© CD. About the Interruptible Load Program (ILP) (I) MERALCO * As of 31 December 2021, the total capacity available for de-loading in MERALCO’s area is 563.09 MW from 124 companies * During implementation in 2021, ILP has spared at least 700,000 households from rotating power interruptions

Slide 17: Thank You!
THANK YOU!
Source: company website
More decks from Manila Electric Co.
9M 2026 Earnings Presentation56 slides · Oct 28, 2026
H1 2026 Earnings Presentation32 slides · Jul 29, 2026
Q1 2026 Earnings Presentation48 slides · May 4, 2026
Q4 2025 Earnings Presentation54 slides · Feb 25, 2026
Investor Presentation (2025)47 slides · Nov 28, 2025
Q3 2025 Earnings Presentation48 slides · Nov 1, 2025