PDC Energy — Petroleum Development — The Oil & Gas Conference 2007
24 slides from PDC Energy's conference presentation, Aug 20, 2007
Slide 1: Form 8-K Cover Page
SECURITIES AND EXCHANGE COMMISSION WASHINGTON, DC 20549 FORM 8-K CURRENT REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES AND EXCHANGE ACT OF 1934 August 20, 2007 Date of report (Date of earliest event reported) Petroleum Development Corporation Exact Name of Registrant as Specified in Chart
Slide 2: Item 7.01 Regulation FD Disclosure
Item 7.01 Regulation FD Disclosure. Steven R. Williams, Chairman and CEO of Petroleum Development Corporation, will present at the Twelfth Annual Oil & Gas Conference in Denver, CO, on August 20, 2007, 5:10 PM ET. The transcript of the presentation is attached herein as Exhibit 99.1. EXHIBIT INDEX I
Slide 3: Petroleum Development Corporation - The Oil & Gas Conference
Petroleum Development Corporation The Oil & Gas Conference August 20-23, 2007 Denver Steven R. Williams, Chairman & CEO Thomas E. Riley, President NASDAQ GSM: PETD
Slide 4: Forward Looking Statements
Forward Looking Statements This information contains predictions, estimates and other forward-looking statements within the meaning of Section 27A of the Securities Act of Contact Information 1933 and Section 21E of the Securities Exchange Act of 1934. Although the Company Investor Relations believe
Slide 5: Company Snapshot
Company Snapshot Market Cap (08/09/07) 9 Approx. $700 Million Proved Reserves (12/31/06) 9 323 Bcfe (2006 58% PD) ¾ 500+ Bcfe (2007E) Production (2006) 9 16.9 Bcfe ¾ 28 Bcfe (2007E) Production Profile (2Q07) 9 78% N. Gas/ 22% Oil Rocky Mountains 9 85%+ (2007) Diluted Average Shares 9 14,
Slide 6: Core Operating Areas
Core Operating Areas Michigan Basin Rocky Mountains 2006 Proved Reserves: 21.2 Bcfe 2006 Proved Reserves: 265.5 Bcfe 2006 Production: 1.4 Bcfe 2006 Production: 14.1 Bcfe 2007E Production: 1.8 Bcfe 2007E Production: 24 Bcfe Appalachian Basin 2006 Proved Reserves: 36.0 Bcfe 2006 Production: 1.5 Bcfe 2
Slide 7: Acquisitions Summary
Acquisitions Summary • Proceeds from 2006 lease sale funded $209 Million in acquisitions ($191 Million Like-kind exchange tax deferred) – During December 2006 and January 2007 – 3P reserves acquired total an estimated 153 Bcfe (84% proved) – Acquisitions primarily in existing operating areas • Watte
Slide 8: Increasing Production
Increasing Production 30 28 Bcfe 07E 25 B c f E q u iv a le n ts 66% YOY Growth 20 15 10 5 0 96 97 98 99 00 01 02 03 04 05 20 6 E 0 07 19 19 19 19 20 20 20 20 20 20 20 Oil Natural Gas See slide 2 regarding Forward Looking Statement. 6
Slide 9: Increasing Estimated Proved Reserves
Increasing Estimated Proved Reserves 600 500+ Bcfe 07E 55%+ YOY Growth 500 BCF Equivalen 400 300 200 100 0 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Oil Natural Gas See slide 2 regarding Forward Looking Statement. 7
Slide 10: Energy Market Exposure
Energy Market Exposure Percentage of Production by Market (Based on Mcfe) Nymex, 12.4% Oil, 21.7% Michigan, 8.5% Northern Border, 0.5% Midcontinent, 15.9% Colorado Liquids, Colorado Interstate 3.7% Gas, 37.2% See slide 2 regarding Forward Looking Statement. 8
Slide 11: CIG Basis
CIG Basis Nymex and CIG Rates Actual through June 2007 Projected from July 2007 Forward as of 6/29/07 $10.00 $9.00 $8.00 _______ CIG $7.00 ____ Nymex $6.00 $5.00 $4.00 $3.00 $2.00 May-06 May-07 May-08 Apr-06 Oct-06 Apr-07 Oct-07 Apr-08 Mar-06 Aug-06 Nov-06 Mar-07 Aug-07 Nov-07 Mar-08 Jun-0 6 Jul-06
Slide 12: General Changes to 2007 Operational Plan
General Changes to 2007 Operational Plan • Increased net Grand Valley wells • Reduced net Wattenberg wells – Originally modeled Codell only completions; actual wells are mulitzone completions (J-sand, Codell and Niobrara, as appropriate) – Increased CAPEX in Codell refracs and Niobrara recompletions
