Graphano Energy Ltd. · TSXV:GEL

Graphano Energy — Investor Presentation (August 2025)

16 slides from Graphano Energy's investor presentation, August 2025

  1. Slide 1: The Power of Carbon

    THE POWER OF CARBON August 2025 TSX-V: GEL; FSE:97G0; OTCQB:GELEF 1

  2. Slide 2: Disclaimer

    Disclaimer This presentation contains certain forward-looking statements that reflect the current views and/or expectations of Graphano Energy Limited ("Graphano" or the "Company") with respect to its performance, business and future events, including statements regarding the Company's beliefs regar

  3. Slide 3: The Value Proposition

    The Value Proposition • Great Infrastructure – The Lac Aux Bouleaux (LAB) deposit is adjacent to the only graphite mine – Lac-des-Iles (LDI) – in North America and has readily available power and transport infrastructure. • The only resource-stage project next to the only graphite plant in North Ame

  4. Slide 4: About Graphite

    About Graphite Carbon Brushes 11% Graphite Applications • High melting point material essential to Automotive Parts Steel, Foundries & the refractory industry 14% Refractories 41% Batteries 10% • Good conductor of electricity used as an anode material, e.g., batteries Others 10% Lubricants 14% • Sof

  5. Slide 5: EVs are Here to Stay

    EVs are Here to Stay The EV Revolution is Driving Dramatic Demand for Electric Minerals As Graphite is the Main Anode Material for EV Batteries, Demand is Expected to Increase Significantly August 2025 5

  6. Slide 6: Graphite Demand for EVs

    Graphite Demand for EVs • Total current production of natural graphite is 1.6 million tonnes(1) • Graphite demand for EV batteries alone could increase to 5 million tonnes, opening the opportunity for dozens of new graphite mines to open in the next 5 to 10 years Graphite Demand ~5 million tonnes pe

  7. Slide 7: Geopolitical Pressures

    Geopolitical Pressures • Import costs: U.S. tariffs make Chinese graphite uncompetitive, opening opportunity for new suppliers • Higher prices: Combined tariffs on Chinese graphite exceed 160%, creating a pricing floor and urgent need for domestic supply • Canada’s Fast-Track Permitting: Federal tim

  8. Slide 8: Lac Aux Bouleaux (LAB) Project

    Lac Aux Bouleaux (LAB) Project • Infrastructure is excellent with road access and electrical power on site • High grade, near surface resource • The property contiguous to Northern Graphite Lac-des-Iles graphite mine and near the processing plant • Potential for near-term production • Agreement with

  9. Slide 9: LAB Prospecting Targets

    LAB Prospecting Targets August 2025 8

  10. Slide 10: Standard Mine Project

    Standard Mine Project • Graphano has 79 claims east of the • High grade near surface historical Standard resource mine, for a total 4,265 hectares • Economic proximity to LDI plant August 2025 13

  11. Slide 11: Mineral Resources

    Mineral Resources Property Zone Category Tonnes Cg (%) Indicated 250,000 8.96 Pit Zone Inferred 100,000 7.28 Indicated 70,000 5.92 LAB Zone 1 Inferred 120,000 5.81 Indicated 370,000 7.76 Zone 3 Inferred 380,000 6.89 Indicated 950,000 6.27 Standard Standard Inferred 980,000 7.16 Indicated 1,640,000 7

  12. Slide 12: Black Pearl Project Discovery Highlights

    Black Pearl Project Black Pearl Discovery Highlights • Survey Coverage: The Black Pearl graphite trend is 300m wide, with an approximate strike length of 1,200m and remains open • 42 channel samples: Were collected within ~1,200 m2 stripped bedrock area. Averaged 13.2% graphitic carbon (Cg) • High G

  13. Slide 13: Metallurgical Results

    Metallurgical Results Lac Aux Beauleaux Results: • Several samples from different zones were tested • Best results yielded a concentrate grade of 95% Cg, • Open circuit graphite recovery of 70%, close circuit projected to yield recoveries of 90% or higher. • Additional grinding/cleaning stage, shoul

  14. Slide 14: Project Development Timeline

    Project Development Timeline Infill and Expansion Drilling at LAB and Standard Flowsheet Financing, Joining Global Resource Exploration Drilling at Optimization Construction and Graphite Supply Black Pearl Feasibility Study mining Chain Estimation 3Q25 4Q25 2026 2027 2028 2028 Bulk Sample Expand Met

  15. Slide 15: Management Team and Directors

    Management Team and Directors Luisa Moreno, Ph.D., CEO - Dr. Luisa Moreno is the President and Chief Executive Officer of Graphano Energy Ltd . he is also the Managing Director of Tahuti Global Inc. In her diverse roles, Dr. Moreno serves on the boards of several companies developing strategic miner

  16. Slide 16: Financial Details and Contact

    Financial Details and Contact Number of Shares 17,088,268 Options 1.5 million Warrants 13,208,948 Shares fully diluted 31,747,216 Cash $0.7 million Market cap $3.0 million August 2024 Luisa Moreno, President an CEO [email protected] 219 - 120 Carlton Street Toronto, Ontario M5A 4K2 August 2025 26

Graphano Energy — Investor Presentation (August 2025) on 6ix