Slide 2: Growth pipeline – electricity production and storage
2 03 · SUSTAINABLE GROWTH Growth pipeline – electricity production and storage Photovoltaic projects (PV) Wind projects (onshore) Battery storage (BESS) 46.5 MWp operational · 140.5 MWp under 133 MW 169.5 MWh in 4 projects · 780 MWh in 19 construction projects Crucea Est 133 MW Satu Mare 2 27 MWp Tu
Slide 3: In operation and under construction: 46.5 MW producing, 140 MW being built
3 03 · SUSTAINABLE GROWTH In operation and under construction: 46.5 MW producing, 140 MW being built # SUBSIDIARY – PROJECT MWP STAGE 1 SE Electrica SA (“ELSA”)* – Stănești and Vulturu 19.5 Operational 2 Sunwind Energy S.R.L. (“SWE”) – Satu Mare 2 27.0 Operational 3 New Trend Energy S.R.L. (“NTE”) –
Slide 4: Storage: the multi-site programme and its business model
4 03 · SUSTAINABLE GROWTH Storage: the multi-site programme and its business model STORAGE PIPELINE · MWH 2030 target · 900 MWh Fântânele 70 Vulturu 22.5 Bihor 1 17 Crucea Est 60 Multi-site (19) 780 Next steps Three value layers • Fântânele, Mureș – first BESS built by Electrica to be • Energy arbit
Slide 5: Crucea Est: our first wind project – moving into construction
5 03 · SUSTAINABLE GROWTH Crucea Est: our first wind project – moving into construction 133 MW 54 MW EUR 253 mn Q4 2027 / 2028 onshore wind, Constanța under a Contract for Difference: investment approved by phase 1 (54 MW, CfD) · phase 2 (67 county + 60 MWh battery fixed price for 15 years (CfD shar
Slide 6: Craiova: our first controllable generation (1/2) – the project
6 03 · SUSTAINABLE GROWTH Craiova: our first controllable generation (1/2) – the project Objective 2 – Ford Otosan (conditional upon Objective 1 – Craiova district heating (SACET) negotiations) Technology Gas engines in high-efficiency cogeneration Gas turbines in cogeneration Capacity ~82 MWe / 73.
Slide 7: Craiova (2/2): why gas, and how the contract protects the investment
7 03 · SUSTAINABLE GROWTH Craiova (2/2): why gas, and how the contract protects the investment Why a renewables company Contractual protections Our obligations and the checks builds gas cogeneration • Operating term: 10 years from • KPIs: system availability ≥97.26%, unit • An intermittent portfolio
Slide 8: Partnerships and a widening perimeter
8 03 · SUSTAINABLE GROWTH Partnerships and a widening perimeter Up to 400 MW Up to 500 MW 100% Romgaz Liberty Galați Electrica Moldova • Non-binding MoU, September 2025; • Non-binding MoU, February 2026; • Since 2026 a fully owned subsidiary in the greenfield, only renewables and storage renewables
Slide 9: The pipeline against the 2030 targets – management estimates
9 03 · SUSTAINABLE GROWTH The pipeline against the 2030 targets – management estimates GENERATION CAPACITY VS 1,000 MW TARGET · MW INDICATIVE COMMISSIONING CALENDAR FOR THE CURRENT excl. up to 900 MW with partners PIPELINE Production · MW commissioned Storage · MWh commissioned In operation (PV) 46.