Agnico Eagle Mines Limited · TSX:AEM

Agnico Eagle Mines — Bank of America Merrill Lynch 20th Annual Canada Mining Conference 2014

29 slides from Agnico Eagle Mines's conference presentation, Sep 4, 2014

  1. Slide 1: Bank of America Merrill Lynch 20th Annual Canada Mining Conference

    Slide 1: Bank of America Merrill Lynch 20th Annual Canada Mining Conference

    BANK OF AMERICA MERRILL LYNCH 20TH ANNUAL CANADA MINING CONFERENCE Toronto, Ontario September 4, 2014

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS The information in this presentation has been prepared as at September 4, 2014. Certain statements contained in this document constitute “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looki

  3. Slide 3: Notes to Investors

    Slide 3: Notes to Investors

    NOTES TO INVESTORS Note Regarding the Use of Non-GAAP Financial Measures This document discloses certain measures, including ‘‘total cash costs per ounce’’ and ‘‘minesite costs per tonne’’ that are not recognized measures under US GAAP. This data may not be comparable to data presented by other gold

  4. Slide 4: Agnico Eagle – A Premium Gold Equity

    Slide 4: Agnico Eagle – A Premium Gold Equity

    AGNICO EAGLE – A PREMIUM GOLD EQUITY Delivering on Production 45% Expected Experienced Management Guidance Production with Diversified Growth Technical Through Expertise 2016* Pipeline 2014 AISC Expected to expected to Drive Future be below Production $1000 per Growth ounce RUNNING A MANAGEABLE BUSI

  5. Slide 5: 2014 H1 Highlights

    Slide 5: 2014 H1 Highlights

    2014 H1 HIGHLIGHTS  Gold production of 692K oz – Total cash costs at $579/oz, better than $678/oz guidance  Joint acquisition with Yamana Gold of Osisko Mining Corporation completed on June 16, 2014 – 43-101 reserve and resource update recently completed for the Canadian Malartic mine; studies und

  6. Slide 6: Q2 2014 Operating Results

    Slide 6: Q2 2014 Operating Results

    Q2 2014 OPERATING RESULTS CONTINUED STRONG OPERATING PERFORMANCE Q2 2014 YTD 2014 All amounts are in US$ Production Total Cash Cost* Total Cash Cost* Operating Margin ($000’s) Production (Gold oz) (Unless Otherwise Indicated) (Gold oz) ($/oz) ($/oz) Northern Business LaRonde 48,494 $691 $27,820 107,

  7. Slide 7: Q2 2014 Financial Results

    Slide 7: Q2 2014 Financial Results

    Q2 2014 FINANCIAL RESULTS CONTINUED STRONG OPERATING RESULTS AND LOW COSTS DRIVE EARNINGS AND CASH FLOW PERFORMANCE All amounts are in US$ (Unless Otherwise Indicated) Q2 2014 Q2 2013 H1 2014 H1 2013 Realized Gold Price ($/oz) $1,291 $1,336 $1,300 $1,474 Revenues (millions) $438 $336 $930 $757 Earni

  8. Slide 8: Financial Position

    Slide 8: Financial Position

    FINANCIAL POSITION CASH, EXPECTED CASH FLOWS AND AVAILABLE CREDIT PROVIDE FLEXIBILITY All Amounts Are In US$ (Unless Otherwise Indicated) June 30, 2014 Cash And Cash Equivalents (millions) $241 Outstanding Debt (millions) $1,320 Available Credit Facilities (millions) $680 Common Shares Outstanding,

  9. Slide 9: Northern Business – Finland and Canada

    Slide 9: Northern Business – Finland and Canada

    NORTHERN BUSINESS – FINLAND AND CANADA GENERALLY REQUIRE MORE CAPITAL, BUT TEND TO HAVE LONG LIFE PRODUCTION H1 2014 HIGHLIGHTS  Production and service hoist drive upgrade completed 107,846 ozs LARONDE at a total cash cost of  Production from the deeper mine expected to increase in H2 $642/oz 2014

  10. Slide 10: Southern Business – Mexico

    Slide 10: Southern Business – Mexico

    SOUTHERN BUSINESS – MEXICO GENERALLY LOWER CAPITAL COST ASSETS WITH POTENTIAL FOR SIGNIFICANT CASH FLOW GENERATION H1 2014 HIGHLIGHTS  Costs in the 2014 period were favorably impacted by shorter 89,195 ozs hauls and better drilling and blasting performance (lower at a total cash cost of explosives

