Maritana Minerals Limited · ASX:MRT

Maritana Minerals — IMARC Sydney (October 2026)

30 slides from Maritana Minerals's conference presentation, Oct 27, 2026

  1. Slide 1: 2.1Moz delivering WA's next +100koz pa gold producer

    rsonal use only 2.1Moz delivering WA’s next +100koz pa gold producer IMARC – Sydney Investor Presentation 27 October 2026

  2. Slide 2: Important disclaimers

    Important disclaimers Nature of Document This Presentation is provided on the basis that neither the Company nor its respective officers, shareholders, Not an offer related bodies, corporate, partners, affiliates, employees, representatives or advisers, make any The information contained in the Pres

  3. Slide 3: Important disclaimers: Forward Looking and Cautionary Statement

    Important disclaimers Forward Looking and Cautionary Statement As noted above, some statements in this Presentation regarding estimates or future events are forward looking statements. They include indications of, and guidance on, future earnings, cash flow, costs and financial performance. Forward

  4. Slide 4: Investment proposition

    Investment proposition Projects An attractively priced West Australian gold Regional Landholding developer with near-term growth potential +1,300km² Carnarvon Mineral Resource Estimate2 2.15Moz: 41.8Mt @ 1.6g/t Au rsonal use only Targeting +100koz p.a. production from three 20.2Moz Ag 104kt Zn produ

  5. Slide 5: Corporate Snapshot

    Corporate Snapshot An attractively priced West Australian gold developer with near-term growth potential Share Trading & Price Capital structure Units Current rsonal use only Share price A$/sh 0.55(1) Ordinary shares M 373.3(1) Options and performance rights M 4.7(1) Market capitalisation A$M 205 Ca

  6. Slide 6: Board and Management

    Board and Management Deep experience in operations and value delivery rsonal use only Ashok Parekh Grant Haywood Rob Waugh Warren Hallam Isabel Macchia Non-Executive Chair Managing Director Non-Executive Director Non-Executive Director Company Secretary Elizabeth Jones Christian Price Brendan Shalde

  7. Slide 7: Commanding position in the WA Goldfields

    Commanding position in the WA Goldfields Strategically constructed gold portfolio centered around major geological structures and infrastructure • Large +1,300km land package within 100km of 2 rsonal use only Kalgoorlie • 2.15Moz Group Mineral Resource1 (41.8Mt @ 1.6g/t Au) • All significant deposit

  8. Slide 8: +100kozpa Hub and Spoke Model

    +100kozpa Hub and Spoke Model Three production hubs deliver 546koz recovered to Black Swan over 2027–20321 COOLGARDIE – WESTERN HUB BLACK SWAN – NORTHERN HUB rsonal use only 100–110km 42–48km Burbanks OP · Rose Hill Penny’s Find UG · Kalpini 2028 – 2032 165koz 2028 – 2032 75koz Resource remaining2 6

  9. Slide 9: +100kozpa Hub and Spoke Model

    +100kozpa Hub and Spoke Model Multiple ore sources in the mine plan, with additional upside through exploration success and M&A rsonal use only Mine plan underpinned by only ~0.6Moz of the 2.15Moz resource 120 114 114 111 12 14 100 26 92 Gold at Boorara extends below 81 30 planned pit Gold Recovered

  10. Slide 10: Black Swan Processing Hub

    Black Swan Processing Hub1 PROCESSING Facilitates hub and spoke operating model • ~50km northeast of Kalgoorlie rsonal use only • Updated FEED Study1 fully utilises existing 2.5Mtpa processing capacity • 100% of ore feed from MRT owned assets • Plant refurbishment underway - estimated infrastructure

  11. Slide 11: Black Swan Processing Hub: Early Works and Demolition Complete

    Black Swan Processing Hub Early Works and Demolition – Complete rsonal use only 11

  12. Slide 12: Black Swan Processing Hub

    Black Swan Processing Hub Exiting Sulphide Floatation Circuit to be retained for potential future ore processing rsonal use only 12

  13. Slide 13: Black Swan Processing Hub: Refurbishment Phase

    Black Swan Processing Hub Refurbishment Phase – Underway Early Works1 rsonal use only 1. Refer ASX Announcement “Early Works Commence at Black Swan Processing Hub” dated 20 June 2026 13

  14. Slide 14: Black Swan Processing Hub: Construction Phase

    Black Swan Processing Hub Construction Phase – Early Works1 Underway – Long lead items ordered rsonal use only 1. Refer ASX Announcement “Early Works Commence at Black Swan Processing Hub” dated 20 June 2026 14

  15. Slide 15: Black Swan Processing Hub: Final Plant Arrangement

    Black Swan Processing Hub Final Plant Arrangement – Gold CIL processing circuit with floatation ore processing optionality rsonal use only 15

  16. Slide 16: Three Production Hubs

    Three Production Hubs PRODUCTION Cash flow and future baseload open pit feed • Boorara existing stockpile 460kt (14.2koz) – a de-risked startup rsonal use only • Baseload open pit feed with supplementary high grade underground sources • Early mine plan underpinned by high confidence Mineral Resource

