  1. Slide 1: Jericho Energy Ventures Corporate Presentation

    JERICHO ENERGY VENTURES An AI Data Center Platform Built on Oklahoma Energy and Local Partnership Land • Power • Gas • Water • Fiber TSXV: JEV • OTC: JRO OF • FRA: JLM Corporate Presentation • Oct 2026 Je richoEnergyVentures.com

  2. Slide 2: Forward-Looking Statements & Disclaimer

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M FORWARD-LOOKING STATEMENTS & DISCLAIMER IMPORTANT INFORMATION: This document has been prepared by Jericho Energy Ventures Inc. (the “Company” CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION AND FORWARD-LOO

  3. Slide 3: AI Infrastructure Built on an Energy Foundation

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M AI INFRASTRUCTURE BUILT ON AN ENERGY FOUNDATION Jericho is an AI data-center developer whose moat is energy. In an AI buildout gated by power, the company that controls generation, fuel, and transmission control

  4. Slide 4: Why This Moment — Why Us

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M WHY THIS MOMENT — WHY US AI IS THE LARGEST infrastructure BUILDOUT IN MODERN HISTORY. $5.2 TRILLION required for global data-center buildout by 2030 T H AT ' S E Q U A L T O — I N F L AT I O N -A D J U S T E D T

  5. Slide 5: The Structural Shift — Power Precedes Compute

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M THE STRUCTURAL SHIFT — POWER PRECEDES COMPUTE Power, not land, is now the gating asset. The build sequence has inverted — sites with pre-secured generation, transmission, and fuel now set the pace for hyperscale

  6. Slide 6: The Energy Foundation — Bringing Compute to the Energy

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M THE ENERGY FOUNDATION — BRINGING COMPUTE TO THE ENERGY One integrated platform across the full delivery stack. Vertical integration compresses time-to-power and converts each layer of infrastructure from a cost

  7. Slide 7: Black Bear Campus

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M BLACK BEAR CAMPUS A vertically integrated AI data-center campus in north central Oklahoma. Positioned within the state’s emerging AI training corridor — between operating hyperscale campuses near Stillwater and

  8. Slide 8: Strategic Partnership — Comstock (CHCI)

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M STRATEGIC PARTNERSHIP — COMSTOCK (CHCI) A public-company real-estate developer joins the foundation. Jericho brings the energy and land; Comstock brings four decades of entitlement, development, and asset-manage

  9. Slide 9: Vertical Integration — Speed to Market, Margin to Profit

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M VERTICAL INTEGRATION — SPEED TO MARKET, MARGIN TO PROFIT Each phase compounds capacity and margin on the same platform. Powered land plus planned on-site generation converts infrastructure spend into recurring,

  10. Slide 10: The Re-Rating Opportunity

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M THE RE-RATING OPPORTUNITY A recognition gap, not a valuation gap. JEV is a thinly traded micro-cap with the assets of a digital-infrastructure developer; comparable AI- data-center operators trade at a large pre

  11. Slide 11: A Massive, Structural Demand Backdrop

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M A MASSIVE, STRUCTURAL DEMAND BACKDROP Demand is outrunning the grid — and concentrating where power is cheap. The mid-continent is the fastest-growing low-cost energy region in North America for hyperscale and A

  12. Slide 12: Building Blocks for a Data-Center Portfolio

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M BUILDING BLOCKS FOR A DATA-CENTER PORTFOLIO Black Bear is the template — not the ceiling. The same power-first, vertically integrated model is replicable across additional energy-rich sites under evaluation. BLA

  13. Slide 13: Leadership & Expertise

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M LEADERSHIP & EXPERTISE A platform-grade team for a platform-grade business. Aligned across energy operations, data-center development, infrastructure, and capital markets. BRIAN WILLIAMSON JAKE ROYSTER COL. (RET

  14. Slide 14: Backed by a Strong Foundation of Shareholders

    J E R I C H O E N E R GY V E N T U R E S TS X V: J E V · OTC : J R O O F · F R A : J L M BACKED BY A STRONG FOUNDATION OF SHAREHOLDERS Aligned, long-term ownership across energy, media, technology, and real estate. Insiders and strategic holders own approximately 75% of shares outstanding. EDWARD BR

  15. Slide 15: Jericho Energy Ventures

    JER IC HO ENERGY VENTURES An AI Data Center Platform Built on Oklahoma Energy and Local Partnership Land • Power • Gas • Water • Fiber T S X V: J E V • OTC : J R O O F • FRA: JLM JerichoEnergyVentures.com