  11. Slide 11: Exploration & Development

    Slide 11: Exploration & Development

    EXPLORATION & DEVELOPMENT

  12. Slide 12: Project Pipeline Expected to Provide Further Growth

    Slide 12: Project Pipeline Expected to Provide Further Growth

    PROJECT PIPELINE EXPECTED TO PROVIDE FURTHER GROWTH Expansion EXPLORATION ADVANCED DEVELOPMENT & EXPANSIONS FEASIBILITY IVR Meliadine NORTHERN BUSINESS Kittila Plant Expansion Hanhimaa Rimpi Development Bousquet 5 UG Kirkland Lake Partnership (50%) Goldex Satellites Akasaba West Pinos Altos Satellit

  13. Slide 13: Significant Exploration Footprint Near Meadowbank

    Slide 13: Significant Exploration Footprint Near Meadowbank

    SIGNIFICANT EXPLORATION FOOTPRINT NEAR MEADOWBANK IVR (APPROXIMATELY 50KM FROM MEADOWBANK) AND GREYHOUND PROJECTS PROVIDE POTENTIAL EXPLORATION UPSIDE AGNICO EAGLE | 20TH ANNUAL CANADA MINING CONFERENCE| 13

  14. Slide 14: IVR Discovery Near Meadowbank Continues to Expand

    Slide 14: IVR Discovery Near Meadowbank Continues to Expand

    IVR DISCOVERY NEAR MEADOWBANK CONTINUES TO EXPAND FOUR MINERALIZED ZONES HAVE BEEN OUTLINED – MINERALIZATION OPEN IN ALL DIRECTIONS IVR14-050 7.60 g/t Au / 3.3 m IVR14-057 5.63 g/t Au / 12.8 m Incl. 11.68 g/t Au / 4.6 m IVR14-051 4.46 g/t Au / 2.9 m IVR14-060 4.59 g/t Au / 2.7 m And 10.06 g/t Au / 3

  15. Slide 15: Meliadine

    Slide 15: Meliadine

    MELIADINE 2014 DRILLING EXPECTED TO FURTHER EXPAND RESOURCE BASE Proven Gold Reserves (million oz) 0.01 (0.03 M tonnes @ 7.31 g/t) Probable Gold Reserves (million oz) 2.8 (11.9 M tonnes @ 7.38 g/t) Indicated gold resource (million oz) 3.1 (19.0 M tonnes @ 5.05 g/t) Inferred gold resource (million oz

  16. Slide 16: Meliadine Deposit Locations

    Slide 16: Meliadine Deposit Locations

    MELIADINE DEPOSIT LOCATIONS 38,000 METRES OF INFILL AND CONVERSION DRILLING CARRIED OUT ON MULTIPLE ZONES AGNICO EAGLE | 20TH ANNUAL CANADA MINING CONFERENCE| 16

  17. Slide 17: 2014 LaRonde Deep Exploration Program

    Slide 17: 2014 LaRonde Deep Exploration Program

    2014 LARONDE DEEP EXPLORATION PROGRAM DRILLING FOCUSED ON UPGRADING RESOURCES BELOW 3.1 KM • A 3,600 metre drill program scheduled to be carried out to develop new resources at depth • A 2,500 metre drill program is planned for the 20 North Zone - good potential for conversion of resources to reserv

  18. Slide 18: Ramp Development Accelerated Into Top of the D Zone

    Slide 18: Ramp Development Accelerated Into Top of the D Zone

    RAMP DEVELOPMENT ACCELERATED INTO TOP OF THE D ZONE DEVELOPMENT OF ADDITIONAL SATELLITES COULD POTENTIALLY EXTEND MINE LIFE • Development is progressing on the M2, M5 and E2 satellite zones • A new surface portal has been collared and the old ramp is being refurbished to provide access to the M3 and