  17. Slide 17: Kalgoorlie – Eastern Hub

    Kalgoorlie – Eastern Hub Largest feed source Boorara open pit restart and high-grade Cannon underground rsonal use only 305.8koz 1,054koz 64–110km Scoping-study feed, 2026 Resource, gold Haul to the Black recovered (10 deposits) Swan plant GROWTH POTENTIAL • Unscheduled resource sources: Several sou

  18. Slide 18: Kalgoorlie – Eastern Hub - Boorara Project

    Kalgoorlie – Eastern Hub - Boorara Project1 Initial baseload feed for the Black Swan Processing Hub rsonal use only Mineralisation continues at depth2 1. Refer ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated 17 February 2026 2. Refer ASX Announcement “Boorara M

  19. Slide 19: Boorara Project: Mineralisation continues at depth

    Kalgoorlie – Eastern Hub - Boorara Project1 Mineralisation continues at depth below the existing pit1 rsonal use only 1. Refer ASX Announcement “Boorara Mineralisation Extended Below Planned Pit’” dated 24 September 2026 19

  20. Slide 20: Coolgardie – Western Hub

    Coolgardie – Western Hub Second baseload feed from Burbanks open pit, supported by Rose Hill underground rsonal use only 164.7koz 885koz 100–110km Scoping-study 2026 Resource, Haul to the Black feed, recovered gold (3 deposits) Swan plant GROWTH POTENTIAL • Burbanks: 755koz after a 62% (Burbanks Nor

  21. Slide 21: Burbanks Project

    Burbanks Project1 Second open pit base load feed rsonal use only 1. Refer ASX Announcement “Studies Support Standalone Gold Development in WA Goldfields’” dated 17 February 2026 21

  22. Slide 22: Burbanks MRE Update

    Burbanks MRE Update1 Phase 1 drilling increases resource by 62% to +750koz rsonal use only 1. Refer ASX Announcement “High-Grade Burbanks Deposit Increases 62% to 750koz” dated 11 September 2026 22

  23. Slide 23: Black Swan – Northern Hub

    Black Swan – Northern Hub Processing hub restart and late-stage baseload feed from Penny’s Find and Kalpini rsonal use only 74.4koz 288koz 42–48 km Scoping-study 2026 Resource, Haul to the Black feed, recovered gold (5 deposits) Swan plant GROWTH POTENTIA:L • Unscheduled resource: Gordons Dam 28koz

  24. Slide 24: Key Milestones and Timing

    Key Milestones and Timing Pathway to gold production FY 2027 FY 2028 Area Work Streams and Deliverables Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 rsonal use only Burbanks MRE Update Development & Growth Resource Extension & Grade Control drilling Open Pit Boorara Ore Stockpiling & Mining Mining & Underground Mobilisa

  25. Slide 25: An Emerging Standalone Gold Producer

    An Emerging Standalone Gold Producer rsonal use only Combination of Drilling now Pathway to Highly experienced 2.15Moz of Mineral extending and standalone Board and Resource1 and enhancing MRT’s +100kozpa gold Management with processing growing resource production by H2 strong Goldfields infrastruct

  26. Slide 26: Contact Us

    rsonal use only Contact Us Grant Haywood Managing Director and CEO +61 (08) 9386 9534 [email protected] maritanaminerals.com.au PO Box 1064 West Perth WA 6872

  27. Slide 27: Appendix

    rsonal use only Appendix

  28. Slide 28: Mineral Resource Estimate: Gold projects

    Mineral Resource1 Estimate Gold projects Project Measured Indicated Inferred Total kt Au (g/t) koz kt Au (g/t) . koz kt Au (g/t) koz kt Au (g/t) koz rsonal use only Baden Powell 596 1.20 23 596 1.20 23 Boorara 498 1.12 18 6,231 1.27 254 2,547 1.26 103 9,276 1.26 375 Boorara SP 463 0.95 14 463 0.95 1

  29. Slide 29: Ore Reserve Estimate: Gold projects

    Ore Reserve1 Estimate Gold projects MARITANA MINERALS GOLD ORE RESERVE SUMMARY Project Cutoff Proven Probable Total rsonal use only Au ppm kt Au g/t Koz kt Au g/t Koz kt Au g/t Koz Boorara 0.5 247 1.10 9.1 1,445 1.40 62.7 1,691 1.36 71.8 Cannon UG 1.0 135 4.10 17.7 135 4.10 17.7 Penny's Find UG 1.5

  30. Slide 30: Mineral Resource Estimate: Nimbus silver-zinc project

    Mineral Resource1 Estimate Nimbus silver-zinc project Nimbus All Lodes (bottom cuts 12 g/t Ag, 0.5% Zn, 0.3g/t Au) rsonal use only Category Mt Ag (g/t) Au (g/t) Zn (%) Ag (Moz) Au (kt) Zn (kt) Measured Resource 3.62 102 0.09 1.2 11.9 10 45 Indicated Resource 3.18 48 0.21 1.0 4.9 21 30 Inferred Resou