Slide 13: 2007 Actual vs. Production Forecast
2007 Actual vs. Production Forecast 2007 Production Forecast • 2007 Estimates – Production of 28 Bcfe – Exit Rate of 100 Mmcfe/d 9 8 Mid-year production increase from: 7 Bcf Equivalents 6 • Late 2Q2007 Garden Gulch 5 compression facility start-up 4 (Grand Valley) 3 – Gross capacity increased from 17
Slide 14: Production Rate Progression
Production Rate Progression Average Daily Production (Mmcfe/d) 90 80 70 60 Dec-06 50 Jun-07 40 Jul-07 30 20 10 0 See slide 2 regarding Forward Looking Statement. 12
Slide 15: Drilling Activity
Drilling Activity 400 350 300 # of Wells 250 200 150 100 50 0 2002 2003 2004 2005 2006 2007E Gross Wells Net Wells See slide 2 regarding Forward Looking Statement. 13
Slide 16: Grand Valley Field, Piceance Basin, Colorado
Grand Valley Field Piceance Basin, Colorado 2007 Plan • July 2007 net daily production 27 Mmcfe/d (2006 exit rate was 15.4 Mmcfe/d) • Approximately 355 net locations on 10-acre spacing – 148 net PUD locations – 207 remaining unproved locations • Drill 41 net wells – 50 Bcfe added by drilling – $93 M
Slide 17: Grand Valley Achievements
Grand Valley Achievements 2005, 2006, 2007 Drill Curves • Reduced drilling time Days – Valley wells drilled in 11 2 4 6 8 10 12 14 16 18 20 days (2007) vs 18 days 0 (2005) 1000 2005 drilling days – Mesa top directional wells 2006 drilling days drilled in 15 days (2007) 2000 2007 drilling days • Impr
Slide 18: Wattenberg Field, DJ Basin, Colorado
Wattenberg Field DJ Basin, Colorado • July 2007 net daily production 28 Mmcfe/d (2006 net exit rate 18.6 Mmcfe/d) • 9,000 acres available for drilling • Over undeveloped 450 locations – 154 40 acre PUD locations – Over 300 remaining other locations (Rule 318A and other) – 800 Codell and/or Niobrara
Slide 19: Wattenberg Field, DJ Basin, Colorado
Wattenberg Field DJ Basin, Colorado Hybrid Niobrara Fracs 2007 Plan 800 • Drill 108 net wells 700 – Add estimated 34 Bcfe drilling 600 reserves 500 – Shifted focus from single zone to multi-zone completions (J- M C F e /D a y 400 sands, Codell, & Niobrara) 300 • 164 re-completions and re- 200 fracs
Slide 20: NECO Field Area, Eastern DJ Basin, Colorado
NECO Field Area Eastern DJ Basin, Colorado • July net daily production 11.6 Mmcfe/d (2006 net exit rate 8.5 Mmcfe/d) • 29,160 acres available for drilling • 8 defined structures (3D and 2D seismic) • 100 PUD locations • 200 potential locations See slide 2 regarding Forward Looking Statement. 18
Slide 21: NECO Field Area, Eastern DJ Basin, Colorado
NECO Field Area Eastern DJ Basin, Colorado NECO - Herbert #23-9 2007 Plan 10,000 10,000 • Drill 141 wells, PDC 100%WI • 31 Bcfe added by drilling • $33 Million D&C cost • Acquiring 50 square miles of M cf p er M o n th 1,000 1,000 M cf p er M o n th additional 3D seismic – Potential addition of 100-
Slide 22: Appalachian and Michigan Operation Areas
Appalachian and Michigan Operation Areas Appalachian Michigan Operated Wells 1365 206 2006 YE Proved Reserves 36.0 Bcfe 21.2 Bcfe 2007 Acquisition Proved 30.1 Bcfe 4.6 Bcfe Reserves * % of 2006 YE Proved 84% 22% 2007E Production* 2.6 Bcfe 1.8 Bcfe Increase from 2006* 86% 20% July 2007 Net Daily 6.2
Slide 23: Continuing Our Success
Continuing Our Success • Low-risk resource plays • Strong development inventory – Piceance, Wattenberg and Neco all have significant proved and unproved potential • Proven multi-basin operator – Barnett shale activity planned • Strong balance sheet • Skilled and experienced management and technical
Slide 24: Petroleum Development Corporation - The Oil & Gas Conference
Petroleum Development Corporation The Oil & Gas Conference August 20-23, 2007 Denver Steven R. Williams, Chairman & CEO Thomas E. Riley, President NASDAQ GSM: PETD
Petroleum Development — The Oil & Gas Conference 2007 on 6ix