  19. Slide 19: Deep Drilling Extends Suuri Zone at Depth

    Slide 19: Deep Drilling Extends Suuri Zone at Depth

    DEEP DRILLING EXTENDS SUURI ZONE AT DEPTH MINERALIZATION APPEARS OPEN APPROXIMATELY 240M BELOW CURRENT RESERVES ROD14-002C 6.81 g/t Au / 6.4 m Incl. 12.0 g/t Au / 2.2 m AGNICO EAGLE | 20TH ANNUAL CANADA MINING CONFERENCE| 19

  20. Slide 20: Exploring Bulk Tonnage Porphyry Targets Close to La India

    Slide 20: Exploring Bulk Tonnage Porphyry Targets Close to La India

    EXPLORING BULK TONNAGE PORPHYRY TARGETS CLOSE TO LA INDIA ARROYO HONDO TARGET YIELDS ENCOURAGING RESULTS Drill highlights include: AH-13-010 0.33 g/t Au over 111m AH-14-014 0.27 g/t Au over 347m incl. 0.87 g/t Au over Both high Sulphidation and Porphyry targets have 35.7m been defined to date AH-14-

  21. Slide 21: Summary

    Slide 21: Summary

    AGNICO EAGLE SUMMARY

  22. Slide 22: Future Catalysts

    Slide 22: Future Catalysts

    FUTURE CATALYSTS  Details on the optimization plan for Canadian Malartic expected to be presented by the Partnership by the end of Q3 2014  Anticipated update to 2015 guidance by the end of Q3 2014  Completion of 1,000 tpd mill expansion at Kittila expected by year end-2014  Update on Akasaba We

  23. Slide 23: Increased 2014 Production and Lower Cost Guidance

    Slide 23: Increased 2014 Production and Lower Cost Guidance

    INCREASED 2014 PRODUCTION AND LOWER COST GUIDANCE STRONG OPERATIONAL PERFORMANCE AND OSISKO ACQUISITION DRIVES 14% INCREASE FROM ORIGINAL GUIDANCE OF 1.19M OZ Payable Gold Production Profile Northern Business (oz) Southern Business (oz) Annual Production Cash Cost 1,546,000 1,590,000 $640 $672 $663

  24. Slide 24: Appendix

    Slide 24: Appendix

    APPENDIX

  25. Slide 25: Gold and Silver Reserves and Resources

    Slide 25: Gold and Silver Reserves and Resources

    GOLD AND SILVER RESERVES AND RESOURCES DECEMBER 31, 2013 Gold Silver Tonnes Gold Gold Tonnes Silver Silver (000’s) (g/t) (ounces) (000’s) (000’s) (g/t) (ounces) (000’s) Proven & Probable Reserves Northern Business 93,618 4.60 13,841 24,127 19.59 15,192 Southern Business 55,800 1.69 3,024 28,703 64.3

  26. Slide 26: Copper, Zinc and Lead Reserves and Resources

    Slide 26: Copper, Zinc and Lead Reserves and Resources

    COPPER, ZINC AND LEAD RESERVES AND RESOURCES DECEMBER 31, 2013 Copper Zinc Lead Tonnes Copper Copper Tonnes Zinc Zinc Tonnes Lead Lead (000’s) (%) (tonnes) (000’s) (%) (tonnes) (000’s) (%) (tonnes) Proven & Probable Reserves Northern Business 24,127 0.25 59,519 24,127 0.67 161,108 24,127 0.04 9,964

  27. Slide 27: Notes to Investors Regarding the Use of Resources

    Slide 27: Notes to Investors Regarding the Use of Resources

    NOTES TO INVESTORS REGARDING THE USE OF RESOURCES Cautionary Note to Investors Concerning Estimates of Measured and Indicated Resources This document uses the terms “measured resources” and “indicated resources”. Investors are advised that while those terms are recognized and required by Canadian re

  28. Slide 28: Notes to Investors Regarding the Use of Resources

    Slide 28: Notes to Investors Regarding the Use of Resources

    NOTES TO INVESTORS REGARDING THE USE OF RESOURCES A mineral reserve is the economically mineable part of a measured and/or indicated mineral resource. It includes diluting materials and allowances for losses, which may occur when the material is mined or extracted and is defined by studies at pre-fe

  29. Slide 29: agnicoeagle.com

    Slide 29: agnicoeagle.com

    Trading Symbol: AEM on TSX & NYSE Investor Relations: 416-947-1212 [email protected] agnicoeagle.com

Source: Internet Archive copy of ir.agnicoeagle.com